Loading...
HomeMy WebLinkAboutRevisions , energy calcs, hvac OFFICE USE ONLY: DA`I`E-FILED:.:._,.. •3.1.a31 - :. PER1VId I.#.....,i -OZi I Z . REVISION FEE: -I - RECEIPT PLANNING& DEVELOPMENT SERVICES BUILDING&CODE REGULATION DIVISION 2300 VIRGINIA AVENUE =� 3 FORT PIERCE,FL 34982-5652 (772)462-1553 APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION LOCATION/SITE ADDRESS: 9301 Portside Drive,Ft Pierce,FL 34945 DETAILED DESCRIPTION OF PROJECT REVISIONS: See attached letter CONTRACTOR INFORMATION: STATE of FL REG./CERT.#: CGC 1261228 ST.LUCIE CO CERT. #: BUSINESS NAME: QUALIFIERS NAME: Glenn Allen Davis II ADDRESS: 3725 SE Ocean Blvd,Suite 101 CITY: Stuart STATE: FL ZIP: 34996 PHONE(DAYTIME): 772-692-7800 FAX: 772-692-9155 OWNER/BUILDER INFORMATION: NAME: Renar Homes(Momingside),LLC ADDRESS:3725 SE Ocean Blvd,Syite 101 CITY: Stuart STATE• . P. 34s9s PHONE(DAYTIME. ' 2- s '�0 s` o=:Fy n2-ss2aaoo t AX , , Fj ARCHITECT/ENGINEER INFORMATION: NAME: Michael Anderson ADDRESS: 3725 SE Ocean Blvd,Suite 101 sy CITY: Stuart STATE: FL I -,, • s `' PHONE(DAYTIME): 772-692-7800 FAX; 772-692-9155 fdo j ;)pA SLCCC: 9123109 Revised 06/30/171 i Planning&Development Services REVIEW COMMENTS Building B Code Regulation Division 2300 Virginia Avenue Fort Pierce,FL. 34982 Phone:(772)462.2172 Fax:(772)462.6443 Page 2 REVISIONS INCOMPLETE William Durden 4/3/2018 4/3/2018 Comment: PLEASE SUBMIT REVISED ENERGY CALC'S AND MANUAL J'S FOR THE REVISION.SEE SECTION,107 OF THE 2017 FLORIDA BUILDING CODE. ZONING REVIEW COMPLETE Lydia Galbraith 5/4/2017 6/16/2017 6/16/2017 Comment: i I . I I i FORM R405-2017 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative(Performance) Method Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential Simulated Performance Method shall include: RECEIVE® This checklist APR P; Q 2018 STt �uGte counx�, Psrrn1Cem9 A Form R405 report that documents that the Proposed Design complies with R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report(one page) and an input summary checklist that can be used for field verification (usually four pages/may be greater). 40I Energy Performance Level(EPL)Display Card(one page) p' HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 p A 0 Mandatory Requirements(five pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report(usually one page) p ) ❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed Form R405 Duct Leakage Test Report(usually one page) File COPY S 411 7/201 8 2:48:36 PM EnergyGauge@-USRCZB v6.0 Page 1 of 1 i FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: RENAR HOMES WILSHIRE 1800 Builder Name: RENAR HOMES Street: 9301 PORTSIDE DRIVE Permit Office: FT PIERCE City,State,Zip: FT PIERCE,FL, Permit Number: i Owner: SPEC HOME Jurisdiction: 661100 Design Location: FL,Fort Pierce County:: St.Lucie(Florida Climate Zone 2) 1. New construction or existing New(From Plans) 9. Wall Types(2067.3 sqft.) Insulation Area 2. Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=4.1 1907.30 ftz b.Frame-Wood,Adjacent R=11.0 160.00 ft 3. Number of units,if multiple family 1 c.N/A R= ft2 4. Number of Bedrooms 4 d. N/A R= ft2 10.Ceiling Types (976.0 sqft.) Insulation Area 5. Is this a worst case? Yes a.Under Attic(Vented) R=30.0 976.00 ft2 6. Conditioned floor area above grade(ft2) 1800 b.N/A R= ft2 c.N/A R= ft2 Conditioned floor area below grade(ft2) 0 11.Ducts R ft2 7. Windows(257.8 sqft.) Description Area a.Sup:Attic,Ret:Attic,AH:Garage 6 131 a. U-Factor: Sgl,U=0.54 217.83 ft2 SHGC: SHGC=0.25 b. U-Factor: Sgl,U=0.61 40.00 ft2 12.Cooling systems kBtu/hr Efficiency SHGC: SHGC=0.23 a.Central Unit 40.0 SEER:14.00 c. U-Factor: N/A ft2 SHGC: 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Heat Pump 38.5 HSPF:8.20 SHGC: Area Weighted Average Overhang Depth: 2.293 ft. Area Weighted Average SHGC: 0.247 14.Hot water systems 8. Floor Types (1204.0 sqft.) Insulation Area a.Electric Cap:46 gallons EF:0.920 a.Slab-On-Grade Edge Insulation R=0.0 824.00 ft2 b. Conservation features b.Floor over Garage R=19.0 380.00 ft2 None c.N/A R= ft2 15.Credits Pstat Glass/Floor Area: 0.143 Total Proposed Modified Loads: 63.43 PASS Total Baseline Loads: 67.39 - i I hereby certify that the plans and specifications covered by Review of the plans and � ' EIST,gI� this calculation are in compliance with the Florida Energy specifications covered by this _ , p Code. calculation indicates compliance with the Florida Energy Code. ti uerr•'P'( =�;t O PREPARED BY: Before construction is completed c� ? _ „tits. _._...-.... 01 DATE: this building will be inspected for I,, compliance with Section 553.908 I hereby certify that this building,as des' , is in ompliance Florida Statutes. yt with the Florida Energ Co '. �►'pD � OWNER/Af NT: BUILDING OFFICIAL: DATE. ��'11 DATE: i - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as: certified factory-sealed in accordance with R403.3.2.1. -Compliance requires an Air Barrier and Insulation Inspection Checklist in i 1 p j ct requires an envelope leakage test report with envelope leakage no greater than 7.00 AC 0' 02. FS 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 Section R405.4. Compliant Software Page 1 of 5 i i i FORM R405-2017 PROJECT Title: RENAR HOMES WILSHIRE 1 Bedrooms: 4 Address Type: Street Address Building Type: User Conditioned Area: 1800 Lot# i Owner Name: SPEC HOME Total Stories: 2 Block/Subdivision: #of Units: 1 Worst Case: Yes PlatBook: Builder Name: RENAR HOMES Rotate Angle: 270 Street: 9301 PORTSIIDE DRIV Permit Office: FT PIERCE Cross Ventilation: