Loading...
HomeMy WebLinkAboutProject Informationr Job: Lot 22 Block 2 Watersto... DEL -AIR Manual S Compliance Report Date: NOVEMBER 3, 2010 HEATING•-AIRCOROIiIORING Entire House By: Dcs DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 euroject intormation For: ADA-MS HOMES 8212 Amalfi Circle, Fort Pierce, FL 34951 Cooling Equipment Design Conditions Outdoor design DB: 90.4°F Sensible gain: 26546 Btuh Entering coil DB: 76.3°F Outdoor design WB: 77.4°F Latent gain: 5120 Btuh Entering coil WB: 63.2°F Indoor design DB: 75.0°F Total gain: 31666 Btuh Indoor RH: 50% Estimated airflow: 1167 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: SplitASHP Manufacturer: Carrier Model: 25HBC537A0030+FX4DNF037L Actual airflow: 1167 cfm Sensible capacity: 27990 Btuh 105% of load Latent capacity: 5312 Btuh 104% of load Total capacity: 33303 Btuh 105% of load SHR: 84% Design Conditions Outdoor design DB: 41.0°F Heat loss: 27046 Btuh Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASH Manufacturer: Carrier Model: 25HBC537Ao030+FX4DNF037L Actual airflow: 1167 cfm Output capacity: 31697 Btuh 117% of load Supplemental heat required: 0 Btuh Backup equipment type: Elec strip Manufacturer: Model: Actual airflow: 1167 cfm Output capacity: 7.8 kW 99% of load Temp. rise: 21 OF Meets all requirements of ACCA Manual S. Entering coil DB: 69.6°F Capacity balance: 35 IF Economic balance: -99 OF -*- wrightsoft, 2020-Jun-1212:00:23 ��*•�• �� •wM•- �mwm Right -Suite® Universal 2019 19.0.12 RSU23828 ACCK Page 1 ..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W I ®EL -AIR Com onent Constructions Job: Lot 22 Block 2 Watersto... :ikwDate: NOVEMBER 3, 2010 NEATING�AINCONDm6ti1NG Entire House By: DCs DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL32771 Phone: 407-333-2665 Project• • n For: ADAMS HOMES 8212 Amalfi Circle, Fort Pierce, FL 34951 Location: St Lucie Co Intl, FL, US Elevation: 26 ft Latitude: 28°N Outdoor: Heating Dry bulb (OF) 41 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 90 Infiltration: 15 ( L ) Method 77 Construction quality 7.5 Fireplaces Heating Cooling 70 75 29 15 30 50 2.4 56.9 Simplified Average 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' BtuhW °F ftMF/Btuh BluhV Btu BtuhM Btu Walls 12C-Osw: Frm wall, stucco ext, 3/8" wood shth, r-13 cav ins, 1/2" gypsum board int fnsh, 2"x4" wood frm, 16" o.c. stud Blk wall, stucco ext, r-4 ext bd ins, 8" thk, 1/2" gypsum board int fnsh Partitions 12C-Osw: Frm wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board int fnsh, 2"x4" wood frm, 16" o.c. stud n 63 0.091 13.0 2.64 167 2.21 140 e 124 0.091 13.0 2.64 328 2.21 275 se 26 0.091 13.0 2.64 68 2.21 57 s 38 0.091 13.0 2.64 101 2.21 85 w 12 0.091 13.0 2.64 30 2.21 26 all 263 0.091 13.0 2.64 694 2.21 582 n 354 0.201 4.1 5.83 2061 4.06 1436 e 252 0.201 4.1 5.83 1471 4.06 1025 se 4 0.201 4.1 5.83 25 4.06 17 s 376 0.201 4.1 5.83 2192 4.06 1527 w 207 0.201 4.1 5.83 1209 4.06 842 all 1194 0.201 4.1 5.83 6958 4.06 4847 242 0.091 13.0 2.64 639 1.31 317 Windows 10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, n 1/8" thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 23 ft overhang (6.7 ft window ht, 0.75 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, n 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1 ft e overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht s all 10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, e 1/8" thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 9.33 ft overhang (6.7 ft window ht, 0.75 ft sep.); 6.67 ft head ht 18 0.550 0 16.0 285 12.6 226 32 0.330 0 9.57 310 8.52 276 49 0.330 0 9.57 465 23.2 1127 16 0.330 0 9.57 155 8.66 140 97 0.330 0 9.57 929 15.9 1543 18 0.550 0 16.0 285 12.6 226 " 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, a 17 0.330 0 9.57 160 8.52 142 ' 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 6.67 ft overhang (5 ft window ht, 0.33 ft sep.); 6.67 ft head ht " Wri-ghtsoft® 2020-J un-1 2 12:00:23 % �M,.t•, ww..,<.mw., Right -Suite@ Universal 2019 19.0.12 RSU23828 Page 1 ACC..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W ( Y 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, a 30 0.330 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 9.33 ft overhang (5 ft window ht, 0.33 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, se 13 0.330 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 11 ft overhang (5 ft window ht, 0.33 ft sep.); 6.67 ft head ht 10C-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, s 16 0.550 1/8" thk; NFRC rated (SHGC=0.70); 50% drapes, medium; 23 ft overhang (6.75 ft window ht, 0.75 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, s 10 0.330 1/8" thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1 ft overhang (3.17 ft window ht, 0.83 ft sep.); 6.67 ft head ht 213-2fv: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, w 7 0.330 1/8" thk; NFRC rated (SHGC=0.31); 7.67 ft overhang (1.33 ft window ht, 0.5 ft sep.); 6.67 ft head ht 2B-2fv: 2 glazing, clr low-e outr; air gas, vnl frm mat, clr innr, 1/4" gap, w 7 0.330 1/8" thk; NFRC rated (SHGC=0.31); 50% drapes, medium; 7.67 ft overhang (6.7 ft window ht, 2.83 ft sep.); 6.67 ft head ht w 7 0.330 all 13 0.330 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, w 32 0.330 1/8" thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1 ft overhang (5.25 ft window ht, 0.83 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, w 39 