HomeMy WebLinkAboutBlower DoorEnvelope Leakage Test Report
{Blower Door Test)
R402.~.1.2 · compliance
Permit #: z t.,(;, \ -o 6 t., ,
Job lnforrnlitlon
Builder. f'\l\.t,\ Community: Lot l lP 1
Address: / t~ cJ Unit:
State: A. Zip:
Air Leakage Test Result.s Pass1terau1tsmustbe7ltCHISOJorless
y/1/ X 60 + }Y:S 9 'L = .S. I
CFM(S0) Bufldlng Volume ACH(SO)
~PASS
Method for calculaUne bt1Ud,ne, volume· Q Retrieved from architectural plans
fXI Code ~ttware calwlated
0 Field measured and calc1.1Jc1ted
11 I IWhen ACH(SO} Is eq~al to or less than 3. Mechanical Ventilation Installation must be verified by bulldlng department
Certlflcatkm of Test rte~ufts
M0.2-4. 1 .2 TestliJ8. The building or dweJllng unit shall be tested and vertfled as having an air leakage rate of not exceeding 7 air
changes per hour In Climate Zones 1 and 2, 3 air changes per hour In CDmate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure or 0.2 Inches w.g. (SO Pascals). Testing shall be conduaed by either lndMduals as deffned fn Section
553.993(5) or (7), F.S. or Individuals Hcensed as set forth In Section 489.105(3Xf). (g), or (I} or an oppl'GMd third party. A written report
of the results of the test shall be signed by the party conducting the test and provided to the code olftc/al. Testing shall be performed
at-any time after creation of all penetrations of the bullding thermal enllflope.
Testing Campany
Company Name: G-[,4 . bfc-,/C,C..·./-1c,//c.-/ Phone: 772 -C/2(/-s5··7s_
I hereby verify that the above N.r Leakage results are In accordance with the 5th Edition Aorlda Building Code Ene'!)' ConseMtion
requirements Section R402.4.1.2, Climate Zone 1 and 2.
Date of Test:_,__ ____ _
Signature of Tester: __ -/?-c::_---1.:::..__--f.~---
-----...-
Printed Name ofTester: ft ~.....__,~-----1.~~:::!.._.L..:.... ____ _
License/Certification#: So{q(/ 7 s 5 Issuing Authority: eP l