County: St.Lucie I Jurisdiction: 661100 Whole House Fan: City,State,Zip: FT PIERCE„ Family Type: Single-family FL, New/Existing: New(From Plans) Comment: CLIMATE Design Temp Int Design Temp Heating Design! Daily Temp Design Location TMY Site 97.5% 2.5% Winter Summer Degree Days Moisture Range FL,Fort Pierce FL_VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Block1 1800 16200 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 Main 1800 16200 Yes 8 4 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatio Main 120 ft 0 824 ft2 -- 0 0 1 I 2 Floor over Garage Main - Y- 380 ft2 19 0 0 1 ROOF Roof Gable Roof Solar SA Emitt Emitt Deck Pitch # Type Materials Area Area Color Absor. Tested Tested Insul. (deg) 1 Hip Flat tile/slate 1057 ft2 0 ft2 Medium 0.96 No 0.9 No 0 22.6 ATTIC V # Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 150 976 ft2 N N I • CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac TrussiType 1 Under Attic(Vented) Main 30 Blown 976 ft2 0.11 Wood I I i 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 Section R405.4.1 Compliant Software 'Page 2 of 5 I FORM R406-2017 WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below 0 _ 1 N=>W Exterior Concrete Block-Int Insul Main 4.1 34 8 8 294.7 ft2 0 0.3 0 _ 2 E=>N Exterior Concrete Block-Int Insul Main 4.1 16 8 8 138.7 ft2 0 �0.3 0 _ 3 S=>E Exterior Concrete Block-Int Insul Main 4.1 14 8 8 .121.3 ft2 0 0.3 0 _4 W=>S Exterior Concrete Block-Int Insul Main 4.1 25 0 8 8 216.7 ft2 0 0.3 0 5 N=>W Garage Frame-Wood Main 11 20 0 8 160.0 ft2 0 0.3 0 6 N=>W Exterior Concrete Block-Int Insul Main 4.1 34 8 0 272.0 ft2 0 0.3 0 - 7 E=>N Exterior Concrete Block-Int Insul Main 4.1 37 8 0 296.0 ft2 0 0.3 0 8 S=>E Exterior Concrete Block-Int Insul Main 4.1 34 8 0 272.0 ft2 0 0.3 0 9 W=>S Exterior Concrete Block-Int Insul Main 4.1 37 8 0 296.0 ft2 0 0.3 0 DOORS # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In, 1 S=>E Insulated Main None .46 3 6 8 20 ft2 2 N=>W Wood Main None .46 2 8 6 8 , 17.8 ft2 WINDOWS Orientation shown is the entered orientation => changed to Worst Case. Wall Overhang v # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 N=>W 1 Metal Single(Tinted) Yes 0.61 0.23 N 40.0 ft2 1 ft 4 in 1 ft 0 in None None 2 N=>W 1 Metal Single(Tinted) Yes 0.54 0.25 N 22.5 ft2 1 ft 4 in 12 ft 0 in None None 3 N=>W 1 Metal Single(Tinted) Yes 0.54 0.25 N 9.0 ft2 1 ft 4 in 12 ft 0 in None None 4 S=>E 3 Metal Single(Tinted) Yes 0.54 0.25 N 31.5 ft2 1 ft 4 in 12 ft 0 in None None 5 W=>S 4 Metal Single(Tinted) Yes 0.54 0.25 N 15.0 ft2 1 ft 4 in 12 ft 0 in None None 6 N=>W 6 Metal Single(Tinted) Yes 0.54 0.25 N 30.0 ft2 1 ft 4 in 0 ft 6 in None None 7 N=>W 6 Metal Single(Tinted) Yes 0.54 0.25 N 6.0 ft2 1 ft 4 in 0 ft 6 in None None 8 E=>N 7 Metal Single(Tinted) Yes 0.54 0.25 N 15.0 ft2 1 ft 4 in 0 ft 6 in None None 9 S=>E 8 Metal Single(Tinted) Yes 0.54 0.25 N 45.0 ft2 1 ft 4 in 0 ft 6 in None None 10 S=>E 8 Metal Single(Tinted) Yes 0.54 0.25 N 3.3 ft2 1 ft 4 in 0 ft 6 in None None 11 E=>N 2 Metal Single(Tinted) Yes 0.54 0.25 N 18.0 ft2 1 ft 4 in 1 ft 0 in None None 12 W=>S 4 Metal Single(Tinted) Yes 0.54 0.25 N 22.5 ft2 12 ft 4 in 1 ft 0 in None None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation i 1 380 ft2 380 ft2 64 ft 8 ft 1 I I 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 Section R405.4.1 Compliant Software Page 3 of 5 i I FORM R405-2017 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 i 1 Wholehouse Proposed ACH(50) .0004 1890 103.76 195.13 .3598 7 HEATING SYSTEM # System Type Subtype Efficiency Capacity Block Ducts 1 Electric Heat Pump/ None HSPF:8.2 38.5 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ None SEER: 14 40 kBtu/hr 1200 cfm 0.75 1 sys#1 HOT WATER SYSTEM # System Type SubTpe Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.92 40 gal 60 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert #, Company Name System Model# Collector Model# Area Volume FEF None None ft2 DUCTS / —Supply-- —Return— Air CFM 25 CFM25 HVAC# V # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 Attic 6 131 ft2 Attic 54 ft2 Default Leakage Garage (Default) (Default) 1 1 TEMPERATURES Programable Thermostat:Y Ceiling Fans: I Cooling Jan Feb Mar [ ]Apr May un Jul AugSe Oct Nov Dec Heating Jan Feb Mar L 1 Apr May roun Jul Aug Sep �C�Occtt �Nov Dec Venting Jan Feb X Mar lxJ 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 Section R405.4.1 Compliant Software Page 4 of 5 i I i FORM R406-2017 Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 .80 80 PM 80 80 78 78 78 78 78 78 78 78 ' 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 .78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MECHANICAL VENTILATION Type Supply CFM Exhaust CFM Fan Watts HRV Heating System Run Time Cooling System None 0 0 0 0 1 -Electric Heat Pump 0% 1 -Central Unit i I II I I i 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 Section R405.4.1 Compliant Software Page 5 of 5 FORM R405-2017 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX' = 94 The lower the EnergyPerformance Index, the more efficient the home. 9301 PORTSIDE DRIVE, FT PIERCE, .FL, 1. New construction or existing New(From Plans) 9. Wall Types Insulation Area 2. Single family or multiple family Single-family a.Concrete Block-Int Insul, Exterior R=4.1 1907.30 ftz b.Frame-Wood,Adjacent R=11.0 160.00 ft 3. Number of units,if multiple family 1 c.NIA R= ftz 4. Number of Bedrooms 4 d.N/A R= ftz 5. Is this a worst case? Yes 10.Ceiling Types Insulation Area a.Under Attic(Vented) R=30.0 976.00 ft= 