HomeMy WebLinkAboutProject Informationr Job: Lot 22 Block 2 Watersto...
DEL -AIR Manual S Compliance Report
Date: NOVEMBER 3, 2010
HEATING•-AIRCOROIiIORING Entire House By: Dcs
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
euroject intormation
For: ADA-MS HOMES
8212 Amalfi Circle, Fort Pierce, FL 34951
Cooling Equipment
Design Conditions
Outdoor design DB:
90.4°F
Sensible gain:
26546
Btuh Entering coil DB: 76.3°F
Outdoor design WB:
77.4°F
Latent gain:
5120
Btuh Entering coil WB: 63.2°F
Indoor design DB:
75.0°F
Total gain:
31666
Btuh
Indoor RH:
50%
Estimated airflow:
1167
cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: SplitASHP
Manufacturer: Carrier Model: 25HBC537A0030+FX4DNF037L
Actual airflow: 1167 cfm
Sensible capacity: 27990 Btuh 105% of load
Latent capacity: 5312 Btuh 104% of load
Total capacity: 33303 Btuh 105% of load SHR: 84%
Design Conditions
Outdoor design DB: 41.0°F Heat loss: 27046 Btuh
Indoor design DB: 70.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split ASH
Manufacturer: Carrier Model: 25HBC537Ao030+FX4DNF037L
Actual airflow: 1167 cfm
Output capacity: 31697 Btuh 117% of load
Supplemental heat required: 0 Btuh
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflow: 1167 cfm
Output capacity: 7.8 kW 99% of load Temp. rise: 21 OF
Meets all requirements of ACCA Manual S.
Entering coil DB: 69.6°F
Capacity balance: 35 IF
Economic balance: -99 OF
-*- wrightsoft, 2020-Jun-1212:00:23
��*•�• �� •wM•- �mwm Right -Suite® Universal 2019 19.0.12 RSU23828
ACCK
Page 1
..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
I
®EL -AIR Com onent Constructions Job: Lot 22 Block 2 Watersto...
:ikwDate: NOVEMBER 3, 2010
NEATING�AINCONDm6ti1NG Entire House By: DCs
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL32771 Phone: 407-333-2665
Project• •
n
For: ADAMS HOMES
8212 Amalfi Circle, Fort Pierce, FL 34951
Location:
St Lucie Co Intl, FL, US
Elevation: 26 ft
Latitude: 28°N
Outdoor: Heating
Dry bulb (OF) 41
Daily range (°F) -
Wet bulb (°F) -
Wind speed (mph) 15.0
Indoor:
Indoor temperature (°F)
Design TD (OF)
Relative humidity (%)
Cooling
Moisture difference (gr/lb)
90
Infiltration:
15 ( L )
Method
77
Construction quality
7.5
Fireplaces
Heating Cooling
70
75
29
15
30
50
2.4
56.9
Simplified
Average
0
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft' BtuhW °F ftMF/Btuh BluhV Btu BtuhM Btu
Walls
12C-Osw: Frm wall, stucco ext, 3/8" wood shth, r-13 cav ins, 1/2"
gypsum board int fnsh, 2"x4" wood frm, 16" o.c. stud
Blk wall, stucco ext, r-4 ext bd ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
12C-Osw: Frm wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board
int fnsh, 2"x4" wood frm, 16" o.c. stud
n
63
0.091
13.0
2.64
167
2.21
140
e
124
0.091
13.0
2.64
328
2.21
275
se
26
0.091
13.0
2.64
68
2.21
57
s
38
0.091
13.0
2.64
101
2.21
85
w
12
0.091
13.0
2.64
30
2.21
26
all
263
0.091
13.0
2.64
694
2.21
582
n
354
0.201
4.1
5.83
2061
4.06
1436
e
252
0.201
4.1
5.83
1471
4.06
1025
se
4
0.201
4.1
5.83
25
4.06
17
s
376
0.201
4.1
5.83
2192
4.06
1527
w
207
0.201
4.1
5.83
1209
4.06
842
all
1194
0.201
4.1
5.83
6958
4.06
4847
242
0.091
13.0
2.64
639
1.31
317
Windows
10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, n
1/8" thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 23 ft
overhang (6.7 ft window ht, 0.75 ft sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, n
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1 ft e
overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht s
all
10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, e
1/8" thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 9.33 ft
overhang (6.7 ft window ht, 0.75 ft sep.); 6.67 ft head ht
18 0.550
0
16.0
285
12.6
226
32 0.330
0
9.57
310
8.52
276
49 0.330
0
9.57
465
23.2
1127
16 0.330
0
9.57
155
8.66
140
97 0.330
0
9.57
929
15.9
1543
18 0.550
0
16.0
285
12.6
226
" 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, a 17 0.330 0 9.57 160 8.52 142
' 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 6.67 ft
overhang (5 ft window ht, 0.33 ft sep.); 6.67 ft head ht
" Wri-ghtsoft® 2020-J un-1 2 12:00:23
% �M,.t•, ww..,<.mw., Right -Suite@ Universal 2019 19.0.12 RSU23828 Page 1
ACC..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
( Y
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
a 30 0.330
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 9.33 ft
overhang (5 ft window ht, 0.33 ft sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
se 13 0.330
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 11 ft
overhang (5 ft window ht, 0.33 ft sep.); 6.67 ft head ht
10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
s 16 0.550
1/8" thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 23 ft
overhang (6.75 ft window ht, 0.75 ft sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
s 10 0.330
1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1 ft
overhang (3.17 ft window ht, 0.83 ft sep.); 6.67 ft head ht
213-2fv: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
w 7 0.330
1/8" thk; NFRC rated (SHGC=0.31); 7.67 ft overhang (1.33 ft window
ht, 0.5 ft sep.); 6.67 ft head ht
2B-2fv: 2 glazing, clr low-e outr; air gas, vnl frm mat, clr innr, 1/4" gap,
w 7 0.330
1/8" thk; NFRC rated (SHGC=0.31); 50% drapes, medium; 7.67 ft
overhang (6.7 ft window ht, 2.83 ft sep.); 6.67 ft head ht
w 7 0.330
all 13 0.330
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
w 32 0.330
1/8" thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1 ft
overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap,
w 39 0.330
1/8" thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1 ft
overhang (6.25 ft window ht, 2.83 ft sep.); 6.67 ft head ht
Doors
11JO: Door, mtl fbrgl type
w 20 0.600
Ceilings
16B-30ad:Attic ceiling, asphalt shingles roof mat, r-30 ceil ins, 1/2"
2322 0.032
gypsum board int fnsh
Floors
22A-tpl: Bg floor, light dry soil, on grade depth
202 0.989
0 9.57
287
8.52
256
0 9.57
120
8.52
107
0 16.0
251
12.6
199
0 9.57
93
8.52
83
0 9.57
64
11.6
77
0 9.57
64
19.1
128
0 9.57
64
19.1
128
0 9.57
128
19.1
256
0 9.57
310
21.6
700
0 9.57
369
21.6
833
6.3
17.4
350
17.6
353
30.0
0.93
2154
1.69
3922
0
28.7
5798
0
0
W rightsOft" 2020-Jun-12 12:00:23
Right-Suite@ Universal 2019 19.0.12 RSU23828 Page 2
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
h
Pro ect Summar Job: Lot 22 Block 2 Watersto...