0.330 1/8" thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1 ft overhang (6.25 ft window ht, 2.83 ft sep.); 6.67 ft head ht Doors 11JO: Door, mtl fbrgl type w 20 0.600 Ceilings 16B-30ad:Attic ceiling, asphalt shingles roof mat, r-30 ceil ins, 1/2" 2322 0.032 gypsum board int fnsh Floors 22A-tpl: Bg floor, light dry soil, on grade depth 202 0.989 0 9.57 287 8.52 256 0 9.57 120 8.52 107 0 16.0 251 12.6 199 0 9.57 93 8.52 83 0 9.57 64 11.6 77 0 9.57 64 19.1 128 0 9.57 64 19.1 128 0 9.57 128 19.1 256 0 9.57 310 21.6 700 0 9.57 369 21.6 833 6.3 17.4 350 17.6 353 30.0 0.93 2154 1.69 3922 0 28.7 5798 0 0 W rightsOft" 2020-Jun-12 12:00:23 Right-Suite@ Universal 2019 19.0.12 RSU23828 Page 2 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W h Pro ect Summar Job: Lot 22 Block 2 Watersto... DEL -AIR Date: NOVEMBER 3, 2010 NEONG'4.mn ooNDmoNWo Entire House By: Dcs DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 For: ADAMS HOMES 8212 Amalfi Circle, Fort Pierce, FL 34951 Notes: HA update 5/14/14 RVSD 8-20-15 JA L.S 8-11-16 JTW L.S 8-16-16 JTW Desian Information Weather: St Lucie Co Intl, FL, US Winter Design Conditions Summer Design Conditions Outside db 41 OF Inside db 70 OF Design TD 29 OF Heating Summary Structure 23850 Btuh Ducts 3196 Btuh Central vent (0 cfm) 0 Btuh (gong) Humidification 0 Btuh Piping 0 Btuh Equipment load 27046 Btuh Infiltration Method Construction quality Fireplaces Simplified Average 0 Heatin Coolingg Area (ftz) 228q 2281 Volume (ft3) 20789 20789 Air changes/hour 0.36 0.19 Equiv. AVF (cfm) 125 66 Heating Equipment Summary Make Carrier Trade CARRIER Model 25H BC537AO030 AHRI ref 10487322 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat Capacity balance point = 35 OF Backup: 8.5 HSPF 34600 Btuh @ 47°F 27 OF 1167 cfm 0.043 cfm/Btuh 0.30 in H2O Input = 8 kW, Output = 26641 Btuh, 100 AFUE Outside db 90 OF Inside db 75 OF Design TD 15 OF Daily range L Relative humidity 50 % Moisture difference 57 gr/lb Sensible Cooling Equipment Load Sizing Structure 20952 Btuh Ducts 5594 Btuh Central vent (0 cfm) 0 Btuh (none) Blower 0 Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Equipment sensible load 26546 Btuh Latent Cooling Equipment Load Sizing Structure 3544 Btuh Ducts 1576 Btuh Central vent (0 cfm) 0 Btuh (none) Equipment latent load 5120 Btuh Equipment Total Load (Sen+Lat) 31666 Btuh Req. total capacity at 0.75 SHR 2.9 ton Cooling Equipment Summary Make Carrier Trade CARRIER Cond 25HBC537AO030 Coil FX4DNF037L AHRI ref 10487322 Efficiency 12.5 EER, 15.5 SEER Sensible cooling 26250 Btuh Latent cooling 8750 Btuh Total cooling 35000 Btuh Actual air flow 1167 cfm Air flow factor 0.044 cfm/Btuh Static pressure 0.30 in H2O Load sensible heat ratio 0.84 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wr.R!�oft- 2020-Jun-1212:00:23. A w^-•.� Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1 ..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W DEL -AIR Right-J® Worksheet Iffma• wa coNamaNara Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name Entire House M BR 2 Exposed wall 202.2 It 40.0 ft 3 Room height 9.0 ft d 8.0 It heat/cool 4 5 Room dimensions Room area 2321.5 ftz 1.0 x 268.0 ft 268.0 ft2 Ty Construction U-value Or HTM Area (ftz) Load Area (ftz) Load number (Btuh/W-°F) (Btuh/ftz) or perimeter (ft) (Muh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 . - 12GOsw Blk wall, stucco ext 0 091 550 0.201 n ' Rom; n 2 64; �., 15 95; 5.83 2 21 _. �12 64 4.06 ' '81 : 18 386 63 0 354 140 67 , _s285 2061 1___. __. _ 226 1436 '- . 81 � 18 0 63 _:__0 0 '16Z ; 285 0 140 __ 226. 0 Vy 1 1 2A-2ov 12C Osw 10C v 2A 2ov 2A 2ovu 0.330 0 091 0 550 0 330 0.33.0 n- a a e __?,.._ 9.57 2.64 15 95 9.51 8 57 8.52 2 2T 12 64 6 52 32 189 18 = 17 __, 0 124 18 17 310 328 285 160 276 275 226 142 0____ 0 0 0 0 �,_ 0 0 0 0 Q -_ - 0 0 0 0 W _ _ 0. 0 0 0 0 _. _ 0, -a t-G W "w�..._G..�10C_v__..w�_-_..__:,:_ V)J Blk wall, stucco ext 2A-2ov 12C Osw 2Q 2ov _ Blk wall, stucco ext 12C Osw Blk wall, stucco ext 0.201 0.330 0.091 n_ w0,330 0.201 0 091 __.,___.0;550 0.201 a a se se se 5.83 9.57 2 64' 5.83 2 64' �,.�. 1598. 5.83 4.06 23.20 2 21' 4.06 2 21 °�.�1264:•_...____1,6 4.06 301 49 38 � „._5 4 54 402 252 0 1 26 ____13 4 38 ,__..__16 376 1471 465 68 _.__.."_120 25 101 _ �_�;�2b1 2192-1527 1025 1127 w 57 _..., 102 17 85 199,_�:_,:__�. 120 32 0 ._.._:_ _0 0 0 0�'..___t_0 88 0 0 ­_0 0 0 0 511 310 _ 0. 0 _ ` 0 " .0 356 751 0 0 0, ,_:_�0. s . - s s 128 128 746 520 2A-2ov 2A-2ov 12GOsw B 2fv 8- 26 2fv 0.330 0.330 0 091 O',330 0 330 s s w w . w 9.57 9.57 9 57 9 57 8.52 8.66 2 21 t 11 58 19 08 10 16 A5 7 = 7 10 14 1230. 7 x.4 93 155 64 64 83 140 26 77 128 0 0 0 0 0 0 0 0 0 0 0 0 0 .0 0, 0 D 11J0 Blk wall, stucco ext _ _0 600 0.201 _w w -, 1740, 5.83 17 58 4.06 •-- z_20 285 _ ro_20 207 1209 842 __., 0 0 0 0 C 2A-2ov 2A-2ov 2B-2fv 1613-30ad :...._-_:_. 0.330 0.330 0.330 _ 91 0.032 0 989 w w w 7­7 ._k.`1_.:: 9.57 9.57 _ 9.57 ? 64; 0.93 __ 28.68' 21.62 21.62 19.08 a�__0 1.69 � �._-0 00 32 39 7 _ __. 2322 ,�_ ,2322 0 0 4 2322 202 310 369 64 2154 5798 700 833 128 3922 -_..,_. 0 0 0 _ 0 0 0 0 268 0 0 0 249 0 0 0 268 V _ .268 453 - - -.