6. Conditioned floor area(ftz) 1800 b.N/A R= ftz 7. Windows*" Description Area c.N/A R= ftz a. U-Factor: Sgl,U=0.54 217.83 ftz 11.Ducts R ftz a.Sup:Attic,Ret:Attic,AH:Garage 6 131 SHGC: SHGC=0.25 b. U-Factor. Sgl,U=0.61 40.00 ftz SHGC: SHGC=0.23 12.Cooling systems kBtu/hr Efficiency c. U-Factor: N/A ftz a.Central Unit 40.0 SEER:14.00 SHGC: d. U-Factor. N/A ftz 13.Heating systems kBtu/hr Efficiency SHGC: a.Electric Heat Pump 38.5 HSPF:8.20 Area Weighted Average Overhang Depth: 2.293 ft. Area Weighted Average SHGC: 0.247 8. Floor Types Insulation Area 14.Hot water systems a.Slab-On-Grade Edge Insulation R=0.0 824.00 ftz a.Electric Cap:40 gallons EF:0.92 b.Floor over Garage R=19.0 380.00 ftz b. Conservation features c.N/A R= ftz None 15.Credits ' Pstat I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed ywQ~,'��� ` o0, �. based on installed Code compliant features. Builder Signature: Date: o a�ya a Address of New Home: City/FL Zip: *Note: This is not a Building Energy-Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida EnergyGauge Rating. Email EnergyGauge tech support at techsupport@energygauge.com or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 -Section R405.4.1 Compliant Software Page 1 of 1 I I Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods ADD RESS: 9301 PORTSIE D DRIVE Permit Number: FT PIERCE, FL, MANDATORY REQUIREMENTS See individual code sections for full details. SECTION R401 GENERAL R401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law (Section 553.9085,Florida Statutes)requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building.A copy of the EPL display card can be found in Appendix RD. R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with Section C402.5. R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.The sealing methods between dissimilar materials shall allow for differential expansion and contraction. R402.4.1.1 Installation.The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table R402.4.1.1,as applicable to the method of construction.Where required by the code official,an approved third party shall inspect all components and verify compliance. R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air, changes per hour in Climate Zones 1 and 2,and three air changes per hour in Climate Zones 3 through 8.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals).Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7), Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(0,(g)or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions,alterations, renovations,or repairs,of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test,shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems,if installed at the time of the test,shall be turned off. 6. Supply and return registers,if installed at the time of the test,shall be fully open. R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers or doors,and outdoor combustion air.Where using tight-fitting doors on factory-built fireplaces listed and labeled in accordance with UL 127,the doors shall be tested and listed for the fireplace.Where using tight-fitting doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907. R402.4.3 Fenestration air Ieakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400'or AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Site-built windows,skylights and doors. 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 -FBC 6th Edition(2017) Complia Page 1 of 5 i MANDATORY REQUIREMENTS - (Continued) R402.4.4 Rooms containing fuel-burning appliances. In Climate Zones 3 through 8,where open combustion air ducts provide combustion air to open combustion fuel burning appliances,the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room,isolated from inside the thermal envelope.Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2,where the walls,floors and ceilings shall meet not less than the basement wall R-value requirement.The door into the'room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403.The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code,Residential, R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not ' more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E283 at a 1.57 psf(75 Pa)pressure differential.All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS R403.1 Controls. R403.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. R403.1.3 Heat pump supplementary heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have controls that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load. R403.3.2 Sealing(Mandatory) All ducts,air handlers,filter boxes and building cavities that form the primary air containment passageways for air.distribution systems shall be considered ducts or plenum chambers,shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5)or (7),Florida Statutes,or individuals licensed as set forth in Section 489.105(3)(f),(g)or(i),Florida Statutes,to be"substantially leak free"in accordance with Section R403.3.3. R403.3.2.1 Sealed air handier. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design airflow rate when tested in accordance with ASHRAE 193. R403.3.3 Duct testing(Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods: 1. Rough-in test:Total leakage shall be measured with a pressure differential of 0.1 inch w.g.(25 Pa)across the system,including the manufacturer's air handler enclosure if installed at the time of the test.All registers shall be taped or otherwise sealed during the test. 2. Postconstruction test:Total leakage shall be measured with a pressure differential of 0.1 inch w.g.