DEL -AIR Date: NOVEMBER 3, 2010
NEONG'4.mn ooNDmoNWo Entire House By: Dcs
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
For: ADAMS HOMES
8212 Amalfi Circle, Fort Pierce, FL 34951
Notes: HA update 5/14/14
RVSD 8-20-15 JA
L.S 8-11-16 JTW
L.S 8-16-16 JTW
Desian Information
Weather: St Lucie Co Intl, FL, US
Winter Design Conditions Summer Design Conditions
Outside db
41
OF
Inside db
70
OF
Design TD
29
OF
Heating Summary
Structure
23850
Btuh
Ducts
3196
Btuh
Central vent (0 cfm)
0
Btuh
(gong)
Humidification
0
Btuh
Piping
0
Btuh
Equipment load
27046
Btuh
Infiltration
Method
Construction quality
Fireplaces
Simplified
Average
0
Heatin
Coolingg
Area (ftz)
228q
2281
Volume (ft3)
20789
20789
Air changes/hour
0.36
0.19
Equiv. AVF (cfm)
125
66
Heating Equipment Summary
Make Carrier
Trade CARRIER
Model 25H BC537AO030
AHRI ref 10487322
Efficiency
Heating input
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
Capacity balance point = 35 OF
Backup:
8.5 HSPF
34600
Btuh @ 47°F
27
OF
1167
cfm
0.043
cfm/Btuh
0.30
in H2O
Input = 8 kW, Output = 26641 Btuh, 100 AFUE
Outside db
90
OF
Inside db
75
OF
Design TD
15
OF
Daily range
L
Relative humidity
50
%
Moisture difference
57
gr/lb
Sensible Cooling Equipment Load Sizing
Structure
20952
Btuh
Ducts
5594
Btuh
Central vent (0 cfm)
0
Btuh
(none)
Blower
0
Btuh
Use manufacturer's data
y
Rate/swing multiplier
1.00
Equipment sensible load
26546
Btuh
Latent Cooling Equipment Load Sizing
Structure
3544
Btuh
Ducts
1576
Btuh
Central vent (0 cfm)
0
Btuh
(none)
Equipment latent load
5120
Btuh
Equipment Total Load (Sen+Lat)
31666
Btuh
Req. total capacity at 0.75 SHR
2.9
ton
Cooling Equipment Summary
Make Carrier
Trade CARRIER
Cond 25HBC537AO030
Coil FX4DNF037L
AHRI ref 10487322
Efficiency 12.5 EER, 15.5
SEER
Sensible cooling
26250
Btuh
Latent cooling
8750
Btuh
Total cooling
35000
Btuh
Actual air flow
1167
cfm
Air flow factor
0.044
cfm/Btuh
Static pressure
0.30
in H2O
Load sensible heat ratio
0.84
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wr.R!�oft- 2020-Jun-1212:00:23.
A w^-•.� Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1
..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
DEL -AIR Right-J® Worksheet
Iffma• wa coNamaNara Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
Entire House
M BR
2
Exposed wall
202.2 It
40.0 ft
3
Room height
9.0 ft d
8.0 It heat/cool
4
5
Room dimensions
Room area
2321.5 ftz
1.0 x 268.0 ft
268.0 ft2
Ty
Construction
U-value
Or
HTM
Area (ftz)
Load
Area (ftz)
Load
number
(Btuh/W-°F)
(Btuh/ftz)
or perimeter (ft)
(Muh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
.
-
12GOsw
Blk wall, stucco ext
0 091
550
0.201
n '
Rom;
n
2 64;
�., 15 95;
5.83
2 21
_. �12 64
4.06
' '81
: 18
386
63
0
354
140
67
, _s285
2061
1___.
__. _ 226
1436
'- .
81 �
18
0
63
_:__0
0
'16Z
;
285
0
140
__ 226.
0
Vy
1 1
2A-2ov
12C Osw
10C v
2A 2ov
2A 2ovu
0.330
0 091
0 550
0 330
0.33.0
n-
a
a
e
__?,.._
9.57
2.64
15 95
9.51
8 57
8.52
2 2T
12 64
6 52
32
189
18
= 17
__, 0
124
18
17
310
328
285
160
276
275
226
142
0____
0
0
0
0
�,_ 0
0
0
0
Q
-_ - 0
0
0
0
W _ _ 0.
0
0
0
0
_. _ 0,
-a
t-G
W
"w�..._G..�10C_v__..w�_-_..__:,:_
V)J
Blk wall, stucco ext
2A-2ov
12C Osw
2Q 2ov _
Blk wall, stucco ext
12C Osw
Blk wall, stucco ext
0.201
0.330
0.091
n_ w0,330
0.201
0 091
__.,___.0;550
0.201
a
a
se
se
se
5.83
9.57
2 64'
5.83
2 64'
�,.�. 1598.
5.83
4.06
23.20
2 21'
4.06
2 21
°�.�1264:•_...____1,6
4.06
301
49
38
� „._5
4
54
402
252
0
1 26
____13
4
38
,__..__16
376
1471
465
68
_.__.."_120
25
101
_ �_�;�2b1
2192-1527
1025
1127
w 57
_..., 102
17
85
199,_�:_,:__�.
120
32
0
._.._:_ _0
0
0
0�'..___t_0
88
0
0
_0
0
0
0
511
310
_ 0.
0
_ ` 0
" .0
356
751
0
0
0,
,_:_�0.
s .
- s
s
128
128
746
520
2A-2ov
2A-2ov
12GOsw
B 2fv
8-
26 2fv
0.330
0.330
0 091
O',330
0 330
s
s
w
w .
w
9.57
9.57
9 57
9 57
8.52
8.66
2 21
t 11 58
19 08
10
16
A5
7
= 7
10
14
1230.
7
x.4
93
155
64
64
83
140
26
77
128
0
0
0
0
0
0
0
0
0
0
0
0
0
.0
0,
0
D
11J0
Blk wall, stucco ext
_ _0 600
0.201
_w
w
-, 1740,
5.83
17 58
4.06
•-- z_20
285
_ ro_20
207
1209
842
__.,
0
0
0
0
C
2A-2ov
2A-2ov
2B-2fv
1613-30ad
:...._-_:_.
0.330
0.330
0.330
_
91
0.032
0 989
w
w
w
77
._k.`1_.::
9.57
9.57
_ 9.57
? 64;
0.93
__ 28.68'
21.62
21.62
19.08
a�__0
1.69
� �._-0 00
32
39
7
_ __.
2322
,�_ ,2322
0
0
4
2322
202
310
369
64
2154
5798
700
833
128
3922
-_..,_. 0
0
0
_ 0
0
0
0
268
0
0
0
249
0
0
0
268
V _ .268
453
- -
-.- --_.. n_
f -
_
N
w
6
c) AED excursion
119
-79
Envelope loss/gain
19875
14788
3414
2366
12
a) Infiltration
3975
1114
733
205
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants Qa 230
5
1150
1
230
Appliances/other
3900
1
1300
Subtotal (lines 6 to 13)
23850
20952
4147
3101
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
23850
20952
4147
3101
15
Duct loads
13%
271/6
3196
5594
13%
27%
556
828
Total room load
27046
26546
4702
3929
Air required (cfm)
1167
1167
203
173
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-➢'�- wr➢gtstsoR- 2020-Jun-1212:00:23
Aft Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
DEL AIR Right-M Worksheet
m"°a-MCOM°OOM Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
WIC
WIC
2
Exposed wall
7.0 ft
0 ft
3
Room height
8.0 ft heat/cool
8.0 ft heat/cool
4
5
Room dimensions
Room area
6.0 x 7.0 ft
42.0 ftz
5.0 x 7.0 ft
35.0 ftz
Ty
Construction
U-value
Or
HTM
Area (ftz)
Load
Area (ftz)
Load
number
(Btuh/ftZ°F)
(Btuh/ft2)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
I Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
12GOsw
Blk wall, stucco ext
0.091
0.201
ri
-_n.
n
2 64
15 95:
5.83
- 2 21;
1264
4.06
0
0
0
0
0
0
0
0
0
0
0
0
tW
„w.