- --_.. n_ f - _ N w 6 c) AED excursion 119 -79 Envelope loss/gain 19875 14788 3414 2366 12 a) Infiltration 3975 1114 733 205 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants Qa 230 5 1150 1 230 Appliances/other 3900 1 1300 Subtotal (lines 6 to 13) 23850 20952 4147 3101 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 23850 20952 4147 3101 15 Duct loads 13% 271/6 3196 5594 13% 27% 556 828 Total room load 27046 26546 4702 3929 Air required (cfm) 1167 1167 203 173 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -➢'�- wr➢gtstsoR- 2020-Jun-1212:00:23 Aft Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W DEL AIR Right-M Worksheet m"°a-MCOM°OOM Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name WIC WIC 2 Exposed wall 7.0 ft 0 ft 3 Room height 8.0 ft heat/cool 8.0 ft heat/cool 4 5 Room dimensions Room area 6.0 x 7.0 ft 42.0 ftz 5.0 x 7.0 ft 35.0 ftz Ty Construction U-value Or HTM Area (ftz) Load Area (ftz) Load number (Btuh/ftZ°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat I Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12GOsw Blk wall, stucco ext 0.091 0.201 ri -_n. n 2 64 15 95: 5.83 - 2 21; 1264 4.06 0 0 0 0 0 0 0 0 0 0 0 0 tW „w. 0 _ ,.--0 0 0 11 --G, G 2A-2ov 12C-0sw 10C v 2A 2ov 0,.330 0:091 0.550 01330 _ZJO 330 n e, a e, _.e _ 9.57 2 64 15.95 957 9 5.7_ F T - 57 8.52 ' 2 21 12 64 8.52 4,z 8,52 0 ' 0 0 0 Po - 0 _ _ 0 .0 0 0 ~~T� 0 0 0 0 0 m0 _ 0 ° 0 0 0 0 0 0 0 M" 0 7 0 0 0 a � 0 " 0 0 0 •_.__0 _ _�0 0 0 0 1�l �G W V►! µ Blk wall, stucco. ext 2A-2ov 2A 2ov Blk wall, stucco ext 12C-0sw� w 0.201 0.330 e a 9.57 4.06 23.20 0 0 ' 0 .. ..:0 0 0 0 0?0 0 0 �326 0 0 0 0 �227 t) 0 0 0 Y _ 0 0 0 0 0 0 0 _-- 0 =Q o 0 0 0 - -- --0 0.201 0.091 550 se s:, s_' 2. 9.57 5.83 2 64 . 15 9,5: 4.06 Y 2 21 z12.64 Blk wall, stucco ext 2A-2ov 2A-2ov 12C 0sw 26 2fv 2B 2fv :` Blk wall, stucco ext 0.201 0.330 0.330 0,091 0.330 0:330 0600 0.201 s s s w w, w w w 5.83 9.57 9.57 2 64 ,; 9 57 9 57' ; ?_7.:40 5.83 4.06 8.52 8.66 2 21 11 58 19 08 _�17.58.� 4.06 56 0 0 4 0 0 _0 0 56 0 0 _ 0 0 0 _J___A 0 0 0 �0 0 0 Y � 0.�._ 0 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0'' 0 0 0 0 0 0 0 0 0 0 0 C 2A-2ov 2A-2ov 2B-2fv 16B-30ad 0.330 0.330 0.330 0.032 ___,.,_0.989 w w w __-- 9.57 9.57 9.57 0.93 . _28.68 21.62 21.62 19.08 1.69 _ 0.00 0 0 0 42 -- -;._ 42 0 0 0 42 . ____ : 7 0 0 0 39 �__. 204 0 0 0 0 0 0 35 0 0 0 _,.:._�_0 35 0 0 0 .���_ 0 0 0 59 71 __0 32 _ - .w.r _. - - .__.,w_ - .,,. wM_ _..ram. ..,........i.:......,._ L _,.. a7�L .. ..� ,._.-.... .... ......w.....-r-. ...,._.��._. .�.._._ ,_%.._ 1:.__..__�_ ....._.�.... ,.....__. __ -... .,_.u,,..-._.......-_....a...1u,......s. -...o.».w ...._... u....L -...x.,...u.,.we .. ..«.. ........v._ -.. ..«...-. w-h-s «-.._... _,..... ,..._.._....- 6 c) AED excursion -19 -3 Envelope loss/gain 566 280 32 56 12 a) Infiltration 125 35 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants Qa 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 691 315 32 56 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 691 315 32 56 15 Duct loads 13% 27% 93 84 13% 27% 4 15 Total room load 783 399 37 71 Air required (cfm) 341 18 2 3 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 44 - 2020-Jun-1212:00:23 C� ^""." Right -Suite® Universal 2019 19.0.12 RSU23828 Page 2 ...aterstone2265AGL\Lot228lk2Waterstone2265AGL.rup Calc = MJ8 House faces: W WDEL,AIR Right-M Worksheet KMG- CONnmoNma Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name M BATH WC 2 Exposed wall 11.0 ft 0 ft 3 Room height 8.0 It heat/cool 8.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x 140.0 ft 140.0 ft2 1.0 x 25.0 ft 25.0 ft2 Ty Construction number U-value (Btuh/ft2-OF) Or HTM (Btuh/ft2) Area (ft2) or perimeter (ft) Load (Btuh) Area (ft2) or perimeter (ft) Load (Btuh) Heat TC001 Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 .' 12C Osw �10C_v" �„ �0091 �0 550 n-;, __n . 264 _ 15:95. 221,7-77 _ .12 64 `0 w -0 _ 0 0 0 " " 00 - 0 • --,A ' �0 A Blk wall, stucco ext 0,201 n 5.83 4.06 0 0 0 0 0 0 0 0 11 r . 2A 2ov 12COsw 10C v 2A 2ov 2A 2ov ,_ _ 0.330 0091 0.550 0.330 _n0 330 n. e° a e e _ 9.57 264 15.95 '9.57 . , ' 99 57 8 52 221' 12.64 8.52 , - 8 5.2 0 0 0 0 -.. _ __5 0 0 0 0 ._.. 0 0 0 0 011 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 10 0; 0 V►/ -G W Blk wall, stucco ext 2A-20v 12C-Osw _ Bik wall, stucco ext Y 12C Osw ,� 0.201 0.330 O'091 _.. 0.330 0.201 0 091 0 550 a a w_. se . _se_ se s ._s-..: 5.83 . 9.57 2:64 .. _-9.57.._._._._.,_0 5.83 2 64` -15 95. 4.06 23.20 2 21 4.06 E!' --12 64 0 0 D 0 -0 , 9 0 0 0 0 0 _ . 0 0 0 0 0 .... -_0 0 0 0 A _ R 0 0 0 0 0 :� 0 0 0_ 0 0 _. 0 0 0 . u ._ q 0 y 0 _ - 0 0 -0 _ ...- . Q. 0 0' LL --GG D Blk wall, stucco ext' 2A-2ov 2A-2ov 120Osw 2B 2fv 2B 2fv 1]JO _ �._<' Blk wall, stucco ext 0.201 0.330 0.330 0.091 0 330 0 330 _ _ ...0`600 0.201 s s s w w, w . W . w 5.83 9.57 9.57 2 64 9.157 9.57 1,7, 40. 5.83 4.06 8.52 8.66 2 2t 11 58 19.08 .�17 @8� 4.06 88 10 0 " 0 . 0 0 : _ _ _ 9 0 78 10 0 0 0 0 _4_ w Q 0 456 93 0 0 0 0 �_ :. 0 0 318 83 0 0 0 0 .. a _ 0 0 0 0 0 0 0 0 _ f-Ljo 0- 0 0 0 0 0 0 ° -o 0 0 0 0 0_ 0 0 - 0 0 0 0 0 0 0 0' 0 _ C 2A-2ov 2A-2ov 2B-2fv 16B-30ad 0.330 0.330 0.330 0.032 _ w w w 9.57 9.57 9.57 0.93 _ .._28,68 21.62 21.62 19.08 . 1.69 _.000 0 0 0 140 W r _..]40 0 0 0 140 .; u_,1] 0 0 0 0 0 0 237 0 0 0 25 - - 0 0 0 25 • - 0 0 0 0 23 0 0 0 42 - 0 130 _ 315 ._._.-...ham � .,s...._ �.t ......_...�.. ,.._..._.,.,.ti. _,.._4.: .._... ..............c:,tix a_._....�,... _,_.......` �.aa.._.. .._...w..�_.. .�.t......_ _......._..-» -..