(25 Pa)across the entire system,including the manufacturer's air handler enclosure.Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. R403.3.5 Building cavities(Mandatory). Building framing cavities shall not be used as ducts or plenums. R403.4 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying fluids above 105"F(41°C) or below 55"F(1 WC)shall be insulated to a minimum of R-3. R403.4.1 Protection of'piping insulation. Piping insulation exposed to weather shall be protected from damage,including that caused by sunlight,moisture,equipment maintenance and wind,and shall provide shielding from solar radiation that can cause degradation of the material.Adhesive tape shall not be permitted. R403.5.1 Heated water circulation and temperature maintenance systems(Mandatory). Heated water circulation systems shall be in accordance with Section R403.5.1.1.Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls,temperature sensors and pumps shall be accessible.Manual controls shall be readily accessible. 1 R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump.The system return pipe shall be a dedicated return pipe or a cold water supply pipe.Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy.The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. 11403.5.1.2-Heat trace systems. Electric heat trace systems shall comply v&h'IEEE 515.1 or UL 515.Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times;when heated water is used in the occupancy. t 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 -FBC 6th Edition(2017)Complian Page 2 of 5 � I I MANDATORY REQUIREMENTS - (Continued) R403.5.5 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets.Extemal heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3'/z inches(89 mm)in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies(Mandatory). R403.5.6.1.1 Automatic controls. Service water-heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature setting range shall be from 100°F to 140°F(38°C to 60°C). R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off.A separate valve shall be provided to permit the energy supplied to the main burner(s)of combustion types of service water-heating systems to be turned off. R403.5.6.2 Water-heating equipment. Water-heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water-heating category.Solar water heaters shall meet the criteria of Section R403.5.6.2.1. R403.5.6.2.1 Solar water-heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol.Collectors in installed solar water-heating systems should meet the following criteria: 1. Be installed with atilt angle between 10 degrees and 40 degrees of the horizontal;and 2. Be installed at an orientation within 45 degrees of true south. R403.6 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code,Residential,or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation including:Natural, Infiltration or Mechanical means.Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. R403.6.1 Whole-house mechanical ventilation system fan efficacy. When installed to function as a whole-house mechanical ventilation system,fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where whole-house mechanical ventilation fans are integral to tested and listed HVAC equipment,they shall be powered by an electronically commutated motor. R403.6.2 Ventilation air. When installed to function as a whole-house mechanical ventilation system,fans shall meet the efficacy requirements of Table R403.6.1. 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2,Ventilation for Acceptable Indoor Air Quality,shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces,attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3• If ventilation air is drawn from enclosed space(s),then the walls of the space(s)from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19,space permitting,or R-10 otherwise. R403.7 Heating and cooling equipment(Mandatory). R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building.The manufacturer and model number of the outdoor and indoor units(if split system)shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1.This Code does not allow designer safety factors,provisions for future expansion or other factors that affect equipment sizing.System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems.New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1 WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM MINIMUM EFFICACY a AIRFLOW RATE MAXIMUIV (CFM) (CFM/WATT) (CFM) Range hoods Any 2.8 cfm/watt Any In-line fan Any 2.8 cfm/watt Any I Bathroom,utility room 10 1.4 cfm/watt <90 Bathroom,utility room 90 2.8 cfm/watt Any For SI: 1 cfm=28.3 L/min. a. When tested in accordance with HVI Standard 916 i 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 -FBC 6th Edition(2017) Complia Page 3 of 5 MANDATORY REQUIREMENTS - (Continued) R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.7,or the closest available size provided by the manufacturer's product lines.The corresponding latent capacity of the j equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal,rating-test value and shall not be used for equipment sizing.Manufacturer's expanded performance data shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry-bulb temperature for the load calculation(or entering water temperature for water-source equipment),the blower CFM provided by the expanded performance data,the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s)is