0
_ ,.--0
0
0
11
--G, G
2A-2ov
12C-0sw
10C v
2A 2ov
0,.330
0:091
0.550
01330
_ZJO 330
n
e,
a
e,
_.e
_ 9.57
2 64
15.95
957
9 5.7_
F T - 57
8.52
' 2 21
12 64
8.52
4,z 8,52
0
' 0
0
0
Po - 0
_ _ 0
.0
0
0
~~T� 0
0
0
0
0
m0
_ 0
° 0
0
0
0
0
0
0
M"
0
7 0
0
0
a �
0
" 0
0
0
•_.__0
_ _�0
0
0
0
1�l
�G
W
V►!
µ
Blk wall, stucco. ext
2A-2ov
2A 2ov
Blk wall, stucco ext
12C-0sw�
w
0.201
0.330
e
a
9.57
4.06
23.20
0
0
' 0
.. ..:0
0
0
0
0?0
0
0
�326
0
0
0
0
�227
t)
0
0
0
Y _
0
0
0
0
0
0
0
_--
0
=Q
o
0
0
0
- -- --0
0.201
0.091
550
se
s:,
s_'
2.
9.57
5.83
2 64
. 15 9,5:
4.06
Y 2 21
z12.64
Blk wall, stucco ext
2A-2ov
2A-2ov
12C 0sw
26 2fv
2B 2fv :`
Blk wall, stucco ext
0.201
0.330
0.330
0,091
0.330
0:330
0600
0.201
s
s
s
w
w,
w
w
w
5.83
9.57
9.57
2 64
,; 9 57
9 57'
; ?_7.:40
5.83
4.06
8.52
8.66
2 21
11 58
19 08
_�17.58.�
4.06
56
0
0
4
0
0
_0
0
56
0
0
_ 0
0
0
_J___A
0
0
0
�0
0
0
Y � 0.�._
0
0
0
0
0
0
0
_ 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0''
0
0
0
0
0
0
0
0
0
0
0
C
2A-2ov
2A-2ov
2B-2fv
16B-30ad
0.330
0.330
0.330
0.032
___,.,_0.989
w
w
w
__--
9.57
9.57
9.57
0.93
. _28.68
21.62
21.62
19.08
1.69
_ 0.00
0
0
0
42
-- -;._ 42
0
0
0
42
. ____ : 7
0
0
0
39
�__. 204
0
0
0
0
0
0
35
0
0
0
_,.:._�_0
35
0
0
0
.���_
0
0
0
59
71
__0
32
_
-
.w.r _.
- -
.__.,w_
-
.,,.
wM_ _..ram. ..,........i.:......,._
L _,.. a7�L
.. ..�
,._.-.... ....
......w.....-r-.
...,._.��._.
.�.._._
,_%.._
1:.__..__�_
....._.�....
,.....__. __
-...
.,_.u,,..-._.......-_....a...1u,......s.
-...o.».w
...._... u....L
-...x.,...u.,.we
.. ..«..
........v._ -..
..«...-.
w-h-s
«-.._... _,.....
,..._.._....-
6
c) AED excursion
-19
-3
Envelope loss/gain
566
280
32
56
12
a) Infiltration
125
35
0
0
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants Qa 230
0
0
0
0
Appliances/other
0
0
Subtotal (lines 6 to 13)
691
315
32
56
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
691
315
32
56
15
Duct loads
13%
27%
93
84
13%
27%
4
15
Total room load
783
399
37
71
Air required (cfm)
341
18
2
3
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
44 - 2020-Jun-1212:00:23
C� ^""." Right -Suite® Universal 2019 19.0.12 RSU23828 Page 2
...aterstone2265AGL\Lot228lk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
WDEL,AIR Right-M Worksheet
KMG- CONnmoNma Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
M BATH
WC
2
Exposed wall
11.0 ft
0 ft
3
Room height
8.0 It heat/cool
8.0 ft heat/cool
4
5
Room dimensions
Room area
1.0 x 140.0 ft
140.0 ft2
1.0 x 25.0 ft
25.0 ft2
Ty
Construction
number
U-value
(Btuh/ft2-OF)
Or
HTM
(Btuh/ft2)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Heat
TC001
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
.'
12C Osw
�10C_v" �„
�0091
�0 550
n-;,
__n .
264
_ 15:95.
221,7-77
_ .12 64
`0
w -0
_ 0
0
0
" " 00
- 0
• --,A
' �0
A
Blk wall, stucco ext
0,201
n
5.83
4.06
0
0
0
0
0
0
0
0
11
r
.
2A 2ov
12COsw
10C v
2A 2ov
2A 2ov ,_ _
0.330
0091
0.550
0.330
_n0 330
n.
e°
a
e
e _
9.57
264
15.95
'9.57
. , ' 99 57
8 52
221'
12.64
8.52
, - 8 5.2
0
0
0
0
-.. _ __5
0
0
0
0
._.. 0
0
0
0
011
0
0
0
0
0
0
0
0
0
0
0
0
0
7 0
0
0
0
10
0;
0
V►/
-G
W
Blk wall, stucco ext
2A-20v
12C-Osw _
Bik wall, stucco ext
Y
12C Osw ,�
0.201
0.330
O'091
_.. 0.330
0.201
0 091
0 550
a
a
w_.
se .
_se_
se
s
._s-..:
5.83
. 9.57
2:64
.. _-9.57.._._._._.,_0
5.83
2 64`
-15 95.
4.06
23.20
2 21
4.06
E!'
--12 64
0
0
D
0
-0
, 9
0
0
0
0
0
_ . 0
0
0
0
0
.... -_0
0
0
0
A
_ R
0
0
0
0
0
:�
0
0
0_
0
0
_.
0
0
0
. u ._ q
0
y 0
_ -
0
0
-0
_ ...- . Q.
0
0'
LL --GG
D
Blk wall, stucco ext'
2A-2ov
2A-2ov
120Osw
2B 2fv
2B 2fv
1]JO _ �._<'
Blk wall, stucco ext
0.201
0.330
0.330
0.091
0 330
0 330
_ _ ...0`600
0.201
s
s
s
w
w,
w
. W .
w
5.83
9.57
9.57
2 64
9.157
9.57
1,7, 40.
5.83
4.06
8.52
8.66
2 2t
11 58
19.08
.�17 @8�
4.06
88
10
0
" 0
. 0
0
: _ _ _ 9
0
78
10
0
0
0
0
_4_ w Q
0
456
93
0
0
0
0
�_ :. 0
0
318
83
0
0
0
0
.. a _ 0
0
0
0
0
0
0
0
_ f-Ljo
0-
0
0
0
0
0
0
° -o
0
0
0
0
0_
0
0
- 0
0
0
0
0
0
0
0'
0
_ C
2A-2ov
2A-2ov
2B-2fv
16B-30ad
0.330
0.330
0.330
0.032
_
w
w
w
9.57
9.57
9.57
0.93
_
.._28,68
21.62
21.62
19.08
. 1.69
_.000
0
0
0
140
W
r _..]40
0
0
0
140
.; u_,1]
0
0
0
0
0
0
237
0
0
0
25
- -
0
0
0
25
• -
0
0
0
0
23
0
0
0
42
-
0
130
_ 315
._._.-...ham �
.,s...._
�.t ......_...�.. ,.._..._.,.,.ti.
