No preview available
HomeMy WebLinkAboutTruss EngineeringLumber design values are in accordance with ANSI/TPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. RE: Job ARMSCMB1L15X10 Page 1 of 2 A-1 Roof Trusses 4451 St Lucie Blvd Fort Pierce, FL 34946Site Information: Customer Info: RENAR DEVELOPMENT CO. Project Name: MORNINGSIDE Lot/Block:Model: CAYMAN 1763 Subdivision: Address: City: County: St Lucie State: FL Name Address and License # of Structural Engineer of Record, If there is one, for the building. Name: License #: Address: City: General Truss Engineering Criteria Design Loads (Individual Truss Design Drawings Show Special Loading Conditions): Design Code: FBC 7th Ed. 2020 Res. / TPI 2014 Design Program: Alpine Engineered Products Wind Code: ASCE 7-16 Wind Speed: 160 Roof Load: 37.0 psf Floor Load: 0.0 psf This package includes 41 individual, dated Truss Design Drawings and 16 Additional Drawings. With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet conforms to 61G15-31.003,section 5 of the Florida Board of Professional Engineers Rules. The truss drawing(s) referenced have been prepared by Alpine Engineered Products, Inc. under my direct supervision based on the parameters provided by A-1 Roof Trusses, Ltd. Truss Design Engineer's Name: Rama Pranav Kristam My license renewal date for the state of Florida is February 28,2021. NOTE: The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of components for any particular building is the responsibility of the building designer, per ANSI/TPI-1 Sec. 2. The Truss Design Drawing(s)(TDD[s]) referenced have been prepared based on the construction documents (also referred to at times as 'Structural Engineering Documents') provided by the Building Designer indicating the nature and character of the work. The design criteria therein have been transferred to Rama Pranav Kristam PE by [A1 Roof Trusses or specific location]. These TDDs (also referred to at times as 'Structural Delegated' Engineering Documents') are specialty structural component designs and may be part of the project's deferred or phased submittals. As a Truss Design Engineer (i.e., Specialty Engineer), the seal here and on the TDD represents an acceptance of professional engineering responsibility for the design of the single Truss depicted on the TDD only. The Building Designer is responsible for and shall coordinate and review the TDDs for compatibility with their written engineering requirements. Please review all TDDs and all related notes. Rama Pranav Kristam, P.E. 4451 St Lucie Blvd. Suite 201 Fort Pierce, FL 34946 No.Seq #Truss Name Date 1 2815 A01 1/21/21 2 2812 A02 1/21/21 3 2818 A03 1/21/21 4 2821 A05 1/21/21 5 2773 A06 1/21/21 6 2779 A07 1/21/21 7 2782 A08 1/21/21 8 2785 A09 1/21/21 9 2788 A10 1/21/21 10 2535 A11 1/21/21 11 2499 A12GE 1/21/21 12 2486 A13 1/21/21 No.Seq #Truss Name Date 13 2495 B01G 1/21/21 14 2506 B02 1/21/21 15 2549 B03 1/21/21 16 2794 C01G 1/21/21 17 2791 C02 1/21/21 18 2620 C03 1/21/21 19 2797 C04 1/21/21 20 2502 D01 1/21/21 21 2529 E01 1/21/21 22 2800 E02 1/21/21 23 2803 E04 1/21/21 24 2806 E05 1/21/21 No.Seq #Truss Name Date 25 2809 E06 1/21/21 26 2492 HJ5P 1/21/21 27 2468 HJ7 1/21/21 28 2472 HJ7A 1/21/21 29 2684 J1 1/21/21 30 2489 J1P 1/21/21 31 2552 J3 1/21/21 32 2565 J3A 1/21/21 33 2652 J3P 1/21/21 34 2687 J5 1/21/21 35 2600 J5A 1/21/21 36 2486 J5P 1/21/21 Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. RE: Job ARMSCMB1L15X10 Page 2 of 2 No.Seq #Truss Name Date 37 2498 J7 1/21/21 38 2753 VM03 1/21/21 39 2759 VM05 1/21/21 40 2762 VM07 1/21/21 41 2767 VM09 1/21/21 42 STDL01 STD. DETAIL 1/21/21 43 STDL02 STD. DETAIL 1/21/21 44 STDL03 STD. DETAIL 1/21/21 45 STDL04 STD. DETAIL 1/21/21 46 STDL05 STD. DETAIL 1/21/21 47 STDL06 STD. DETAIL 1/21/21 48 STDL07 STD. DETAIL 1/21/21 49 STDL08 STD. DETAIL 1/21/21 50 STDL09 STD. DETAIL 1/21/21 51 STDL10 STD. DETAIL 1/21/21 52 STDL11 STD. DETAIL 1/21/21 53 STDL12 STD. DETAIL 1/21/21 54 STDL13 STD. DETAIL 1/21/21 55 STDL14 STD. DETAIL 1/21/21 56 STDL15 STD. DETAIL 1/21/21 57 STDL16 STD. DETAIL 1/21/21 Rama Pranav Kristam, P.E. # 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4 2x4 SP M-30; Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W3,W6,W9 2x4 SP #2; W11 2x4 SP M-30; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 