installed in an unconditioned space. Exceptions: 1. Attached single-and multiple-family residential equipment sizing may be selected so that its cooling capacity is lessthan the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer,in attached single-and multiple-family units,the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1.1,and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. j R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.7.1. I R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.7.1. R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capl city on an intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. R403.8 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403. I R403.9 Snow melt and ice system controls(Mandatory) Snow-and ice-melting systems,supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F(10°C),and no precipitation is falling and'an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F(4.8°C). R403.10 Pools and permanent spa energy consumption(Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. R403.10A Heaters. The electric power to heaters shall be controlled by a readily accessible on-off switch that is an integral part of the heater mounted on the exterior of the heater,or external to and within 3 feet(914 mm)of the heater.Operation of such switch shall not change the setting of the heater thermostat.Such switches shall be in addition to a circuit breaker for the power to the heater.Gas-fired heaters shall not be equipped with continuously burning ignition pilots. R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors.Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar-and waste-heat-recovery pool heating systems. 3. Where pumps are powered exclusively from on-site renewable generation. R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor-retardant cover on or at the water surface or a1iquid cover or other means proven to reduce heat loss. Exception: ' Where more than 70 percent of the energy for heating;computed over an operation season,is from site-recovered energy,such as from a heat pump or solar energy source,covers or other vapor-retardant means shall not be required. R403.10.4 Gas-and oil-fired pool and spa heaters. All gas-and oil-fired pool and spa heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013,when tested in accordance with ANSI Z 21.56.Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. I 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 -FBC 6th Edition(2017) Complia Page 4 of 5 i I i R403.10.5 Heat m I e pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard. R403.11 Portable spas(MandatoryQhe energy consumption of electric-powered portable spas shall be controlled by the requirements ofAPSP-14. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment(Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain,only high-efficacy lamps. Exception:Low-voltage lighting. R404.1.1 Lighting equipment(Mandatory).Fuel gas lighting systems shall not have continuously burning pilot lights. i I 4/17/2018 2:48 PM I EnergyGauge®USA-FlaRes2017 -FBC 6th Edition(2017) Complia Page 5 of 5 2017 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: RENAR HOMES WILSHIRE 1800 Builder Name: RENAR HOMES Street: 9301 PORTSIDE DRIVE Permit Office: FT PIERCE City,State,Zip: FT PIERCE, FL, Permit Number: Owner. SPEC HOME Jurisdiction: 661100 Design Location: FL,Fort Pierce COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. Ceiling/attic y pp g The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in an dropped ceiling/soffit' /soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings,drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the'cavity with sealed. a material having a thermal resistance of R-3 per inch Knee walls shall be sealed. minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows,skylights The space between window/doorjambs and framing,and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. -71 Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above-garage subfloor decking,or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side. floors) of sheathing,or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls Shafts,penetrations Duct shafts, utility penetrations,and flue shafts opening to exterior or unconditioned space shall be sealed. ! Batts in narrow cavities shall be cut to fit,or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spa s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in,the building shall be sealed to the drywall. thermal envelope shall be airtight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls,or insulation that on installation readily conforms to available space shall mftAnd behind p*ping and wiring Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air-sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed!to the sub-floor or drywall. Concealed When required to be sealed,concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids a. In addition,inspection of log walls shall be in accoryer dance with the provisions of ICC-400. 