_,.._4.:
.._...
..............c:,tix
a_._....�,...
_,_.......`
�.aa.._..
.._...w..�_..
.�.t......_
_......._..-»
-..-._._....._
6
c) AED excursion
-39
-2
Envelope loss/gain
995
599
23
40
12
a) Infiltration
196
55
0
0
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
0
0
0
0
Appliances/other
0
0
Subtotal (lines 6 to 13)
1191
654
23
40
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
1191
654
23
40
151
Duct loads
13%
27%
160
175
13%
27%
3
11
Total room load
1350
828
26
51
Air required (cfm)
1
58
36
1
2
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-rid- 2020-Jun-1212:00:23
Right -Suite® Universal 2019 19.0.12 RSU23828 Page 3
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
RDEL--AIR Right-JO Worksheet
Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
LIV
FAM
2
Exposed wall
32.0 ft
24.0 ft
3
Room height
10.0 ft heat/cool
10.0 ft heat/cool
4
5
Room dimensions
Room area
15.0 x 12.0 ft
180.0 ft2
1.0 x 511.5 ft
511.5 ft2
Ty
Construction
U-value
Or
HTM
Area (ftz)
Load
Area (ft2)
Load
number
(Btuh/ftz°F)
(Btuh/ftz)
or perimeter (ft)
(I3tuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
=.
VI/
12C Osw -: -
_10C_v
Blk wall, stucco ext
0.091
-__-0.550
0.201
n
_n .
n
2 64`
15 95
5.83
2 21.
_�12 64
4.06
t)
: __�. 0
t 0
'_-0L-G
50
0
291
0
203
�; 6
0
0
0
"0�
0
0
-U
0
50
11
-G
`. W,�-G
f-- (
L_-_C..
2A-2ov
12C 0sw
10Gv
2ov
.2ov . _.._
0.330
0,091
0.550
0 330
_._0.330
n_
e,
a
e
_.,ew
9.57
r 2 64
15.95
9 57
_9 57
8.52
2 2i
' 12 64
8 52
;.,. )3.52_287
0
; 0
: 0
.' 0
.0
�' 0
0
0
0
0
0
0
6
0
0
0
0
144
18
0
0
' � 96
18
0
0
' 254`
285:
0
0
226
0
_. 256
yJ
T-G
Blk wall, stucco ext
2A-2ov
1
0.201
0.330
a
a
5.83
9.57
4.06
23.20
0
0
0
0
0
0
0
0
16
0
16
0
93
0
65
0
22GOsw� 21,
0
_ O
_ 0
_
..26
W
Vj/
2av _ _ ..._.
Blk wall, stucco ext
12C-0sw -'
_ _. , 0 330
0.201
0:091
_ se,_
se
M- _9 57
5.83
_._8 52
4.06
_ _.__. Q
0
0
_0
___:_0
0
0
-0
0
0
.__._ _0
0
0_'
0
0
_0
`. 0
0.
0
0
0
0
Blk wall, stucco ext
2A-2ov
2A-2ov
0.201
0.330
0.330
0 091
0 330
0.330
00
0.201
s
s
s
w
w
w
._ w
w
5.83
9.57
9.57
2 64
9 57
9 57
_. 17 40:
5.83
4.06
8.52
8.66
2 21
11 58
19.08
_ 17 58
4.06
120
0
16
0
` 0
0
, _._ 0
150
104
0
14
0
0
0
_ ` Q
118
605
0
155
0
0
0
__ __a O
686
421
0
140
0
0
0
.-_ _: __. 0
478
0
0
0
45
7
7
_. 20
35
0
0
0
0
0
0
30
64
64
165
0
0
0
rn'26,
77,
128
115
12C 0sw
26 2fv
26 2fv
Blk wall, stucco ext
12
7
4•-
. _ 20
28
- C
F
2A-2ov
2A-2ov
213-2fv
1613-30ad
- -
22A_tpl __ :.....
0.330
0.330
0.330
_ 0.091
_ ._ 0.032
...____0.989
w
w
w
_ =
_
_-
9.57
9.57
9.57
°--2 64
0.93
_
28 68
21.62
21.62
19.08
_.__ 1.31;
1.69
.r .
_..._0 00
32
0
0
_ _ ;0
180
- ----
180
0
0
0
_ _ 0
180
_ .�...,:32
310
0
0
__ _. 0
167
` _�
a.... �918
700
0
0
t _ _ 0
- 304
_ _ __ 0
0
0
7
_ : :_ 0
-- 512
_. ._512
0
0
4
512
.._s __24
0
-0
64
0
475
._ _...--
_ :� .._688
0
0
128
- -0
864
Y
s .r..
M,.w, ._...r_ �_...
.-.. -
-:
i-
6
c) AED excursion
167
86
Envelope loss/gain
3132
2414
2819
2536
12
a) Infiltration
712
200
534
150
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants Qa 230
0
0
3
690
Appliances/other
300
600
Subtotal (lines 6 to 13)
3844
2913
3354
3976
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
3844
2913
3354
3976
15
Duct loads
13%
27%
515
778
13 %
27 %
449
1062
Total room load
4359
3691
3803
5037
Air required (cfm)
188
1621
164
221
Calculations approved bV ACCA to meet all requirements of Manual J Sth Ed.
-PW 2020-Jun-1212:00:23
C Right -Suite® Universal 2019 19.0.12 RSU23828 Page 4
...aterstone2265AGLLot22Blk2Waterstone2265AGL.rup Cato = MJ8 House faces: W
DEL: AIR Right-J® Worksheet
IQAMM- AM CONDMOPoNO Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
DIN
UTIL
2
Exposed wall
11.0 It
0 ft
3
Room height
10.0 It heat/cool
8.0 ft heat/cool
4
5
Room dimensions
Room area
11.0 x 11.0 ft
121.0 ftz
7.0 x 11.0 ft
77.0 ftz
Ty
Construction
U-value
Or
HTM
Area (ft2)
Load
Area (W)
Load
number
(Btuh/ftZ°F)
(Btuh/ft2)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
W
12C Osw
Blk wall, stucco ext -
0091
_ _,0 550
0.201
n;
_ n
n
2 64
' . 15 95
5.83
2 21
_8.04
4.06
:0
! _ __• 0
0
0
- - 0
0
0
- Q
0
._w��_0
0
0
0
0
_ 0
0
U
� (t:
0
n0
0
1 1
-G
2A-2ov
12C Osw .;:
10Gv
2A 2ov
0.330
0 091
0 550
0.330
,_ ,. 0 330
n
a
a
e
e
9.57
2 64'
15.95
9.57
9 57
8.52
2 2i
12.64
8.52
._ w 8,52
0
0
0
0
0
~0
0
0
, 0
0
0
0
0
0
0
0
0
0
0
0
y 0
_ 0
0
0
0
0
r 0
0
T 0
0
0
0
0
0
0
0
0
0
6
_.._... __0
0
t-G
Blk wall, stucco ext
2A-2ov
2av--_v..