-._._....._ 6 c) AED excursion -39 -2 Envelope loss/gain 995 599 23 40 12 a) Infiltration 196 55 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1191 654 23 40 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1191 654 23 40 151 Duct loads 13% 27% 160 175 13% 27% 3 11 Total room load 1350 828 26 51 Air required (cfm) 1 58 36 1 2 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -rid- 2020-Jun-1212:00:23 Right -Suite® Universal 2019 19.0.12 RSU23828 Page 3 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W RDEL--AIR Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name LIV FAM 2 Exposed wall 32.0 ft 24.0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heat/cool 4 5 Room dimensions Room area 15.0 x 12.0 ft 180.0 ft2 1.0 x 511.5 ft 511.5 ft2 Ty Construction U-value Or HTM Area (ftz) Load Area (ft2) Load number (Btuh/ftz°F) (Btuh/ftz) or perimeter (ft) (I3tuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 =. VI/ 12C Osw -: - _10C_v Blk wall, stucco ext 0.091 -__-0.550 0.201 n _n . n 2 64` 15 95 5.83 2 21. _�12 64 4.06 t) : __�. 0 t 0 '_-0L-G 50 0 291 0 203 �; 6 0 0 0 "0� 0 0 -U 0 50 11 -G `. W,�-G f-- ( L_-_C.. 2A-2ov 12C 0sw 10Gv 2ov .2ov . _.._ 0.330 0,091 0.550 0 330 _._0.330 n_ e, a e _.,ew 9.57 r 2 64 15.95 9 57 _9 57 8.52 2 2i ' 12 64 8 52 ;.,. )3.52_287 0 ; 0 : 0 .' 0 .0 �' 0 0 0 0 0 0 0 6 0 0 0 0 144 18 0 0 ­' � 96 18 0 0 ' 254` 285: 0 0 226 0 _. 256 yJ T-G Blk wall, stucco ext 2A-2ov 1 0.201 0.330 a a 5.83 9.57 4.06 23.20 0 0 0 0 0 0 0 0 16 0 16 0 93 0 65 0 22GOsw� 21, 0 _ O _ 0 _ ..26 W Vj/ 2av _ _ ..._. Blk wall, stucco ext 12C-0sw -' _ _. , 0 330 0.201 0:091 _ se,_ se M- _9 57 5.83 _._8 52 4.06 _ _.__. Q 0 0 _0 ___:_0 0 0 -0 0 0 .__._ _0 0 0_' 0 0 _0 `. 0 ­0. 0 0 0 0 Blk wall, stucco ext 2A-2ov 2A-2ov 0.201 0.330 0.330 0 091 0 330 0.330 00 0.201 s s s w w w ._ w w 5.83 9.57 9.57 2 64 9 57 9 57 _. 17 40: 5.83 4.06 8.52 8.66 2 21 11 58 19.08 _ 17 58 4.06 120 0 16 0 ` 0 0 , _._ 0 150 104 0 14 0 0 0 _ ` Q 118 605 0 155 0 0 0 __ __a O 686 421 0 140 0 0 0 .-_ _: __. 0 478 0 0 0 45 7 7 _. 20 35 0 0 0 0 0 0 30 64 64 165 0 0 0 rn'26, 77, 128 115 12C 0sw 26 2fv 26 2fv Blk wall, stucco ext 12 7 4•- . _ 20 28 - C F 2A-2ov 2A-2ov 213-2fv 1613-30ad - - 22A_tpl __ :..... 0.330 0.330 0.330 _ 0.091 _ ._ 0.032 ...____0.989 w w w _ = _ _- 9.57 9.57 9.57 °--2 64 0.93 _ 28 68 21.62 21.62 19.08 _.__ 1.31; 1.69 .r . _..._0 00 32 0 0 _ _ ;0 180 - ---- 180 0 0 0 _ _ 0 180 _ .�...,:32 310 0 0 __ _. 0 167 ` _� a.... �918 700 0 0 t _ _ 0 - 304 _ _ __ 0 0 0 7 _ : :_ 0 -- 512 _. ._512 0 0 4 512 .._s __24 0 -0 64 0 475 ._ _...-- _ :� .._688 0 0 128 - -0 864 Y s .r.. M,.w, ._...r_ �_... .-.. - -: i- 6 c) AED excursion 167 86 Envelope loss/gain 3132 2414 2819 2536 12 a) Infiltration 712 200 534 150 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants Qa 230 0 0 3 690 Appliances/other 300 600 Subtotal (lines 6 to 13) 3844 2913 3354 3976 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 3844 2913 3354 3976 15 Duct loads 13% 27% 515 778 13 % 27 % 449 1062 Total room load 4359 3691 3803 5037 Air required (cfm) 188 1621 164 221 Calculations approved bV ACCA to meet all requirements of Manual J Sth Ed. -PW 2020-Jun-1212:00:23 C Right -Suite® Universal 2019 19.0.12 RSU23828 Page 4 ...aterstone2265AGLLot22Blk2Waterstone2265AGL.rup Cato = MJ8 House faces: W DEL: AIR Right-J® Worksheet IQAMM- AM CONDMOPoNO Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name DIN UTIL 2 Exposed wall 11.0 It 0 ft 3 Room height 10.0 It heat/cool 8.0 ft heat/cool 4 5 Room dimensions Room area 11.0 x 11.0 ft 121.0 ftz 7.0 x 11.0 ft 77.0 ftz Ty Construction U-value Or HTM Area (ft2) Load Area (W) Load number (Btuh/ftZ°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 12C Osw Blk wall, stucco ext - 0091 _ _,0 550 0.201 n; _ n n 2 64 ' . 15 95 5.83 2 21 _8.04 4.06 :0 ! _ __• 0 0 0 - - 0 0 0 - Q 0 ._w��_0 0 0 0 0 _ 0 0 U � (t: 0 n0 0 1 1 -G 2A-2ov 12C Osw .;: 10Gv 2A 2ov 0.330 0 091 0 550 0.330 ,_ ,. 0 330 n a a e e 9.57 2 64' 15.95 9.57 9 57 8.52 2 2i 12.64 8.52 ._ w 8,52 0 0 0 0 0 ~0 0 0 , 0 0 0 0 0 0 0 0 0 0 0 0 y 0 _ 0 0 0 0 0 r 0 0 T 0 0 0 0 0 0 0 0 0 0 6 _.._... __0 0 t-G Blk wall, stucco ext 2A-2ov 2av--_v.. Blk wall, stucco ext 12GOsw` _10Gv __.. _ _ 0.201 0.330 0.091 .__..�.0330 0.201 0.091 .:. O 550 a a se _sg se s-'` _ s,._ 5,83 9.57 - 2:64 �_9.57 5.83 2 64 _ _ 15 95. 4.06 23.20 2.21' . 8,52 4.06 ; 2 21 12 64 0 :0 -. _ .:a._ Q 0 0 :. _�0 0 0 � 0 0 0 0 ____.. Q 0 0 0 ..__. _d0 0 0 ___ .v_,D 0 0 --� 0 _ __. 0 0 0 0 . _0 0 0 0 0 ~' 0 _._ 0. 0 6 0 0 6 :0. 0 a) .'----0- w!-G::2A W VV��/I • 0 0 0 0 0 0 0 0 0 0 0 0 0' 0 0 0 0 0 �- D 0 0 0 II----GG _D- Blk wall, stucco ext 2A-20v 2A-2ov 12C Osw `� 2B 2fv 2B 2fv 11J0-_ _ .__:. Blk wall, stucco ext 0.201 0.330 0.330 0 091 0 330 0 330 __.__.0600 0.201 s s s w� w w w. w 5.83 9.57 9.57 2 64 9 57 9 57 1740'.� 5.83 4.06 8.52 8.66 2 21 11.58 19 08 1758 4.06 10 0 0 _____ 0 0 0 _. `0 100 10 0 0 � 0 0 0 .0 61 58 0 0 0 0 0 _ __0 358 41 0 � 0 0 0 0 0 0 0 0 0 ~~� 0 250 2A-2ov 2A-2ov 2B-2fv 0.330 0.330 0.330 w w w 9.57 9.57 9.57 a:._. 21.62 21.62 19.08 _.J 31, 0 39 0 J.O 0 0 0 ._.z�.. 10 0 369 0 ___j6 0 833 0 13 0 0 0 v 72 0 0 0 ... _ _72 0 0 0 0 0 0 C 166-30ad 0.032 - 0.93 1.69 121 121 112 204 77 77 71 130 :F„„ r 22A tph. ._m _.. _ , . _0,989 _. __28.68, -__.0 00 _ _ :121 .: _ ,.,p11 _ ._ _ 315 __-T_0 _R __ ___ __ - 0 _ _ _ ._. ...,w....a..... _„.t.._.x �««.... «,..... ...-.....z .,...�-».. ,.........,.i ..3.....s. �.._. ,:A+.._d_w ..a, 77 ....,.o, 1ex..:.__,u-e.._._. ,..._.._.,._,.. 