24.00 BC 120 0.15 11.74 BC 92 11.71 19.11 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1540 /- /- /875 /212 /264 L 1539 /- /- /873 /221 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 L Brg Width = 8.0 Min Req = 1.8 Bearings B & L are a rigid surface. Bearings B & L require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1150 -2706 C - D 1969 -4623 D - E 1980 -4546 E - F 2099 -4600 F - G 2431 -5421 Chords Tens. Comp. G - H 2110 -4726 H - I 2799 -6416 I - J 1059 -2064 J - K 1036 -2120 K - L 1157 -2684 L - M 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2343 -902 U - T 34 -14 S - R 3433 -1200 R - P 6831 -2606 Chords Tens. Comp. Q - O 24 -9 O - N 2315 -909 N - L 2317 -908 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 592 -1314 C - S 1747 -631 U - S 2670 -1026 E - S 219 -242 S - T 72 0 S - F 1156 -563 F - R 3585 -1516 G - R 1073 -2386 Webs Tens. Comp. R - H 1242 -3003 H - P 2325 -824 P - Q 58 0 P - O 2541 -919 P - I 5040 -1965 O - I 578 -1469 O - K 290 -578 K - N 240 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.587 P 771 360 VERT(CL): 1.106 P 408 240 HORZ(LL): 0.353 N - - HORZ(TL): 0.666 N - - Creep Factor: 2.0 Max TC CSI: 0.682 Max BC CSI: 0.967 Max Web CSI: 0.968 Wgt: 229.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A01 Truss Type SPEC Qty 1 Ply 1 286401/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 15'6"1'6"6'11-15/16"14' 11'10-5/8"7'2-1/4"18'11-1/8"1'5-9/16"1'5-9/16" 4-3/16"7'4-3/16"2'9-3/4"4'7-5/16"8'1-3/16"8'8-15/16"(a) A B C D E F G H I J K L M NO P Q R S TU 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X3 7X8 1.5X4 6X6(R)6X6 8X12(R) 5X6 H1014 1.5X3 8X12 8X12 3X6 3X4 1.5X3 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4 2x4 SP M-30; Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W3,W6,W9 2x4 SP #2; W11 2x4 SP M-30; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 24.00 BC 120 0.15 11.74 BC 92 11.71 19.11 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1540 /- /- /875 /212 /264 L 1539 /- /- /873 /221 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 L Brg Width = 8.0 Min Req = 1.8 Bearings B & L are a rigid surface. Bearings B & L require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1150 -2706 C - D 1969 -4623 D - E 1980 -4546 E - F 2099 -4600 F - G 2431 -5421 Chords Tens. Comp. G - H 2110 -4726 H - I 2799 -6416 I - J 1059 -2064 J - K 1036 -2120 K - L 1157 -2684 L - M 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2343 -902 U - T 34 -14 S - R 3433 -1200 R - P 6831 -2606 Chords Tens. Comp. Q - O 24 -9 O - N 2315 -909 N - L 2317 -908 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 592 -1314 C - S 1747 -631 U - S 2670 -1026 E - S 219 -242 S - T 72 0 S - F 1156 -563 F - R 3585 -1516 G - R 1073 -2386 Webs Tens. Comp. R - H 1242 -3003 H - P 2325 -824 P - Q 58 0 P - O 2541 -919 P - I 5040 -1965 O - I 578 -1469 O - K 290 -578 K - N 240 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.587 P 771 360 VERT(CL): 1.106 P 408 240 HORZ(LL): 0.353 N - - HORZ(TL): 0.666 N - - Creep Factor: 2.0 Max TC CSI: 0.682 Max BC CSI: 0.967 Max Web CSI: 0.968 Wgt: 229.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A01 Truss Type SPEC Qty 1 Ply 1 286401/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 15'6"1'6"6'11-15/16"14' 11'10-5/8"7'2-1/4"18'11-1/8"1'5-9/16"1'5-9/16" 4-3/16"7'4-3/16"2'9-3/4"4'7-5/16"8'1-3/16"8'8-15/16"(a) A B C D E F G H I J K L M NO P Q R S TU 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X3 7X8 1.5X4 6X6(R)6X6 8X12(R) 5X6 H1014 1.5X3 8X12 8X12 3X6 3X4 1.5X3 3X6(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8,W9 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.00 23.00 BC 117 0.15 11.74 BC 93 11.71 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1540 /- /- /877 /226 /257 K 1539 /- /- /877 /227 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1168 -2706 C - D 1963 -4492 D - E 1974 -4415 E - F 2090 -4480 F - G 2240 -5014 Chords Tens. Comp. G - H 2235 -4989 H - I 1050 -2004 I - J 1022 -2046 J - K 1166 -2669 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2343 -929 T - S 24 -13 R - P 3569 -1331 Q - O 13 -7 Chords Tens. Comp. O - N 2298 -911 N - M 2298 -911 M - K 2300 -910 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 594 -1279 C - R 1631 -610 T - R 2661 -1050 E - R 214 -246 R - S 71 0 R - F 882 -420 F - P 1855 -754 Webs Tens. Comp. G - P 211 -159 P - Q 29 0 P - O 2811 -1019 P - H 4039 -1551 O - H 714 -1852 O - J 319 -643 J - M 264 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.469 G 964 360 VERT(CL): 0.885 G 511 240 HORZ(LL): 0.298 M - - HORZ(TL): 0.562 M - - Creep Factor: 2.0 Max TC CSI: 0.931 Max BC CSI: 0.990 Max Web CSI: 0.912 Wgt: 218.