4/17/2018 2:48 PM EnergyGaugee USA-FlaRes2017 FBC 6th Edition(2017)Compliant Software Page 1 of 1 I FORM R405-2017 Envelope Leakage Test Report Performance I FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Envelope Leakage Test Report Performance Method Project Name: RENAR HOMES WILSHIRE 1800 Builder Name: RENAR HOMES Street: 9301 PORTSIDE DRIVE Permit Office: FT PIERCE City,State,Zip: FT PIERCE, FL, Permit Number: Design Location: FL,Fort Pierce Jurisdiction: 661100 Cond.Floor Area:: 1800 sq.ft. Cond.Volume: 16200 cu ft. Envelope Leakage Test Results Leakage Characteristics Regression Data: C: n: R: Single or Multi Point Test Data Required ACH(50)from HOUSE PRESSURE FLOW: FORM R405-2017 : 1 Pa cfm 2 Pa cfm Tested ACH(50) " 3 Pa cfm 4 Pa cfm "Tested leakage must be less than or equal to the required ACH(50)shown on Form R405-2017 for 5 Pa cfm this building. If the tested ACH(50)is less than 3 the building must have a mechanical ventilation 6 Pa cfm system. R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2...Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7),Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f),(g),or(1)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures; 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures; 3.Interior doors,if installed at the time of the test,shall be open; 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5.Heating and cooling systems,if installed at the time of the test,shall be'tumed off;and 6.Supply and return registers,if installed at the time of the test,shall be fully open. I I hereby certify that the above envelope leakage Testing shall be conducted by either D�'iHES?"i performance results demonstrate compliance individuals as defined in Section ti, s O with Florida Energy Code requirements in 553.993(5)or(7), Florida Statutes or her,,, ,t+ individuals licensed as set forth in �t�t�r...•..'% •ti,; `,,,,�`�;� r0 accordance with Section R402.4.1.2. Section 489.105 3 approved third party.A written report of ....._...irs r.... the results of the test shall be signed SIGNATURE: by the third party conducting the test PRINTED NAME: and provided to the code official. COD 1yy1r '�y DATE: BUILDING OFFICIAL: DATE: i . 4/17/2018 2:48 PM EnergyGauge®USA-FlaRes2017 -Section R405.4.1 Compliant Software Page 1 of 1 i i i i j I i Spec Home 9301 Portside Drive HVAC Load Calculations for Renar Homes II INnVAC I-€VAC L c)ADs i Prepared By: Robert Weidman Preferred Air Conditioning&Mechanical 1643 Donna Road Wes alm B ch 1. 1 _ '1 7 O Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations areperformed er ACCA Manual J 8th Edition,pVersion 2, an n I ,I IRhvac�-ReM4 ntia: l&UghtCommercial HVAC Loads Elite Software Development Inc Preferred Air Conditionatq&Meth Spec Home 9301.Portside Dnve, u West P616'9ea6h,.FL 33409 =� Pae2 Project Report General Project Irif fmatio-h . . 777777 .. Project Title: Spec Home 9301 Portside Drive Project Date: Tuesday, April 17, 2018 Client Name: Renar Homes Company Name: Preferred Air Conditioning & Mechanical Company Representative: Robert Weidman Company Address: 1643 Donna Road Company City: West Palm Beach, FI. Company Phone: (561) 689-1093 Company Fax: Company Website: GETCOLD.NET Company Comment: Des"g n'D`afa Reference City. Fort Pierce, Florida Building Orientation: Front door faces North Daily Temperature Range: Medium Latitude: 27 Degrees Elevation: 25 ft. Altitude Factor: 0.999 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: 42 39.4 n/a n/a 72 n/a Summer: 90 78 59% 50% 75 61 C-,jbj(f tie Total Building Supply CFM: 1,181 CFM Per Square ft.: 0.67 3 Square ft. of Room Area: 1,755 Square ft. Per Ton: 531 Volume (ft'): 14,040 Buildin Loads Total Heating Required Including Ventilation Air. 38,631 Btuh 38.631 MBH Total Sensible Gain: 28,441 Btuh 72 % Total Latent Gain: 11,218 Btuh 28 % Total Cooling Required Including Ventilation Air: 39,659 Btuh 3.30 Tons (Based On Sensible + Latent) x Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday, April 17, 2018, 4:10 PM I i Rhvac Resi ent�al&Light Gommerdial HYAC Loatls Elite Soft*re Deyela meet,Inc age,g5 Preferred Air Condd�antng&RAech Spec Home 9301 Potstde[3rlve West Csa(iti`Beach, L'`33409' Load Preview Report Min Min Sys Sys Sys Has Net ft.Z Send Lat Net Sen Duct Htg Clg Htg Clg Act Scope AED To /Ton Area Gainj Gain Gain Loss CFM CFM CFM CFM CFM Size Building 3.30 531 1,755 28,441, 11,218 39,659 38,631 438 1,181! 438 1,181 1,181 System 1 Main Floor No 3.30 531 1,755 28,441 11,218 39,65P 38,631 438. 1,181 438 r1 181 1,181 12x17 Ventilation 2,473 6,226 8,698: 4,946 Supply Duct Latent 2,935 2,935 Zone 1 1,755 25,968 2,058 28,026 33.686 438 1,181 438, 1 181' 1,181 12x17 1-Family 224 3,872 230 4,102 6,,287 82 176 82 ', 176 176 1-8 2-Kitchen 234 5,089 448 5,537 9,847 128, 232, 128;,. 232; 232: 1-9 3-Powder Room 50 208: 0 208 588 8 91 8; 9' 9 1-2 4-Living 195 5,580 230 5,810 8,487 110 254 110; 254:i 254 1-9 5-Bedroom 3 132 2,186 230 2,416 1,302 17 99 17° ' 99°, 99 1-6 6-Bath 2 90 363 0 363' 494 6' 17 6 ,, 7 17 1-3 7-Loft/Br4 140 2,364 230- 2,594 1,349 18 108 18: 108': 108 1-6 8-Stairwell 154 1,012 0 1,012 807 10 46 10 46 46 1-4 9-Master Wic 77 266 0 266 358 5 12 5, 12 12 1-2 10-Master Bath 99 307 0 307 313 4 14 4;= 14 14 1-2 11-Master Bedroom 228 3,464 460 3,924 2,551 33 158, 33=, 158 158 2-5 12-Bedroom 2 132 1,258 230 1,488 1,302 17 57 17, 57 57 1-4 i I I i C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday,April 17, 2018, 4:10 PM � j Rhvgq Residential$Light Commercial HVAC Loads " Elite Software_Developmenf, ram Beach,�FL 3 409 ech Home 93 =r _.....;._ _W Spec - - efe 01_Portside Dnv estrP e Fa e 4 Total Building Summary Loads m` onenf Co p h Area Sen Lat Sen Total Desrr tion, Quan .