6 c) AED excursion 346 -46 Envelope loss/gain 1240 1687 261 179 12 a) Infiltration 245 69 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants Qa 230 1 230 0 0 Appliances/other 0 600 Subtotal (lines 6 to 13) 1484 1985 261 779 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1484 1985 261 779 15 Duct loads 13% 27% 199 530 13% 27%1 35 208 Total room load 1683 2515 297 986 Air required (cfm) 73 111 13 43 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -4*- 2020-J un-1 2 12:00:23 C� Right -Suite® Universal 2019 19.0.12 RSU23828 Page 5 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W WDEL--AIR Right-JO Worksheet armwc•aMcommawaa Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name BATH 2 BR 2 2 Exposed wall 0 ft 14.0 ft 3 Room height 8.0 ft heat/cool 8.0 It heat/cool 4 5 Room dimensions Room area 6.0 x 9.0 It 54.0 ft2 12.0 x 14.0 ft 168.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftZ°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat TC001 Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 `. W 12C Osw o ;10C_v_ Blk wall, stucco ext 0 091 0 550 0.201 n m __0 n 2 64' 5.83 2 21" 4.06 0 _ _._-.__0 0 _ 0 0 112 __ __,__0 96 :=______LQ 558 389 0 11 -G WE i _... V)J I-G !- G:.2A.2oy W V�/ 2A-2ov -120Osw 10C v 2ov 2A-2ov _.W._ _. _ Blk wall, stucco ext 2A-2ov 12C Osw _ _ Blk wall, stucco ext 12G Osw - 0.330 0.091 0 550 O'330 ._ Q_330 0.201 0.330 O'091 a.._.._,0 330 0.201 0:091 Y�-0_.550 n a ..° a e e._ a a se se_ se s ' __ s.a 9.57 -7� 2 64: 15 95 9 57 _ - 8 57 5.83 9.57 - 2 64 _.9 57, 5.83 LL _ 15.95..� 8.52 °" 2 21 12 64 8 52 ._:.8.52 4.06 ... 23.20 2 21 _ _852 4.06 12..64 0 i < d p 0 0 ;j 0 0 0 • _:._.w:0 0 _.- �. 9 .0 ` p 0 0 0 0 0 _., __ _0 0 _ ____- 0 0 0 0 0 0 0 _ 0 __ _� :0 0 __-_____._0 0 7777 0 0 0 0 0 0 0 16 7 -70 0 0 0 0 0 0 __ ,0 0 0I2A 0 0 0 ____-_,.0 0 6 _ _0 155 0 0 0 0 0 ., p, _� _0 138 0 0 0 _ 0 0 o ___�__ 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 TABlk wall, stucco ext 2A-2ov 2A-2ov 12C Osw 2B 2fv 2B 2fv Blk wall, stucco ext 0.201 0.330 0.330 6.091 0 $30 0 330 0.201 s s s w- w w w 5.83 9.57 9.57 2 64 9 57 9 57 5.83 4.06 8.52 8.66 2 2f 11 58 19 08 4.06 0 0 0 ' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 0 C 2A-2ov 2A-2ov 2B-2fv 1613-30ad :22A=tpl _. - ..:_�...:0.989 0.330 0.330 0.330 0.032 w w w 9.57 9.57 9.57 0.93 , . 28.68 777 21.62 21.62 19.08 1.69 ., _0.00 0 0 0 __..48 54 ` __,,,.54 - v0 0 0 _w48 54 . _ �._ 0 0 0 0 _.. �_.127, 50 0 0 0 0 ..�63 91 _ -.Y^ _ .0 0 0 0 . �v 112 168 _ _......_ ]68 0 0 0 _. �112_296. 168 - 0 0 _ 0 156 0 0 0 284 - ___. 71212 6 c) AED excursion -9 -74 Envelope loss/gain 177 146 1566 884 12 a) Infiltration 0 0 249 70 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 300 Subtotal (lines 6 to 13) 177 146 1816 1254 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 D 0 0 14 Subtotal 177 146 1816 1254 15 Duct loads 13% 27% 24 39 13% 27% 243 335 Total room load 200 184 2059 1588 Air required (cfm) 91 81 89 70 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -r.1- 2020-J un-1 2 12:00:23 Right -Suite® Universal 2019 19.0.12 RSU23828 Page 6 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W !�QEL,AIR Right-M Worksheet ago • wa coxnmorm+o Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name 13113 KIT 2 Exposed wall 14.0 ft 0 ft 3 Room height 8.0 It heat/cool 10.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x 158.0 ft 158.0 ftz 1.0 x 154.0 ft 154.0 ftz Ty Construction U-value Or HTM Area (ft2) Load Area (ftz) Load number (Btuh/ftZ°F) (Btuh/ft) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6' 12C Osw 0:091 m," 2 64 2 21; j 0 0 0 0 o 0 _. __0 0' ._0 0' :0 W Blk wall, stucco ext 0.201 n 5.83 4.06 112 96 558 389 0 0 0 0 I-G _.___ ... 2A-2ov 10C v 2A 2ov 2A 2ov ___. 0.330 0;091 6.550 0330 0,330 n e a e .. a 9.57 2 64, 15 95 9 57 .._ 9 57_ 8.52 2 21'; 12 64 8 52 8 52 16 0 0 0 .. _ .__.0 0 0 0 0 _..___ 0 155 0 0 0 _._ w._.0 138 07 0 0-, _ _.,0 0 0 0 0 ".._, ___.0 0 ez 0 0 0 . , __ :0 0 7 Q 0 0 0 0 0 0 y/ L-G . Blk wall, stucco ext 2A-2ov i2C Osw 2A 2ovr� z : _.y_._. 0.201 0.330 0.091 _.. 0:330 a a .: se se 5.83 9.57 264 _ 9 57.._ 4.06 23.20 . 2 21 0 0 ' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' 0 0 0 - 0 _ 0 0 s r0 W V\��JJ Blk wall, stucco ext 12C Osw 0.201 se _.. - s 5.83 2 fi4. 4.06 221 0 0 0 0 0 . 0 0 ., _.0 0 : 0 0 0 V)J Blk wall, stucco ext 0.201 s 5.83 4.06 0 0 0 0 0 0__._ 0 0 II-(G VVV►►►111 (L-G VhBlk 2A-2ov 2A-2ov 12C Osw 2B 2fv 2B 2fv wall, stucco ext 0.330 0.330 0 091 0 330 0 330 0.60A 0.201 s s w w w _ W . w 9.57 9.57 w 2 64 9 57 9 57 �_ 1,740 5.83 8.52 8.66 i 2 2f 11 58 19 08 ` 175.8 4.06 0 0 ' 0 0 ' Q -- .._ .0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "� 0 0 0 _Q 0 0 0 0 0 0 _� _ 0.��__�0 0 0 0 .0 0' 0 0 0 0 0 0 0 0 2A-2ov 2A-2ov 213-2fv 12 cosw__._; 0.330 0.330 0.330 w w w 9.57 9.57 9.57 21.62 21.62 19.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 1613-30ad 0.93 1.69 158 158 147 267 154 154 143 260 _0.032 __-0. 989 _ :_28.68. ry __,0.00 _.y __158 _..__.._ 1¢ __ 402 .a0 _ __. a 154 _-0 _ 0 .:_ _ .._. 0 .. ._77Vyr- .. ..., p., ....... . .. .,....e.,.. ...Y.._.._..ee�.::_........_a._. Yr..,.,.».v- ,.. wtw,..:.. Fk .«w... 13a....4.... -. ..z.....,.. ._.,._..._ ......»_.._... w.......u�. ...._.c._._.....,. ..�.�.»._... ..w._...,..._. 