Loading...
HomeMy WebLinkAboutCOASTAL CONSTRUCTION- PILE LOG133 MATERIAL TESTING ENGINEERING 3111 E s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889- Fax. 786.615-5801 January 25, 2021 Project No. 21-0028 Bodax Foundations, Inc. 1101 NW 55th Street Ft Lauderdale, FL 33309 Re.: Auger Cast Pile monitoring for the Private Residence. located at: 5000 Watersong Way, Fort Pierce, FL 34949 Dear Sir, Pursuant to your request, BIII MATERIAL TESTING ENGINEERING, LLC. conducted Auger Cast Pile monitoring for the above -referenced location on January 19, and 20, 2021. The work involved the installation of Fifty -Seven (57) 14" diameter cast in place house piles with a load capacity of 30 tons. The approximate grout volume used was 1,884.42 c.f. (69.80 yards). The attached monitoring logs and the sketch showing pile's location are enclosed along with this letter. We appreciate the opportunity to have been of service to your company. Please feel free to contact us if there is any question or comments pertaining to this letter. Resp bmitted, ���� I.1=I 1702 i Dario A. Herrero, P.E. Florida Reg. #67796 BIII Material Testing Engineering, LLC. Page114 B3 MATERIAL TESTING ENGINEERING 3111 E s s e n c e o f P e r f e c 1 i c) n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 AU GERED CAST PILE LOG Page214 ill 133 MATERIAL TESTING ENGINEERING 1676 West 31 PL., Hialeah FL, 33012- Off. 786.773,5871/89- Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT N0. 21-0028 DATE 19-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED 10:OOAM TIME JOB FINISHED 4:30PM PROJECT ADDRESS Private Residence 5000 Watersong Way, Fort Pierce, FL 34949 Al IC;FRCAST PILES LOG 1 Columns No. 1 2 3 4 5 6 7 8 9 10 2 Pile No. 3 4 1 13 14 47 41 40 42 47 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 25 25 25 25 25 25 25 25 25 25 5 Theoretical Pile Volume (cf) 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 6 Number of pump strokes 53 55 54 57 56 58 55 57 55 58 7 Volume per Pump Strokes (cf) 0,57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 8 Actual Grout Volume (cf), (6'7) 30.2 31.4 30.8 32.5 31.9 33.1 31.4 32.5 31.4 33,1 9 Volume Ratio (cf), (8/5) 1.1 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 10 Reinforcing Size 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 11 Reinforcing Length (ft) 25 24 25 25 25 25 25 25 25 23 12 Grout Truck Number 6000 6000 6000 1 6000 60001 6000 6000 4009 4009 4009 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"O.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; 1I rq 2J2, Dario A. Herrero,P.E Field Rep.: A.C. Fla. Reg. #67796 Asa mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior written approval for t13 Material Testing Engineering, L-C. Bill B3 MATERIAL TESTING ENGINEERING F s s c o f P e r f e c It 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT N0. 21-0028 DATE 19-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED 10:00AM TIME JOB FINISHED 4:30PM PROJECT ADDRESS Private Residence 150oo Watersong Way, Fort Pierce, FL 34949 AI KIFRCAST PILES LOG 1 Columns No. 11 12 13 14 15 16 17 18 19 20 2 Pile No. 16 15 26 31 2 46 48 49 32 43 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 25 25 25 25 25 25 25 25 25 25 Pile Volume (cf) 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 15TIneoretical umber of pump strokes 56 57 60 62 55 62 57 63 60 62 olume per Pump Strokes (cf) 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 ctual Grout Volume (cf), (6'7) 31.9 32.5 34.2 35.3 31.4 35.3 32.5 35.9 34.2 35.3 9 Volume Ratio (cf), (815) 1.2 1.2 1.3 1.3 1.2 1.3 1.2 1.3 1.3 1.3 10 Reinforcing Size 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 11 Reinforcing Length (ft) 24 25 25 25 25 25 25 25 25 25 12 Grout Truck Number 4009 4009 4009 4009 905 905 905 905 905 905 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"o.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; Dario A. Herrero,P.E Field Rep.: A.C. Fla. Reg. #67796 As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior written approval for 33 Material Testing Engineering, L-C. III B3 MATERIAL TESTING ENGINEERING E i f P e r f c C t i o r 1676 West 31 PL., Hialeah FL, 33012 -Off. 786.773.5871/89 -Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0028 DATE 19-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED 10:00AM TIME JOB FINISHED 4:30PM PROJECT ADDRESS Private Residence 5000 Watersong Way, Fort Pierce, FL 34949 AUGERCAST PILES LOG 1 Columns No. 21 22 23 24 25 26 1 27 28 29 1 30 2 Pile No. 45 53 35 52 51 50 33 44 34 28 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 25 25 25 25 25 25 25 25 25 25 5 Theoretical Pile Volume (cf) 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 6 Number of pump strokes 58 60 58 59 61 57 59 58 60 58 7 Volume per Pump Strokes (cf) 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 8 Actual Grout Volume (cf), (6'7) 33.1 34.2 33.1 33.6 34.8 32.5 33.6 33.1 34.2 33.1 9 Volume Ratio (cf), (815) 1.2 1.3 1.2 1.3 1.3 1.2 1.3 1.2 1.3 1.2 10 Reinforcing Size 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 11 Reinforcing Length (it) 25 25 25 25 23 25 25 24 25 25 12 Grout Truck Number 905 7017 7017 7017 7017 7017 7017 7017 7014 7014 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"o.