- Loss" Gain Cain':' ain Gain RENAR SGD: Glazing-SGD .61 /.23, u-value 0.61, 39.6 725 0 554 554 SHGC 0.23 RENAR SGH: Glazing-RENAR SINGLE HUNG, u-value 96 1,555 0 1,797 1,797 0.54, SHGC 0.25 RENAR SINGLE: Glazing-SHG .54/.25, u-value 0.54, 74 1,200 0 1,537 1,537 SHGC 0.25 11 F: Door-Wood -Solid Core With Metal Storm 42 352 0 306 306 11 D: Door-Wood-Solid Core 21 246 0 213 213 11 J: Door-Metal - Fiberglass Core 19.8 356 0 309 309 R-4.2: Wall-Custom, STUCCO BLOCK R4.2 DRYWALL 461.8 8,093 0 4,694 4,694 12B-Obw: Wall-Frame, R-11 insulation in 2 x 4 stud 1053.8 3,065 0 1,298 1,298 cavity, no board insulation, brick finish, wood studs 12C-Obw: Wall-Frame, R-13 insulation in 2 x 4 stud 115 314 0 126 126 cavity, no board insulation, brick finish, wood studs 1213-0sw: Wall-Frame, R-11 insulation in 2 x 4 stud 97 282 0 227 227 cavity, no board insulation, siding finish, wood studs 16BR-19-ml: Roof/Ceiling-Under Attic with Insulation on 224 329 0 549 549 Attic Floor(also use for Knee Walls and Partition Ceilings), unvented attic with radiant barrier, R-19 insulation, light metal 1613-30: Roof/Ceiling-Under Attic with Insulation on Attic 1042 1,000 0 1,667 1,667 Floor(also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-30 insulation 17A-12: Roof/Ceiling-Roof Deck(roofing, wood, 40 76 0 106 106 insulation) or SIP Panels Supported on Beams, Dark or Bold-Color Asphalt Shingle, Dark Metal, Dark Membrane, Dark Tar and Gravel, 1.5"wood plus R- 12 insulation 22A-ph: Floor-Slab on grade, No edge insulation, no 115 4,685 0 0 0 insulation below floor, any floor cover, passive, heavy moist soil Subtotals for structure: 22,278 0 13,383 13,383 People: 7 1,610 2,100 3,710 Equipment: 448 3,564 4,012 Lighting: 18 61 61 Ductwork: 11,408 2,935 6,663 9,598 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 150, Summer CFM: 150 4,946 6,226 2,473 8,698 AED Excursion: 0 0 197 197 - ----- - ---...__..........._......_..-- ......................_............--- Total Building Load Totals: 38,631 11,218 28,441 39,659 Check Fi ufes M Total Building Supply CFM: 1,181 CFM Per Square ft.: 0.673 Square ft. of Room Area: 1,755 Square ft. Per Ton: 531 Volume (f?): 14,040 Bu Ming Loads Total Heating Required Including Ventilation Air: 38,631 Btuh 38.631 MBH Total Sensible Gain: 28,441 Btuh 72 % Total Latent Gain: 11,218 Btuh 28 % Total Cooling Required Including Ventilation Air: 39,659 Btuh 3.30 Tons (Based On Sensible+ Latent) 1.Nofesa.: Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday, April 17, 2018, 4:10 PM i Rhvac-Residential-&LighteCommercial HVAC Loatls' µ Elite Software Develo ment,inc,.' P Preferred Air Conditioq►�ng&Mech X Spec Home 9301 Portside Dnve_ West Palm Beach FL°�3409' _.S a e5 Total Building Summary Loads (cont'd 11 Notes, N Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. I i I C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday,April 17, 2018, 4:10 PM � I Rhvac Residential,&'tight Commercial HVAC Loads Elite Software:Development,Inc. Preferred Air Conditioning&Mech Spec Home 9301 Portside.Drive,, est .V11zPaltn Beach Ft `33409� Pa e_6- S stem 1 Main Floor Summary Loads Gomponent. Area Sen Lat_ Sen Total Descri taon ; QUan doss Gain , s` _ aln my RENAR SGD: Glazing-SGD .61 /.23, u-value 0.61, 39.6 725 0 554 554 SHGC 0.23 RENAR SIGH: Glazing-RENAR SINGLE HUNG, u-value 96 1,555 0 1,797 1,797 0.54, SHGC 0.25 RENAR SINGLE: Glazing-SHG .54/ .25, u-value 0.54, 74 1,200 0 1,537 1,537 SHGC 0.25 11 F: Door-Wood -Solid Core With Metal Storm 42 352 0 306 306 11 D: Door-Wood-Solid Core 21 246 0 213 213 11 J: Door-Metal - Fiberglass Core 19.8 356 0 309 309 R-4.2: Wall-Custom, STUCCO BLOCK R4.2 DRYWALL 461.8 8,093 0 4,694 4,694 12B-Obw: Wall-Frame, R-11 insulation in 2 x 4 stud 1053.8 3,065 0 1,298 1,298 cavity, no board insulation, brick finish, wood studs 12C-Obw: Wall-Frame, R-13 insulation in 2 x 4 stud 115 314 0 126 126 cavity, no board insulation, brick finish, wood studs 12B-Osw: Wall-Frame, R-11 insulation in 2 x 4 stud 97 282 0 227 227 cavity, no board insulation, siding finish, wood studs 16BR-19-ml: Roof/Ceiling-Under Attic with Insulation on 224 329 0 549 549 Attic Floor(also use for Knee Walls and Partition Ceilings), unvented attic with radiant barrier, R-19 insulation, light metal 16B-30: Roof/Ceiling-Under Attic with Insulation on Attic 1042 1,000 0 1,667 1,667 Floor(also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-30 insulation 17A-12: Roof/Ceiling-Roof Deck(roofing, wood, 40 76 0 106 106 insulation) or SIP Panels Supported on Beams, Dark or Bold-Color Asphalt Shingle, Dark Metal, Dark Membrane, Dark Tar and Gravel, 1.5"wood plus R- 12 insulation 22A-ph: Floor-Slab on grade, No edge insulation, no 115 4,685 0 0 0 insulation below floor, any floor cover, passive, heavy _ moist soil Subtotals for structure: 22,278 0 13,383 13,383 People: 7 1,610 2,100 3,710 Equipment: 448 3,564 4,012 Lighting: 18 61 61 Ductwork: 11,408 2,935 6,663 9,598 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 150, Summer CFM: 150 4,946 6,226 2,473 8,698 AED Excursion: 0 0 197 197 System 1 Main Floor Load Totals: 38,631 11,218 28,441 39,659 Cheeck,Fi ures Supply CFM: 1,181 CFM Per Square ft.: 0.673 Square ft. of Room Area: 1,755 Square ft. Per Ton: 531 Volume (ft'): 14,040 S stern LoadsWt _ Total Heating Required Including Ventilation Air: 38,631 Btuh 38.631 MBH Total Sensible Gain: 28,441 Btuh 72 % Total Latent Gain: 11,218 Btuh 28 % Total Cooling Required Including Ventilation Air: 39,659 Btuh 3.30 Tons (Based On Sensible+ Latent) Notes .. T Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday, April 17, 2018, 4:10 PM I I g C Loads „" Elite Software Development,Inc Prefe ed As'Condao&�n' &Mech merc�ai HVA Spec Home 9301'Portside Drive, . . WesfPafmBeach,FL�33409� _ =Pa e.7 S stem 1 Main Floor Summary