6 c) AED excursion -65 -81 Envelope loss/gain 1262 729 143 179 12 a) Infiltration 249 70 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 300 1200 Subtotal (lines 6 to 13) 1511 1099 143 1379 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1511 1099 143 1379 15 Duct loads 13% 27% 202 293 13% 27% 19 368 Total room load 1713 1392 162 1747 Air required (cfm) 1 174 61 17 77 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrogtitso4ft- 2020-Jun-1212:00:23 e� "' ^"`"""• Right -Suite® Universal 2019 19.0.12 RSU23828 Page 7 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W DEL -AIR Right-J® Worksheet fg9T IG•amcodam0MN0 Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name BRKFST BATH 3 2 Exposed wall 9.2 ft 13.0 It 3 Room height 10.0 ft heat/cool 8.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x .142.0 It 142.0 ftz 1.0 x 76.0 ft 76.0 ftz Ty Construction number U-value (Btuh/ftz°F) Or HTM (BtutVftz) Area (ftz) or perimeter (ft) Load (Btuh) Area (ft2) or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 G. W 12C Osw ' 10C_v _ Blk wall, stucco ext 0-091 0.201 n ". n 2 64` 5.83 2 21' �_.12 64 4.06 0 ..__._�._0 0 0 _ 0 0 _ 00 0 0 0 0 0 0 0 1 1 -G ' _ 2A 2ov '12C Osw 10C v ri 2A 2ov 2A_2ov . __,_ 0.330 Ow091 O.550 0.330 n 8 a e • 9.57 V 2 64' 15 95 9.57 _.9 57 8.52 r 2 21 12 64 8.52 ..._ _. 8.52 0 49 0 17 ...._ . __ '.O 0 J>'28 0 •17 ,». _.___ 9 0 7568 0 160 __, 0 0 A 142 ..n.__ 0 0 ' 0 0 _ 0 . 0 0 0 p 0 0 0 `V ,- 0'? 0 "0 0 0 0 0 V►/ I-G y/ W Blk wall, stucco ext 2A-2ov 12C 0sw -^ 2ov__ K... Blk wall, stucco ext 12C Osw 10C v _ - ._ 0.201 0.330 6:091 _...__0:330 0.201 0091 0;550 a a se _,se,_ se s ._s. 5.83 9.57 2 64 __.9.57 5.83 2 64 _ 15 95::.,_ 4.06 23.20 2.21 . 8:52, 4.06 ; 2 2f _12 0,4 5 0 38 _._. 13 4 0 . _ _-_0 5 0 26 13 4 0 ..0 29 0 w68 _ _. _r120 25 -" 0 .-._-.-- 20 0 �^ 57 ._ 1.07 17 - 0 56 0 0 �.._ 0 0 54 16 56 0 6 - .0 0 38 -__ .__16 227 0 0 __.._.. r0. 0 85 199: 326 0 0 0 0 101 251. ___ ___9 0 0 0 0 0 0 - � 0 0 �✓ {-� �-G yyll D VhBlk Blk wall, stucco ext 2A-2ov 2A-2ov 12C Osw 26 2fv 26 2fv 11J0 wall, stucco ext y 0.201 0.330 0.330 0.091 0.330 0 330 _ 0_00 0.201 s s s w; w w _. w�� w 5.83 9.57 9.57 w 2 64 9.57. 9 57 1740 5.83 4.06 8.52 8.66 - 2 21• 11.58 • 19 08 .1.758, 4.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �� 0 0 0 0 0 0 0 _0 0 • 0 0 0 -- 0'-_ 0 0 _� 0 0 0 0 0' 0 0 �� _ _ 0. 0 0 0 0 0 0 0 __.. 0 0 0 0 0 0 0 0 _ 0 0 0 C 2A-2ov 2A-2ov 2B-2fv _.. 16B-30ad 0.330 0.330 0.330 0.032 0.989 w w w 9.57 9.57 9.57 0.93 21.62 21.62 19.08 1.69 0 0 0 142 0 0 0 142 0 0 _ 0 132 ___263 0 0 0 ._ _ _._ 240 0 0 .. 0 _�0 0 0 0 76 __-13 0 0 0 :_.. 71 0 0 0 -_._0, 128 76 76 ._.._. _.._..,_...._..,n...,..�......_.„ ,..i........_.,..s...... .a.3.... ,_..._. .,._.._.,. , ..mow.. .�..,_�,.... } ..m.. w.......... ._._.�_... .�_..._. ..._._....,.. 6 c) AED excursion -39 -39 Envelope loss/gain 870 606 1122 600 12 a) Infiltration 206 58 245 69 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1076 664 1367 669 Less external load 0 0 0 0 Less transfer Redistribution 0 0 0 0 0 0 0 0 14 Subtotal 1076 664 1367 669 151 Duct loads 1 13 % 27% 144 177 13% 27 % 183 179 Total room load 1220 841 1550 847 Air required (cfm) 53 37 67 37 Calculations approved bV ACCA to meet all requirements of Manual J 8th Ed. -44- wrYgtitsoft® 2020-Jun-12 12:00:23 Right-Suite® Universal 2019 19.0.12 RSU23828 Page B ...aterstone2265AGL1Lot22Bik2Waterstone2265AGL.rup Calc = MJ8 House faces: W `, DEL -AIR Right-M Worksheet `EUM-=COM OUNG Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL.32771 Phone: 407-333-2665 Job: Lot 22 Block 2 Waterstone 2... Date: NOVEMBER 3, 2010 By: DCS 1 Room name BR 4 2 Exposed wall 27.0 It 3 Room height 8.0 It heat/cool 4 5 Room dimensions Room area 1.0 x 170.0 ft 170.0 ftz Ty Construction U-value Or HTM Area (ftz) Load Area Load number (Btuh/W-°F) (Btuh/ftz) or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V�/ 12C Osw 0:091 n n, . 2 64 - 2 21; , ; ,_-0 -0. 550 n:_ 15 95. 12°64 _ �_ _ 0 3_ 0_ Vl/ Blk wall, stucco ext 0.201 n 5.83 4.06 112 112 653 455 _ ,2A-2ov 10C vj 2A 2ov -„0.330 0.550 0 330 n e, e _ e 9_57, 15 95 9 57 ..., 9 57 8.52 12'64 8 52 _8.52 0 0 0 ._. _L0 0 0 0 _ Q 0 0 0 -___ 0 0 « 0 0 V 104 16 0 0 _ 0 ..0 0 0 0 _ ' 0 , 0 r 0 0 357 376 0 - 0 _0 0 0 0 r0 0 0 0 0 _ y/ �--G �G W 1�1 V�J l213 Blk wall, stucco ext 2A-2ov 12_ Osw `_2A.2ov�_u �., _ Blk wall, stucco ext 12C Osw Blk wall, stucco ext 2A-2ov 2A-2ov 12GOsw -' 2fv 2B 2fv 11 J0, " Blk wall, stucco ext _ 0.201 0.330 0.091 _.._. ,.0.330 0.201 0 091 0.201 0.330 0.330 0 091 0 330 0 330 ._.,.0 600 0.201 a a se _,s6_:. se s s s s w w w _ w w 5.83 9.57 264 _ 9 57; 5.83 2 64 5.83 9.57 9.57 2.64 9 57 9 57 h. 17 40 5.83 4.06 23.20 221 :_ _,_8 52 4.06 V 2 21 4.06 8.52 8.66 _ 2 2f 11 58 19 08 4.06 88 0 0 0 0 7.0 0 0 0 0 0 0 0 512 155 0 0 - 0 0 0 0 �0 0 0 0 0 _ _ - C 2A-2ov 2A-2ov 213-2fv 1613-30ad 0.330 0.330 0.330 0.032 w w w 9.57 9.57 9.57 ,' 2'64, 0.93 21.62 21.62 19.08 1.69 0 0 0 170 0 0 0 170 0 0 0 158 0 0 0 287 22Atpl...::_ .._...'. a. 0.989 _ .._ °-_ 2868 : .17077,4__. 77 s , . 