Blk wall, stucco ext
12GOsw`
_10Gv __.. _ _
0.201
0.330
0.091
.__..�.0330
0.201
0.091
.:. O 550
a
a
se
_sg
se
s-'`
_ s,._
5,83
9.57
- 2:64
�_9.57
5.83
2 64
_ _ 15 95.
4.06
23.20
2.21'
. 8,52
4.06
; 2 21
12 64
0
:0
-. _ .:a._ Q
0
0
:. _�0
0
0
� 0
0
0
0
____.. Q
0
0
0
..__. _d0
0
0
___ .v_,D
0
0
--� 0
_ __. 0
0
0
0
. _0
0
0
0
0
~' 0
_._ 0.
0
6
0
0
6
:0.
0
a)
.'----0-
w!-G::2A
W
VV��/I •
0
0
0
0
0
0
0
0
0
0
0
0
0'
0
0
0
0
0
�- D
0
0
0
II----GG
_D-
Blk wall, stucco ext
2A-20v
2A-2ov
12C Osw `�
2B 2fv
2B 2fv
11J0-_ _ .__:.
Blk wall, stucco ext
0.201
0.330
0.330
0 091
0 330
0 330
__.__.0600
0.201
s
s
s
w�
w
w
w.
w
5.83
9.57
9.57
2 64
9 57
9 57
1740'.�
5.83
4.06
8.52
8.66
2 21
11.58
19 08
1758
4.06
10
0
0
_____ 0
0
0
_. `0
100
10
0
0
� 0
0
0
.0
61
58
0
0
0
0
0
_ __0
358
41
0
� 0
0
0
0
0
0
0
0
0
~~� 0
250
2A-2ov
2A-2ov
2B-2fv
0.330
0.330
0.330
w
w
w
9.57
9.57
9.57
a:._.
21.62
21.62
19.08
_.J 31,
0
39
0
J.O
0
0
0
._.z�.. 10
0
369
0
___j6
0
833
0
13
0
0
0
v 72
0
0
0
... _ _72
0
0
0
0
0
0
C
166-30ad
0.032
-
0.93
1.69
121
121
112
204
77
77
71
130
:F„„ r
22A tph. ._m _.. _ ,
. _0,989
_.
__28.68,
-__.0 00
_ _ :121
.: _ ,.,p11
_
._ _ 315
__-T_0
_R
__ ___
__ - 0
_
_
_
._.
...,w....a.....
_„.t.._.x
�««.... «,.....
...-.....z
.,...�-»..
,.........,.i
..3.....s.
�.._.
,:A+.._d_w ..a,
77
....,.o, 1ex..:.__,u-e.._._.
,..._.._.,._,..
6
c) AED excursion
346
-46
Envelope loss/gain
1240
1687
261
179
12
a) Infiltration
245
69
0
0
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants Qa 230
1
230
0
0
Appliances/other
0
600
Subtotal (lines 6 to 13)
1484
1985
261
779
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
1484
1985
261
779
15
Duct loads
13%
27%
199
530
13%
27%1
35
208
Total room load
1683
2515
297
986
Air required (cfm)
73
111
13
43
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-4*- 2020-J un-1 2 12:00:23
C� Right -Suite® Universal 2019 19.0.12 RSU23828 Page 5
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
WDEL--AIR Right-JO Worksheet
armwc•aMcommawaa Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
BATH 2
BR 2
2
Exposed wall
0 ft
14.0 ft
3
Room height
8.0 ft heat/cool
8.0 It heat/cool
4
5
Room dimensions
Room area
6.0 x 9.0 It
54.0 ft2
12.0 x 14.0 ft
168.0 ft2
Ty
Construction
U-value
Or
HTM
Area (ft2)
Load
Area (ft2)
Load
number
(Btuh/ftZ°F)
(Btuh/ft2)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
TC001
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
`.
W
12C Osw o
;10C_v_
Blk wall, stucco ext
0 091
0 550
0.201
n m
__0
n
2 64'
5.83
2 21"
4.06
0
_ _._-.__0
0
_ 0
0
112
__ __,__0
96
:=______LQ
558
389
0
11
-G
WE
i
_...
V)J
I-G
!- G:.2A.2oy
W
V�/
2A-2ov
-120Osw
10C v
2ov
2A-2ov _.W._ _. _
Blk wall, stucco ext
2A-2ov
12C Osw
_ _
Blk wall, stucco ext
12G Osw -
0.330
0.091
0 550
O'330
._ Q_330
0.201
0.330
O'091
a.._.._,0 330
0.201
0:091
Y�-0_.550
n
a ..°
a
e
e._
a
a
se
se_
se
s '
__ s.a
9.57
-7� 2 64:
15 95
9 57
_ - 8 57
5.83
9.57
- 2 64
_.9 57,
5.83
LL
_ 15.95..�
8.52
°" 2 21
12 64
8 52
._:.8.52
4.06
... 23.20
2 21
_ _852
4.06
12..64
0
i < d p
0
0
;j
0
0
0
• _:._.w:0
0
_.- �. 9
.0
` p
0
0
0
0
0
_., __ _0
0
_ ____- 0
0
0
0
0
0
0
_ 0
__ _� :0
0
__-_____._0
0
7777 0
0
0
0
0
0
0
16
7 -70
0
0
0
0
0
0
__ ,0
0
0I2A
0
0
0
____-_,.0
0
6
_ _0
155
0
0
0
0
0
., p,
_� _0
138
0
0
0
_ 0
0
o
___�__
0
0
0
p 0
0
0
0
0
0
0
0
0
0
0
TABlk
wall, stucco ext
2A-2ov
2A-2ov
12C Osw
2B 2fv
2B 2fv
Blk wall, stucco ext
0.201
0.330
0.330
6.091
0 $30
0 330
0.201
s
s
s
w-
w
w
w
5.83
9.57
9.57
2 64
9 57
9 57
5.83
4.06
8.52
8.66
2 2f
11 58
19 08
4.06
0
0
0
' 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
_ 0
0
C
2A-2ov
2A-2ov
2B-2fv
1613-30ad
:22A=tpl _. - ..:_�...:0.989
0.330
0.330
0.330
0.032
w
w
w
9.57
9.57
9.57
0.93
, . 28.68
777
21.62
21.62
19.08
1.69
., _0.00
0
0
0
__..48
54
` __,,,.54
-
v0
0
0
_w48
54
. _ �._ 0
0
0
0
_.. �_.127,
50
0
0
0
0
..�63
91
_ -.Y^ _ .0
0
0
0
. �v 112
168
_ _......_ ]68
0
0
0
_. �112_296.
168
-
0
0
_ 0
156
0
0
0
284
-
___.
71212
6
c) AED excursion
-9
-74
Envelope loss/gain
177
146
1566
884
12
a) Infiltration
0
0
249
70
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
0
0
0
0
Appliances/other
0
300
Subtotal (lines 6 to 13)
177
146
1816
1254
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
D
0
0
14
Subtotal
177
146
1816
1254
15
Duct loads
13%
27%
24
39
13%
27%
243
335
Total room load
200
184
2059
1588
Air required (cfm)
91
81
89
70
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-r.1- 2020-J un-1 2 12:00:23
Right -Suite® Universal 2019 19.0.12 RSU23828 Page 6
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
!�QEL,AIR Right-M Worksheet
ago • wa coxnmorm+o Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
13113
KIT
2
Exposed wall
14.0 ft
0 ft
3
Room height
8.0 It heat/cool
10.0 ft heat/cool
4
5
Room dimensions
Room area
1.0 x 158.0 ft
158.0 ftz
1.0 x 154.0 ft
154.0 ftz
Ty
Construction
U-value
Or
HTM
Area (ft2)
Load
Area (ftz)
Load
number
(Btuh/ftZ°F)
(Btuh/ft)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6'
12C Osw
0:091
m,"
2 64
2 21;
j 0
0
0
0
o
0
_. __0
0'
._0
0'
:0
W
Blk wall, stucco ext
0.201
n
5.83
4.06
112
96
558
389
0
0
0
0
I-G
_.___ ...