Loads (cont'd) Notes - 7777771 Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday, April 17, 2018, 4:10 PM Rhvac Residential&Light Commercial HVAC Loads Elite Software Development,Inc Preferred Air Conditioning&Mech Spec Home 9301 Portside Dnve_ r r _. V11est"Pa{riiBeachFL-"33409 ., = ,_ Pa'e 8 E ui ment Data - System 1 - Main Floor Cooling System Type: Air Source Heat Pump Outdoor Model: CH14NB042*0**A* Indoor Model: FB4CNP048L Tradename: CARRIER AIR CONDITIONING Outdoor Manufacturer: CARRIER AIR CONDITIONING Description: Air Source Heat Pump AHRI Reference No.: 9162731 Capacity: 40000 Efficiency: 14 SEER Heating System Type: Air Source Heat Pump Model: CH14NB042*0**A* Tradename: CARRIER AIR CONDITIONING Manufacturer: CARRIER AIR CONDITIONING Description: Air Source Heat Pump Capacity: 41000 Efficiency: 8.2 HSPF I I C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday, April 17, 2018, 4:10 PM Rtiv c Residential Lrght Commercial,HVA_ Elite Software Deve. ..... Inc. Preferred Air Conditioning&Mach w: Spec Home 9301 Portside„Drive - _. , .. _ West f?ilm Beach_,FL<33409 F a e 8 System 1, Zone 9 Summary Loads (Average Load Procedure for Rooms) Component Area Sen Lat Sen .Total' Descri tion Quan. .,.a, :_Loss Gain Gain'` Gain RENAR SGD: Glazing-SGD .61 / .23, u-value 0.61, 39.6 725 0 554 554 SHGC 0.23 RENAR SGH: Glazing-RENAR SINGLE HUNG, u-value 96 1,555 0 1,797 1,797 0.54, SHGC 0.25 RENAR SINGLE: Glazing-SHG .54/ .25, u-value 0.54, 74 1,200 0 1,537 1,537 SHGC 0.25 11 F: Door-Wood-Solid Core With Metal Storm 42 352 0 306 306 11 D: Door-Wood -Solid Core 21 246 0 213 213 11 J: Door-Metal - Fiberglass Core 19.8 356 0 309 309 R-4.2: Wall-Custom, STUCCO BLOCK R4.2 DRYWALL 461.8 8,093 0 4,694 4,694 12B-Obw: Wall-Frame, R-11 insulation in 2 x 4 stud 1053.8 3,065 0 1,298 1,298 cavity, no board insulation, brick finish, wood studs 12C-Obw: Wall-Frame, R-13 insulation in 2 x 4 stud 115 314 0 126 126 cavity, no board insulation, brick finish, wood studs 1213-0sw: Wall-Frame, R-11 insulation in 2 x 4 stud 97 282 0 227 227 cavity, no board insulation, siding finish, wood studs 16BR-19-ml: Roof/Ceiling-Under Attic with Insulation on 224 329 0 549 549 Attic Floor(also use for Knee Walls and Partition Ceilings), unvented attic with radiant barrier, R-19 insulation, light metal 1613-30: Roof/Ceiling-Under Attic with Insulation on Attic 1042 1,000 0 1,667 1,667 Floor(also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-30 insulation 17A-12: Roof/Ceiling-Roof Deck(roofing, wood, 40 76 0 106 106 insulation) or SIP Panels Supported on Beams, Dark or Bold-Color Asphalt Shingle, Dark Metal, Dark Membrane, Dark Tar and Gravel, 1.5"wood plus R- 12 insulation 22A-ph: Floor-Slab on grade, No edge insulation, no 115 4,685 0 0 0 insulation below floor, any floor cover, passive, heavy moist soil Subtotals for structure: 22,278 0 13,383 13,383 People: 7 1,610 2,100 3,710 Equipment: 448 3,564 4,012 Lighting: 18 61 61 Ductwork: 11,408 0 6,663 6,663 Infiltration: Winter CFM: 0, Summer CFM: 0 0 _ 0 _ 0_ 0_ System 1, Zone 1 Load Totals: 33,686 2,058 25,968 28,026 Check.Figures ures h Supply CFM: 1,181 CFM Per Square ft.: 0.673 Square ft. of Room Area: 1,755 Square ft. Per Ton: 751 Volume (ft'): 14,040 :Zonq,Loads, .. Total Heating Required: 33,686 Btuh 33.686 MBH Total Sensible Gain: 25,968 Btuh 93 % Total Latent Gain: 2,058 Btuh 7 % Total Cooling Required: 28,026 Btuh 2.34 Tons (Based On Sensible+ Latent) Notes Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\RENAR WILSHIRE 1800 MCMILLAN.rh9 Tuesday, April 17, 20181, 4:10 PM Rhvac�entiall&Light Commercial HUAC Loatls 3 Elite Software Development,Inc u Preferred Air Gondittonr 9,&Mech Spec Horne 9301 E Portside Drive WesfiPaim Beach;Ff 33409'', m'' .< . Pa- a 10' System 1 Room Load Summa Htg= Mtn Rai Run CI` r CI lion Act Rootn AreaE Sens' Htg Duct Duct Sens Lat Clg Sys; No , lame SFCFM Size . i Vel „Btuh„,a 'Btuh F. CFM ,.,..<..,'CF.M, ---Zone 1--- 1 Family 224 6,287 82 1-8 505 3,872 230 176 176 2 Kitchen 234 9,847 128 1-9 524 5,089 448 232 232 3 Powder Room 50 588 8 1-2 435 208 0 9 9 4 Living 195 8,487 110 1-9 575 5,580 230 254 254 5 Bedroom 3 132 1,302 17 1-6 507 2,186 230 99 99 6 Bath 2 90 494 6 1-3 336 363 0 17 17 7 Loft/Br4 140 1,349 18 1-6 548 2,364. 230 108 108 8 Stairwell 154 807 10 1-4 527 1,012 0 46 46 9 Master Wic 77 358 5 1-2 554 266 0 12 12 10 Master Bath 99 313 4 1-2 640 307 0 14 14 11 Master Bedroom 228 2,551 33 2-5 578 3,464 460 158 158 12 Bedroom 2 132 1,302 17 1-4 656 1,258 230 57 57 Ventilation 4,946 2,473 6,226 Duct Latent 2,935 .----..._.........System 1 total 1,755 38,631 438 ---------.._...............--- 28,441 -- 11,218........_.__._._1,181...._.................._.1 181...... System 1 Main Trunk Size: 12x17 in. Velocity: 834 ft./min Loss per 100 ft.: 0.100 in.wg Cooln °,S"stem'_S�'ft nia " _. .. .... ... .x_ _ , ... Caoyng? Setistbte/Laatent Sensible Latent, Total:' -Nona Sit,..� �tuh_ Bfu , Btufi.z Net Required: 3.30 72%/28% 28,441 11,218 39,659 Actual: 3.33 75%/25% 30,000 10,000 40,000 Heating System Cooling System Type: Air Source Heat Pump Air Source Heat Pump Model: CH14NB042*0**A* CH14NB042*0**A* Indoor Model: FB4CNP048L Brand: CARRIER AIR CONDITIONING CARRIER AIR CONDITIONING Description: Air Source Heat Pump Air Source Heat Pump Efficiency: 8.2 HSPF 14 SEER Sound: 0 0 Capacity: 41,000 Btuh 40,000 Btuh Sensible Capacity: n/a 30,000 Btuh Latent Capacity: n/a 10,000 Btuh AHRI Reference No.: n/a 9162731 C:\...\RENAR WILSHIRE 1860 MCMILLAN.rh9 Tuesday, April 17, 2016, 4:10 PM i ,