6 c) AED excursion 15 Envelope loss/gain 2252 1489 12 a) Infiltration 481 135 b) Room ventilation 0 0 13 Internal gains: Occupants @ 230 0 0 Appliances/other 300 Subtotal (lines 6 to 13) 12733 1924 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 2733 1924 15 Duct loads 13% 271% 366 514 Total room load 3099 2437 Air required (cfm) 134 107 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ii.t- wrigF�tsoft- 2020-Jun-1212:00:23 CWP. Right -Suite® Universal 2019 19.0.12 RSU23828 Page 9 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W DEL -AIR Duct System Summary Job: Lot E Block 22010 Nto... EATINc• NR CONciiIONWc Date: NOVMBER 3, 010 Entire House By: DCS DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665 For: ADAMS HOMES 8212 Amalfi Circle, Fort Pierce, FL 34951 External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0.30 in H2O 0.06 in H2O 0.24 in H2O 0.120 / 0.120 in H2O 0.174 in/100ft 1167 cfm 138 ft Cooling 0.30 in H2O 0.06 in H2O 0.24 in H2O 0.120 / 0.120 in H2O 0.174 1n/100ft 1167 cfm Supply Branch Detail Table Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk BATH 2 h 200 9 8 0.329 4.0 Ox 0 VIFx 3.0 70.0 BATH 3 h 1550 67 37 0.228 5.0 Ox 0 VIFx 20.4 85.0 st1 BR h 2059 89 70 0.309 6.0 Ox0 VIFx 7.6 70.0 BR 3 h 1713 74 61 0.234 6.0 Ox 0 VIFx 17.5 85.0 sti BR 4 h 3099 134 107 0.217 6.0 Ox 0 VIFx 25.4 85.0 St1 BRKFST h 1220 53 37 0.231 6.0 Ox 0 VIFx 19.0 85.0 St1 DIN c 2515 73 111 0.300 6.0 Ox 0 VIFx 10.0 70.0 FAM C 5037 164 221 0.226 8.0 Ox0 VIFx 21.2 85.0 st2 KIT c 1747 7 77 0.322 6.0 Ox0 VIFx 4.5 70.0 LIv h 4359 188 162 0.201 8.0 Ox0 VIFx 34.3 85.0 st2 M BATH h 1350 58 36 0.179 5.0 Ox 0 VIFx 34.0 100.0 st3 M BR h 4702 203 173 0.174 8.0 Ox 0 VIFx 38.3 100.0 st3 UTIL c 986 13 43 0.328 4.0 Ox 0 VIFx 3.2 70.0 We c 51 1 2 0.216 4.0 Ox 0 VIFx 26.0 85.0 st2 wlc 1 h 783 34 18 0.176 4.0 Ox0 VIFx 36.1 100.0 st3 WIC 2 c 71 2 3 0.182 4.0 Ox 0 VIFx 32.0 100.0 st3 Supply Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk st3 Peak AVF 297 230 0.174 544 10.0 0 x 0 VinlFlx st2 st2 Peak AVF 650 616 0.174 608 14.0 0 x 0 VinlFlx SO Peak AVF 327 243 0.217 600 10.0 0 x 0 VinlFlx �w Wrightsoft, 2020-Jun-1212:00:24 �M,,..•,..� a.. gym„.. Right -Suite® Universal 2019 19.0.12 RSU23828 Page 1 ...aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Calc = MJ8 House faces: W Return Branch Detail Table Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FIR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rbi Ox 0 1167 1167 0 0 0 0 Ox 0 VIFx * wrightso'ft, 2020-J un-1 2 12:00:24 I.� AM,.�• o �» . ,.. Right -Suite® Universal 2019 19.0.12 RSU23828 Page 2 ..aterstone2265AGL\Lot22Blk2Waterstone2265AGL.rup Cale = MJ8 House faces: W 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Lot 22 Block 2 Waterstone 2265 AGL Builder Name: ADAMS HOMES Street: 8212 Amalfi Circle Permit Office: City, State, Zip: Fort Pierce , FL , 34951 Permit Number: Y U Owner: Jurisdiction: 661000 = Design Location: FL, ST LUCIE_CO_INTL U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in an dropped9 ceiling/soffit /soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spa s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exteriorwalls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. I Caulking or other adhesive sealants shall not be used to fill voids between fire snrinkler cover plates and walls or cewfings. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 6/12/2020 12:31 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 . FORM R405-2017 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential Simulated Performance Method shall include: ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a -ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst -case orientation, name and version of the compliance software tool, name of individual completing the compliance report (one page) and an input summary checklist that can be used for field verification (usually four pages/may be greater). ❑ Energy Performance Level (EPL) Display Card (one page) ❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements (five pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page) ❑ A completed Envelope Leakage Test Report (usually one page) ❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed Form R405 Duct Leakage Test Report (usually one page) 6/12/2020 12:30:03 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: 661000 Permit #: Job Information, Builder: ADAMS HOMES Community: Lot: NA Address: 8212 Amalfi Circle City: Fort Pierce State: FL Zip: 34951 Air, Leakage Test; 'ResultS Passing results must meet either the Performance; Prescriptive, or.ER1 Method" O PRESCRIPTIVE METHOD -The building;or dwell ng.unit shall be tested and verified as.havingan airieakage rate of not,exceedihq,7 air changes per,hour at a pressure of 0.2 inch w.g: (50 Pascals ),in Climate Zones 1 and 2 ' PERFORMANCE or.ERI MET HOD-Ttie building,or.dwelling unit shall be tested andwerified'as$having an air leakage rate.of nof,exceeding;; the selected ACH(' value, as'shown,on Forrn 1`1405-2017 (Performance) or R406-2017 {ERI), section labeled'as infiltration, sub -section ACH50. .ACH(50) spe6ifted on Form R405-2017-,ErieW Calc (P, ertbrmance)'or• R406-201.7(ERI): 7.000 x 60 _ 20529 — Method for calculating building volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans 1-1 PASS • Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals) Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 6/12/2020 12:31:11 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods ADDRESS: 8212 Amalfi Circle Permit Number: Fort Pierce, FL, 34951 MANDATORY REQUIREMENTS See individual code sections for full details. .V SECTION R401 GENERAL •� R401.3 Energy Performance Level (EPL) display card (Mandatory) The building official shall require that an energy performance level (EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD. R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with Section C402.5. R402.4.1 Building thermal enveldibm building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. R402.4.1.1 Installation The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required by the code official, an approved third party shall inspect all components and verify compliance. R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Fj R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907. .Fi R402.4.3 Fenestration air IeakagdNindows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tested according to NFRC 400 or AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer. Exception: Site -built windows, skylights and doors. 