2A-2ov
10C v
2A 2ov
2A 2ov ___.
0.330
0;091
6.550
0330
0,330
n
e
a
e
.. a
9.57
2 64,
15 95
9 57
.._ 9 57_
8.52
2 21';
12 64
8 52
8 52
16
0
0
0
.. _ .__.0
0
0
0
0
_..___ 0
155
0
0
0
_._ w._.0
138
07
0
0-,
_ _.,0
0
0
0
0
".._, ___.0
0
ez 0
0
0
. , __ :0
0
7 Q
0
0
0
0
0
0
y/
L-G
.
Blk wall, stucco ext
2A-2ov
i2C Osw
2A 2ovr� z : _.y_._.
0.201
0.330
0.091
_.. 0:330
a
a
.: se
se
5.83
9.57
264
_ 9 57.._
4.06
23.20
. 2 21
0
0
' 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
' 0
0
0
- 0
_ 0
0
s r0
W
V\��JJ
Blk wall, stucco ext
12C Osw
0.201
se
_..
- s
5.83
2 fi4.
4.06
221
0
0
0
0
0
. 0
0
., _.0
0
: 0
0
0
V)J
Blk wall, stucco ext
0.201
s
5.83
4.06
0
0
0
0
0
0__._
0
0
II-(G
VVV►►►111
(L-G
VhBlk
2A-2ov
2A-2ov
12C Osw
2B 2fv
2B 2fv
wall, stucco ext
0.330
0.330
0 091
0 330
0 330
0.60A
0.201
s
s
w
w
w
_ W .
w
9.57
9.57
w 2 64
9 57
9 57
�_ 1,740
5.83
8.52
8.66
i 2 2f
11 58
19 08
` 175.8
4.06
0
0
' 0
0
' Q
-- .._ .0
0
0
0
- 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
"� 0
0
0
_Q
0
0
0
0
0
0
_�
_ 0.��__�0
0
0
0
.0
0'
0
0
0
0
0
0
0
0
2A-2ov
2A-2ov
213-2fv
12 cosw__._;
0.330
0.330
0.330
w
w
w
9.57
9.57
9.57
21.62
21.62
19.08
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
C
1613-30ad
0.93
1.69
158
158
147
267
154
154
143
260
_0.032
__-0. 989
_
:_28.68.
ry __,0.00
_.y __158
_..__.._ 1¢
__ 402
.a0
_ __. a 154
_-0
_ 0
.:_ _ .._. 0
..
._77Vyr-
..
...,
p., .......
. ..
.,....e.,..
...Y.._.._..ee�.::_........_a._.
Yr..,.,.».v-
,..
wtw,..:..
Fk .«w...
13a....4....
-. ..z.....,..
._.,._..._
......»_.._...
w.......u�.
...._.c._._.....,.
..�.�.»._...
..w._...,..._.
6
c) AED excursion
-65
-81
Envelope loss/gain
1262
729
143
179
12
a) Infiltration
249
70
0
0
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
0
0
0
0
Appliances/other
300
1200
Subtotal (lines 6 to 13)
1511
1099
143
1379
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
1511
1099
143
1379
15
Duct loads
13%
27%
202
293
13%
27%
19
368
Total room load
1713
1392
162
1747
Air required (cfm)
1
174
61
17
77
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrogtitso4ft- 2020-Jun-1212:00:23
e� "' ^"`"""• Right -Suite® Universal 2019 19.0.12 RSU23828 Page 7
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
DEL -AIR Right-J® Worksheet
fg9T IG•amcodam0MN0 Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
BRKFST
BATH 3
2
Exposed wall
9.2 ft
13.0 It
3
Room height
10.0 ft heat/cool
8.0 ft heat/cool
4
5
Room dimensions
Room area
1.0 x .142.0 It
142.0 ftz
1.0 x 76.0 ft
76.0 ftz
Ty
Construction
number
U-value
(Btuh/ftz°F)
Or
HTM
(BtutVftz)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
G.
W
12C Osw '
10C_v _
Blk wall, stucco ext
0-091
0.201
n ".
n
2 64`
5.83
2 21'
�_.12 64
4.06
0
..__._�._0
0
0
_
0
0
_ 00
0
0
0
0
0
0
0
1 1
-G
'
_
2A 2ov
'12C Osw
10C v ri
2A 2ov
2A_2ov . __,_
0.330
Ow091
O.550
0.330
n
8
a
e •
9.57
V 2 64'
15 95
9.57
_.9 57
8.52
r 2 21
12 64
8.52
..._ _. 8.52
0
49
0
17
...._ . __ '.O
0
J>'28
0
•17
,». _.___ 9
0
7568
0
160
__, 0
0
A
142
..n.__ 0
0
' 0
0
_ 0
. 0
0
0
p 0
0
0
`V ,- 0'?
0
"0
0
0
0
0
V►/
I-G
y/
W
Blk wall, stucco ext
2A-2ov
12C 0sw -^
2ov__ K...
Blk wall, stucco ext
12C Osw
10C v _ - ._
0.201
0.330
6:091
_...__0:330
0.201
0091
0;550
a
a
se
_,se,_
se
s
._s.
5.83
9.57
2 64
__.9.57
5.83
2 64
_ 15 95::.,_
4.06
23.20
2.21
. 8:52,
4.06
; 2 2f
_12 0,4
5
0
38
_._. 13
4
0
. _ _-_0
5
0
26
13
4
0
..0
29
0
w68
_ _. _r120
25
-" 0
.-._-.--
20
0
�^ 57
._ 1.07
17
- 0
56
0
0
�.._ 0
0
54
16
56
0
6
- .0
0
38
-__ .__16
227
0
0
__.._.. r0.
0
85
199:
326
0
0
0
0
101
251.
___ ___9
0
0
0
0
0
0
- � 0
0
�✓
{-�
�-G
yyll
D
VhBlk
Blk wall, stucco ext
2A-2ov
2A-2ov
12C Osw
26 2fv
26 2fv
11J0
wall, stucco ext y
0.201
0.330
0.330
0.091
0.330
0 330
_ 0_00
0.201
s
s
s
w;
w
w
_. w��
w
5.83
9.57
9.57
w 2 64
9.57.
9 57
1740
5.83
4.06
8.52
8.66
- 2 21•
11.58
• 19 08
.1.758,
4.06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
��
0
0
0
0
0
0
0
_0
0
• 0
0
0
-- 0'-_
0
0
_� 0
0
0
0
0'
0
0
�� _ _ 0.
0
0
0
0
0
0
0
__.. 0
0
0
0
0
0
0
0
_ 0
0
0
C
2A-2ov
2A-2ov
2B-2fv _..
16B-30ad
0.330
0.330
0.330
0.032
0.989
w
w
w
9.57
9.57
9.57
0.93
21.62
21.62
19.08
1.69
0
0
0
142
0
0
0
142
0
0
_ 0
132
___263
0
0
0
._ _ _._
240
0
0
.. 0
_�0
0
0
0
76
__-13
0
0
0
:_..