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; Dario A. Herrero,P.E Field Rep.: A.C. Fla. Reg. #67796 Asa mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization far publication of statements, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior written approval for B3 Material Testing Engineering, LLC. III B3 MATERIAL TESTING ENGINEERING F s f P c— f 1 r 1676 West 31 PL., Hialeah FL, 33012 -Off. 786.773.5871/89 -Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0028 DATE 19-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED SO:OOAM TIME JOB FINISHED 4:30PM PROJECT ADDRESS Private Residence 5000 Watersong Way, Fort Pierce, FL 34949 AUGERCAST PILES LOG 1 Columns No. 31 32 33 34 35 2 Pile No. 17 18 7 6 5 3 Augered 0 (inches) 14 14 14 14 14 4 Pile Length (feet) 25 25 25 25 25 5 Theoretical Pile Volume (cf) 26.7 26.7 26.7 26.7 26.7 6 Number of pump strokes 59 60 57 58 61 7 Volume per Pump Strokes (cf) 0.57 0.57 0.57 0.57 0.57 8 Actual Grout Volume (cf), (6.7) 33.6 34.2 32.5 33.1 34.8 9 Volume Ratio (0, (815) 1.3 1.3 1.2 1.2 1.3 10 Reinforcing Size 4#5 4#5 4#5 4#5 4#5 11 Reinforcing Length (ft) 25 25 25 25 25 12 Grout Truck Number 7014 7014 7014 7014 7014 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"o.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; ziiZ, � Dario A. Herr ro,P.E Field Rep.: A.C. Fla. Reg. #67796 As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior written approval for B3 Material Testing Engineering, U.C. 3III B3 MATERIAL TESTING ENGINEERING E s o f P e r f e c, t i 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0028 DATE 20-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED 8:OOAM TIME JOB FINISHED 1:00PM PROJECT ADDRESS Private Residence 5000 Watersong Way, Fort Pierce, FL 34949 AUGERCAST PILES LOG 1 Columns No. 36 37 38 39 40 F41T42 43 44 45 2 Pile No. 57 24 55 54 36 1 37 39 38 29 20 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 25 25 25 25 25 25 25 1 25 25 25 5 Theoretical Pile Volume (cf) 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 6 Number of pump strokes 60 56 59 54 1 55 60 57 59 62 60 7 Volume per Pump Strokes (cf) 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 8 Actual Grout Volume (cf), (6"7) 34.2 31.9 33.6 30.8 31.4 34.2 32.5 33.6 35.3 34.2 9 Volume Ratio (cf), (815) 1.3 1.2 1.3 1.2 1.2 1.3 1.2 1.3 1.3 1.3 10 Reinforcing Size 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 11 Reinforcing Length (ft) 25 25 25 24 25 25 25 25 25 25 12 Grout Truck Number 7011 7011 7011 7011 7011 7011 7011 7010 7010 7010 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"o.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; Dario . Herrero,P.E I R #67796 Field Rep.: T.A. F a. eg. As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authoibation for publication of statements, conclusions or extracts from our reports Is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior written approval for B3 Material Testing Engineering, I.I.C. III B3 MATERIAL TESTING ENGINEERING F - c e, o f P e r f 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773,5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0028 DATE 20-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED 8:OOAM TIME JOB FINISHED 1:OOPM PROJECT ADDRESS Private Residence 5000 Watersong Way, Fort Pierce, FL 34949 AUGERCAST PILES LOG 1 Columns No. 46 47 48 49 50 51 52 53 54 55 2 Pile No. 8 30 19 9 56 25 21 22 23 12 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 25 25 25 25 25 25 25 25 25 25 5 Theoretical Pile Volume (cf) 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 6 Number of pump strokes 59 61 56 55 64 63 66 64 65 67 7 Volume per Pump Strokes (cf) 0.57 0,57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 8 Actual Grout Volume (cf), (6'7) 33.6 34.8 31.9 31.4 36.5 35.9 37.6 36.5 37.1 38.2 9 Volume Ratio (cf), (815) 1.3 1.3 1.2 1.2 1.4 1.3 1.4 1.4 1.4 1.4 10 Reinforcing Size 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 4#5 11 Reinforcing Length (ft) 25 25 25 24 25 25 25 25 25 25 12 Grout Truck Number 7010 7010 7010 7010 8001 8001 8001 8001 8001 8001 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"o.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; Z 2 02-j Dario A. Herrero,P.E Field Rep.: T.A. Fla. Reg. #67796' As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization forpublication of statements, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior written approval for B3 Material Testing Engineering, LLC. :::; III B3 MATERIAL TESTING ENGINEERING E s s e r . r , r f � c t i 1676 West 31 PL., Hialeah FL, 33012 -Off. 786.773.5871/89 -Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0028 DATE 20-Jan-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Hassam 954-771-7888 WEATHER Sunny TIME JOB STARTED 8:OOAM TIME JOB FINISHED 1:OOPM PROJECT ADDRESS Private Residence 15000 Watersong Way, Fort Pierce, FL34949 AUGERCAST PILES LOG 1 Columns No. 56 57 2 Pile No. 11 10 3 Augered 0 (inches) 14 14 4 Pile Length (feet) 25 25 5 Theoretical Pile Volume (cf) 26.7 26.7 6 Number of pump strokes 62 64 7 Volume per Pump Strokes (cf) 0.57 0.57 8 Actual Grout Volume (cf), (6.7) 35.3 36.5 9 Volume Ratio (cf), (815) 1.3 1.4 10 Reinforcing Size 4#5 4#5 11 Reinforcing Length (ft) 25 25 12 Grout Truck Number 8000 8000 Pump calibration date: Pump calibration strokes: 0.57 (cf. per strokes) Remarks: House Piles- 4#5 with #3 ties @ 10"o.c. for 15 ft cage and 1#7 full. Total number of house piles-57. Respectfully Submitted; Darlo A. HerreroAE Field Rep.: T.A. Fla. Reg. #67796 As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the priorwritten approval for B3 Material Testing Engineering, LLC.