6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 5 MANDATORY REQUIREMENTS - (Continued) ❑R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions- 1 . Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. ❑ R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not more than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS R403.1 Controls. ❑ R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. ❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load. ❑ R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g) or (1), Florida Statutes, to be "substantially leak free" in accordance with Section R403.3.3. ❑ R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design airflow rate when tested in accordance with ASHRAE 193. ❑ R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods: Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test. 2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. ❑ R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums. ❑ R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41 °C) or below 55'F (13°C) shall be insulated to a minimum of R-3. ❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause degradation of the material. Adhesive tape shall not be permitted. El accordance Heated water circulation and temperature maintenance systems (Mandatory) Heated water circulation systems shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible. • ❑ R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. ❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. 6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5 MANDATORY REQUIREMENTS - (Continued) ❑ R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3'Y2 inches (89 mm) in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies (Mandatory). - R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting range shall be from 100°F to 140OF (38°C to 60°C). .E1 R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main bumer(s) of combustion types of service water -heating systems to be turned off. R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1. ❑ R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar water -heating systems should meet the following criteria: 1. Be installed with atilt angle between 10 degrees and 40 degrees of the horizontal; and 2. Be installed at an orientation within 45 degrees of true south. R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. -� R403.6.1 Whole -house mechanical ventilation system fan efficacy.When installed to function as a whole -house mechanical ventilation system, fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where whole -house mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered by an electronically commutated motor. R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation shall meet the following criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed. for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment (Mandatory). El R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1 WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM (CFM) MINIMUM EFFICACY a (CFM/WATT) AIRFLOW RATE MAXIMUIV (CFM) Range hoods Any 2.8 cfm/watt Any In -line fan Any 2.8 cfm/watt Any Bathroom, utility room 10 1.4 cfm/watt <90 Bathroom, utility room 90 2.8 cfm/watt Any For SI: 1 cfm = 28.3 Umin. a. When tested in accordance with HVI Standard 916 6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 r ' MANDATORY REQUIREMENTS - (Continued) R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space. Exceptions: 1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. ❑ R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. ❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.7.1. ❑ R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.7.1. ❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. A variable capacity system sized for optimum performance during base load periods is utilized. R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections ❑ C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403. ❑ R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C). ❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots. ❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar- and waste -heat -recovery pool heating systems. 3. Where pumps are powered exclusively from on -site renewable generation. ❑ R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required. ❑ R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. 6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5 I a s 4 R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard. ❑ R403.11 Portable spas (Mandatoryhe energy consumption of electric -powered portable spas shall be controlled by the requirements of APSP-14. SECTION R404 ❑ R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps. Exception: Low -voltage lighting. R404.1.1 Lighting equipment (Mandatory)Fuel gas lighting systems shall not have continuously burning pilot lights. 6/12/2020 12:30 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5