71
0
0
0
-_._0,
128
76
76
._.._.
_.._..,_...._..,n...,..�......_.„ ,..i........_.,..s......
.a.3....
,_..._.
.,._.._.,.
, ..mow..
.�..,_�,....
} ..m..
w..........
._._.�_...
.�_..._.
..._._....,..
6
c) AED excursion
-39
-39
Envelope loss/gain
870
606
1122
600
12
a) Infiltration
206
58
245
69
b) Room ventilation
0
0
0
0
13
Internal gains: Occupants @ 230
0
0
0
0
Appliances/other
0
0
Subtotal (lines 6 to 13)
1076
664
1367
669
Less external load
0
0
0
0
Less transfer
Redistribution
0
0
0
0
0
0
0
0
14
Subtotal
1076
664
1367
669
151
Duct loads 1
13 %
27%
144
177
13%
27 %
183
179
Total room load
1220
841
1550
847
Air required (cfm)
53
37
67
37
Calculations approved bV ACCA to meet all requirements of Manual J 8th Ed.
-44- wrYgtitsoft® 2020-Jun-12 12:00:23
Right-Suite® Universal 2019 19.0.12 RSU23828 Page B
...aterstone2265AGL1Lot22Bik2Waterstone2265AGL.rup Calc = MJ8 House faces: W
`, DEL -AIR Right-M Worksheet
`EUM-=COM OUNG Entire House
DEL -AIR HEATING AND AIR
CONDITIONING
531 CODISCO WAY, SANFORD, FL.32771 Phone: 407-333-2665
Job: Lot 22 Block 2 Waterstone 2...
Date: NOVEMBER 3, 2010
By: DCS
1
Room name
BR 4
2
Exposed wall
27.0 It
3
Room height
8.0 It heat/cool
4
5
Room dimensions
Room area
1.0 x 170.0 ft
170.0 ftz
Ty
Construction
U-value
Or
HTM
Area (ftz)
Load
Area
Load
number
(Btuh/W-°F)
(Btuh/ftz)
or perimeter (ft)
(Btuh)
or perimeter
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
V�/
12C Osw
0:091
n n,
. 2 64
- 2 21;
, ;
,_-0
-0. 550
n:_
15 95.
12°64
_ �_ _ 0
3_ 0_
Vl/
Blk wall, stucco ext
0.201
n
5.83
4.06
112
112
653
455
_
,2A-2ov
10C vj
2A 2ov
-„0.330
0.550
0 330
n
e,
e
_ e
9_57,
15 95
9 57
..., 9 57
8.52
12'64
8 52
_8.52
0
0
0
._. _L0
0
0
0
_ Q
0
0
0
-___ 0
0
« 0
0
V
104
16
0
0
_ 0
..0
0
0
0
_ ' 0
, 0
r 0
0
357
376
0
- 0
_0
0
0
0
r0
0
0
0
0
_
y/
�--G
�G
W
1�1
V�J
l213
Blk wall, stucco ext
2A-2ov
12_ Osw
`_2A.2ov�_u �., _
Blk wall, stucco ext
12C Osw
Blk wall, stucco ext
2A-2ov
2A-2ov
12GOsw -'
2fv
2B 2fv
11 J0, "
Blk wall, stucco ext _
0.201
0.330
0.091
_.._. ,.0.330
0.201
0 091
0.201
0.330
0.330
0 091
0 330
0 330
._.,.0 600
0.201
a
a
se
_,s6_:.
se
s
s
s
s
w
w
w
_ w
w
5.83
9.57
264
_ 9 57;
5.83
2 64
5.83
9.57
9.57
2.64
9 57
9 57
h. 17 40
5.83
4.06
23.20
221
:_ _,_8 52
4.06
V 2 21
4.06
8.52
8.66
_ 2 2f
11 58
19 08
4.06
88
0
0
0
0
7.0
0
0
0
0
0
0
0
512
155
0
0
- 0
0
0
0
�0
0
0
0
0
_
_
-
C
2A-2ov
2A-2ov
213-2fv
1613-30ad
0.330
0.330
0.330
0.032
w
w
w
9.57
9.57
9.57
,' 2'64,
0.93
21.62
21.62
19.08
1.69
0
0
0
170
0
0
0
170
0
0
0
158
0
0
0
287
22Atpl...::_ .._...'. a.
0.989
_ .._
°-_ 2868
:
.17077,4__.
77
s
,
.
6
c) AED excursion
15
Envelope loss/gain
2252
1489
12
a) Infiltration
481
135
b) Room ventilation
0
0
13
Internal gains: Occupants @ 230
0
0
Appliances/other
300
Subtotal (lines 6 to 13)
12733
1924
Less external load
0
0
Less transfer
0
0
Redistribution
0
0
14
Subtotal
2733
1924
15
Duct loads
13%
271%
366
514
Total room load
3099
2437
Air required (cfm)
134
107
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
ii.t- wrigF�tsoft- 2020-Jun-1212:00:23
CWP. Right -Suite® Universal 2019 19.0.12 RSU23828 Page 9
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
DEL -AIR Duct System Summary Job: Lot E Block 22010
Nto...
EATINc• NR CONciiIONWc Date: NOVMBER 3, 010
Entire House By: DCS
DEL -AIR HEATING AND AIR CONDITIONING
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665
For: ADAMS HOMES
8212 Amalfi Circle, Fort Pierce, FL 34951
External static pressure
Pressure losses
Available static pressure
Supply / return available pressure
Lowest friction rate
Actual air flow
Total effective length (TEL)
Heating
0.30
in H2O
0.06
in H2O
0.24
in H2O
0.120 / 0.120
in H2O
0.174
in/100ft
1167
cfm
138 ft
Cooling
0.30 in H2O
0.06 in H2O
0.24 in H2O
0.120 / 0.120 in H2O
0.174 1n/100ft
1167 cfm
Supply Branch Detail Table
Name
Design
(Btuh)
Htg
(cfm)
Clg
(cfm)
Design
FR
Diam
(in)
H x W
(in)
Duct
Matl
Actual
Ln (ft)
Ftg.Egv
Ln (ft)
Trunk
BATH 2
h 200
9
8
0.329
4.0
Ox 0
VIFx
3.0
70.0
BATH 3
h 1550
67
37
0.228
5.0
Ox 0
VIFx
20.4
85.0
st1
BR
h 2059
89
70
0.309
6.0
Ox0
VIFx
7.6
70.0
BR 3
h 1713
74
61
0.234
6.0
Ox 0
VIFx
17.5
85.0
sti
BR 4
h 3099
134
107
0.217
6.0
Ox 0
VIFx
25.4
85.0
St1
BRKFST
h 1220
53
37
0.231
6.0
Ox 0
VIFx
19.0
85.0
St1
DIN
c 2515
73
111
0.300
6.0
Ox 0
VIFx
10.0
70.0
FAM
C 5037
164
221
0.226
8.0
Ox0
VIFx
21.2
85.0
st2
KIT
c 1747
7
77
0.322
6.0
Ox0
VIFx
4.5
70.0
LIv
h 4359
188
162
0.201
8.0
Ox0
VIFx
34.3
85.0
st2
M BATH
h 1350
58
36
0.179
5.0
Ox 0
VIFx
34.0
100.0
st3
M BR
h 4702
203
173
0.174
8.0
Ox 0
VIFx
38.3
100.0
st3
UTIL
c 986
13
43
0.328
4.0
Ox 0
VIFx
3.2
70.0
We
c 51
1
2
0.216
4.0
Ox 0
VIFx
26.0
85.0
st2
wlc 1
h 783
34
18
0.176
4.0
Ox0
VIFx
36.1
100.0
st3
WIC 2
c 71
2
3
0.182
4.0
Ox 0
VIFx
32.0
100.0
st3
Supply Trunk Detail Table
Trunk
Htg
Clg
Design
Veloc
Diam
H x W
Duct
Name
Type
(cfm)
(cfm)
FR
(fpm)
(in)
(in)
Material
Trunk
st3
Peak AVF
297
230
0.174
544
10.0
0 x 0
VinlFlx
st2
st2
Peak AVF
650
616
0.174
608
14.0
0 x 0
VinlFlx
SO
Peak AVF
327
243
0.217
600
10.0
0 x 0
VinlFlx
�w Wrightsoft, 2020-Jun-1212:00:24
�M,,..•,..� a.. gym„.. Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1
...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W
Return Branch Detail Table
Name
Grille
Size (in)
Htg
(cfm)
Clg
(cfm)
TEL
(ft)
Design
FIR
Veloc
(fpm)
Diam
(in)
H x W
(in)
Stud/Joist
Opening (in)
Duct
Matl
Trunk
rbi
Ox 0
1167
1167
0
0
0
0
Ox 0
VIFx
* wrightso'ft, 2020-J un-1 2 12:00:24
I.� AM,.�• o �» . ,.. Right -Suite® Universal 2019 19.0.12 RSU23828 Page 2
..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Cale = MJ8 House faces: W
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Lot 22 Block 2 Waterstone 2265 AGL Builder Name: ADAMS HOMES
Street: 8212 Amalfi Circle Permit Office:
City, State, Zip: Fort Pierce , FL , 34951 Permit Number:
Y
U
Owner: Jurisdiction: 661000
=
Design Location: FL, ST LUCIE_CO_INTL
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in an dropped9
ceiling/soffit
/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spa
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exteriorwalls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
I
Caulking or other adhesive sealants shall not be used to fill voids
between fire snrinkler cover plates and walls or cewfings.
