Loading...
HomeMy WebLinkAbout05) front and rear elev 2/2/21EXIST, POURED OR COMPOSITE T*E BEAM, SEE PLANS \ -- 11 - - - - 11-- 0 'tee 3/0" EXT, GRADE PLYWOOD BOTH SIDES W/2x6 RADIUS BLOCKING BETWEEN a 6" O,C, FOR CORNER RADIUS PANELS, (3) 16d NAILS INTO EACH BLOCKING: THRU PLYWOOD SIDES, ANCHOR 2x8 F.T. BLOCKING TO WALLS b BEAM Al 31111 TAPCONS AT 6" O,G, STAGGERED. PLYWD. TO 2x 11w 'VIE llmw life — NOTE: REMOVING OF FALSE FRAMING AT ARCHED OPNG'S. IS ACCEPTABLE NEW WINDOWS AND DOOR WILL BE ATTACHED TO THE EXIST. BLK. 8 GONG. - NO STRUCT. INTEGRITY IS BEING LOST. STUCCO BAND ATTACH WINDOW TO WOOD HEADER THROUGH FRAME W/ •10 WOOD SCREWS (SCREWS PER MANUF, SPECS) 1 3/8" MIN, EMBED. COVER W/ STUCCO 4 CAULK JOINTS CONT. BEAD OF DAP PREMIUM POLYURETHANE ADHESIVE SEALANT OR EQ, BEHIND FIN OR FLANGE 8 _ CONNECTION BETWEEN _ WIN. FRAME 8 STUCCO, ALUMINUM WINDOW 5/8" STUCCO ON P.B. METAL LATH ON TYVEK VAPOfR- BARRIER ON 1/2" CDX PLYWOOD SHEATHING ON 2x STUDS w 16" O.C. EXIST BLK, WALLS s FILL D CELLS �4EAD -or--I/2" DRYWALL BOX CUT TYVEK AT OPENING AND FINISH ROUGH OPENING W/ PEEL-N-STICK FLASHING AROUND ENTIRE OPENING, FLASHING TO OVERLAP TYVEK 2" 0 EXTERIOR AND RETURN TO DEPTH OF ROUGH OPENING (MIN,) PER 2011 F,B.C. (ii EDITION) R-103,4 (1,4) INSTALL PER FMA/AAMA 100-12 WINDOW INSTALLATION SPEC, WOOD SILL W/ SKIRT TRIM VERIFY DESIGN W/ OWNER pBL, SILL PLATE NAILED TO 2x STUDS e SP4 OR SPlo 9D 16" O,C, 11/2" DRYWALL SILL 3/4"=1'O 12' 0" 2ND F,F, O' 0" FIN, FL. _21 8" BRG, HT,_ 10' 2" BRG. HT, O' 0" FIN, FL. �3 O" BRG. HT, _ EW STAIRWELL SCOPE Of= FRAME DN. ARCHED jj� � n OPN'Cs, -STUCCO TO II I III MATCH EXIST, 12 3,8 � ui r oi 9&M Ix _21' 8" BRCS, HT. w Elm 42" ALUMIN. RAILING W/ TEMP. GL. PANELS REMOVE EXIST, FRAME DN, STUCCO ARCHES - - - _I210 3/4" 2ND F,F(V 10i 2" BRG,T. ll�tkiFC I Fm I i I)li �P3O�[1 I RI-=.EVA1I IION 8' 2" BRG, HT, O'-O" FIN, FL, _1' 10" FIN, FL. z 6 2zQ 0 z — — 10 d — O > Oco 0 O 04w d) c9 ,� U�4 Om , S Q 0 «, Q w 9 0 c = N O \n z u p CL O m 2 Q s « Q m U 4 p -0 0 3 3 N • Z W W � V O TTll � � V � N � _O � r1 � N m •� O W DATE 10/23/20 DRAWN BY pie me CHECKED Mc REVISIONS _ 11/30/20 PER 5-D 2/1/21 WORK AREA