Loading...
HomeMy WebLinkAboutBuilding Plans File Copio *4 THESE PLANS AND ALL PROPOSEDVORK CONCEALED FASTENERSOR A�AGh� EN�� ARE SUBJECT TO ANY CORRECTIONS ARE T'HE OF THE REQUIRED BY FIELD INSPECTORS THAT 4 MAY SF.NECESSARY;I ORDER TO P T[ 1 MI OR pF RRGflRG H 10L�R-PLICARI~N CA S.' I ST.LLTC? i E i I FjLF� L �� �� C-E BATE PLANS AND PERMIT MUST BE KEPT ON JOB OR NO Il\SPECTIQN WILL BE MAnE, Demo existing shower only. Rough-in new shower valve install new pan liner using "Pro-slope" per code. Rough-in for slidebar and rainhead Rough-in and install two (2) wet area approved LED lights tied into existing lighting_ Replace one (11 sheet of drywall and install four (4) sheets of DensShield in the shower area. Install new the in shower and floor Install plumbing trim lighting and replace existing exhaust fan File Cr)y y 97� Demo existing shower only. Rough-in new shower valve install new pan liner using"Pro-slope" per code. Rough-in for slidebar and rainhead Rough-in and install two (2) wet area approved LED lights tied into existing lighting_ Replace one (1) sheet of drywall and install four (4) sheets of DensShield in the shower area. Install new tile in shower and floor Install plumbing trim lighting and replace existing exhaust fan i ; i