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
6/12/2020 12:31 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
.
FORM R405-2017
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the
residential Simulated Performance Method shall include:
❑ This checklist
❑ A Form R405 report that documents that the Proposed Design complies with Section
R405.3 of the Florida Energy Code. This form shall include a summary page
indicating home address, a -ratio and the pass or fail status along with summary
areas and types of components, whether the home was simulated as a worst -case
orientation, name and version of the compliance software tool, name of individual
completing the compliance report (one page) and an input summary checklist that can
be used for field verification (usually four pages/may be greater).
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO for the Performance Method:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 -
one page)
❑ A completed Envelope Leakage Test Report (usually one page)
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
Form R405 Duct Leakage Test Report (usually one page)
6/12/2020 12:30:03 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: 661000
Permit #:
Job Information,
Builder: ADAMS HOMES Community: Lot: NA
Address: 8212 Amalfi Circle
City: Fort Pierce State: FL Zip: 34951
Air, Leakage Test; 'ResultS Passing results must meet either the Performance; Prescriptive, or.ER1 Method"
O PRESCRIPTIVE METHOD -The building;or dwell ng.unit shall be tested and verified as.havingan airieakage rate of not,exceedihq,7 air
changes per,hour at a pressure of 0.2 inch w.g: (50 Pascals ),in Climate Zones 1 and 2 '
PERFORMANCE or.ERI MET HOD-Ttie building,or.dwelling unit shall be tested andwerified'as$having an air leakage rate.of nof,exceeding;;
the selected ACH(' value, as'shown,on Forrn 1`1405-2017 (Performance) or R406-2017 {ERI), section labeled'as infiltration, sub -section ACH50.
.ACH(50) spe6ifted on Form R405-2017-,ErieW Calc (P, ertbrmance)'or• R406-201.7(ERI): 7.000
x 60 _ 20529 — Method for calculating building volume:
CFM(50) Building Volume ACH(50)
O Retrieved from architectural plans
1-1 PASS • Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
6/12/2020 12:31:11 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
Florida Building Code, Energy Conservation, 6th Edition (2017)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: 8212 Amalfi Circle Permit Number:
Fort Pierce, FL, 34951
MANDATORY REQUIREMENTS See individual code sections for full details.
.V
SECTION R401 GENERAL
•� R401.3 Energy Performance Level (EPL) display card (Mandatory) The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
(Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD.
R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1 Building thermal enveldibm building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.
The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
R402.4.1.1 Installation The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Fj R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where
using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907.
.Fi R402.4.3 Fenestration air IeakagdNindows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per
square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tested according to NFRC 400 or
AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
Exception: Site -built windows, skylights and doors.
6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 5
MANDATORY REQUIREMENTS - (Continued)
❑R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions-
1 . Direct vent appliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
❑ R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
R403.1 Controls.
❑ R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
❑ R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or
(7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g) or (1), Florida Statutes, to be "substantially leak free" in
accordance with Section R403.3.3.
❑ R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design airflow rate when tested in accordance with ASHRAE 193.
❑ R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the
manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test.
2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the
entire system, including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the
test.
Exceptions:
1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
❑ R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
❑ R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41 °C)
or below 55'F (13°C) shall be insulated to a minimum of R-3.
❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
El accordance
Heated water circulation and temperature maintenance systems (Mandatory) Heated water circulation systems shall be in
accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2.
Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
• ❑ R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return
pipe shall be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited.
Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the
occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and
when there is no demand for hot water.
❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems
shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance
with the times when heated water is used in the occupancy.
6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5
MANDATORY REQUIREMENTS - (Continued)
❑ R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3'Y2 inches (89 mm) in the hot water distribution line and cold water line located as close as possible
to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
- R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be from 100°F to 140OF (38°C to 60°C).
.E1 R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to
electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main bumer(s) of
combustion types of service water -heating systems to be turned off.
R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed.
Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate
water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1.
❑ R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar
water -heating systems should meet the following criteria:
1. Be installed with atilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation
including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that
close when the ventilation system is not operating.
-� R403.6.1 Whole -house mechanical ventilation system fan efficacy.When installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where whole -house mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be
powered by an electronically commutated motor.
R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation
shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed. for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10
otherwise.
R403.7 Heating and cooling equipment (Mandatory).
El R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies,
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and
indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that
affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
(CFM)
MINIMUM EFFICACY a
(CFM/WATT)
AIRFLOW RATE MAXIMUIV
(CFM)
Range hoods
Any
2.8 cfm/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
<90
Bathroom, utility room
90
2.8 cfm/watt
Any
For SI: 1 cfm = 28.3 Umin. a. When tested in accordance with HVI Standard 916
6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5
r '
MANDATORY REQUIREMENTS - (Continued)
R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than 80 percent of that load.
2.
When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of
equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
❑ R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1.
❑ R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
A variable capacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
❑ C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403.
❑ R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C).
❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
shall be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operation.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
❑ R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at
the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
❑ R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal
efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously burning pilot lights.
6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5
I a s 4
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
❑ R403.11 Portable spas (Mandatoryhe energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
SECTION R404
❑ R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be
high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps.
Exception: Low -voltage lighting.
R404.1.1 Lighting equipment (Mandatory)Fuel gas lighting systems shall not have continuously burning pilot lights.
6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5