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A02 Truss Type HIPS Qty 1 Ply 1 286501/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 15'7'11-15/16"15' 11'10-5/8"7'2-1/4"18'11-1/8"1'5-9/16"1'5-9/16" 4-3/16"2'9-3/4"4'7-5/16"7'10-3/16"8'5-15/16"(a) (a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X3 5X10 1.5X4 5X6 1.5X3 10X10 1.5X3 7X8 6X10 3X6 3X6 3X4 1.5X3 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8,W9 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.00 23.00 BC 117 0.15 11.74 BC 93 11.71 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1540 /- /- /877 /226 /257 K 1539 /- /- /877 /227 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1168 -2706 C - D 1963 -4492 D - E 1974 -4415 E - F 2090 -4480 F - G 2240 -5014 Chords Tens. Comp. G - H 2235 -4989 H - I 1050 -2004 I - J 1022 -2046 J - K 1166 -2669 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2343 -929 T - S 24 -13 R - P 3569 -1331 Q - O 13 -7 Chords Tens. Comp. O - N 2298 -911 N - M 2298 -911 M - K 2300 -910 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 594 -1279 C - R 1631 -610 T - R 2661 -1050 E - R 214 -246 R - S 71 0 R - F 882 -420 F - P 1855 -754 Webs Tens. Comp. G - P 211 -159 P - Q 29 0 P - O 2811 -1019 P - H 4039 -1551 O - H 714 -1852 O - J 319 -643 J - M 264 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.469 G 964 360 VERT(CL): 0.885 G 511 240 HORZ(LL): 0.298 M - - HORZ(TL): 0.562 M - - Creep Factor: 2.0 Max TC CSI: 0.931 Max BC CSI: 0.990 Max Web CSI: 0.912 Wgt: 218.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A02 Truss Type HIPS Qty 1 Ply 1 286501/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 15'7'11-15/16"15' 11'10-5/8"7'2-1/4"18'11-1/8"1'5-9/16"1'5-9/16" 4-3/16"2'9-3/4"4'7-5/16"7'10-3/16"8'5-15/16"(a) (a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 3X6 1.5X3 5X10 1.5X4 5X6 1.5X3 10X10 1.5X3 7X8 6X10 3X6 3X6 3X4 1.5X3 3X6(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2,T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 21.00 BC 120 0.15 11.74 BC 93 11.70 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1540 /- /- /877 /199 /285 K 1539 /- /- /877 /200 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1033 -2703 C - D 1718 -4513 D - E 1840 -4534 E - F 1860 -4500 F - G 1418 -3597 Chords Tens. Comp. G - H 1416 -3583 H - I 1009 -2081 I - J 989 -2194 J - K 1029 -2627 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2339 -809 T - S 25 -11 R - P 3246 -939 Q - O 9 -4 Chords Tens. Comp. O - N 9 -4 N - M 2253 -778 M - K 2255 -777 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 522 -1278 C - R 1658 -505 T - R 2658 -914 D - R 254 -324 R - S 71 0 R - F 1229 -578 F - P 892 -246 Webs Tens. Comp. G - P 158 -74 P - Q 87 0 P - H 2230 -604 P - N 3340 -959 H - N 437 -1729 N - J 332 -614 J - M 228 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.365 P 999 360 VERT(CL): 0.689 P 656 240 HORZ(LL): 0.249 M - - HORZ(TL): 0.469 M - - Creep Factor: 2.0 Max TC CSI: 0.708 Max BC CSI: 0.850 Max Web CSI: 0.970 Wgt: 226.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A03 Truss Type HIPS Qty 1 Ply 1 286601/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 17'4'17' 11'10-5/8"7'2-1/4"18'11-1/8"1'5-9/16"1'5-9/16" 4-3/16"2'9-3/4"4'7-5/16"8'10-3/16"9'5-15/16"(a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 1.5X3 5X8 1.5X4 3X6 5X6 1.5X3 10X10 2X4 5X6(R) 3X6 3X6 6X12 3X4 1.5X3 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2,T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W3,W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 17.00 21.00 BC 120 0.15 11.74 BC 93 11.70 19.22 BC 120 19.22 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1540 /- /- /877 /199 /285 K 1539 /- /- /877 /200 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.8 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1033 -2703 C - D 1718 -4513 D - E 1840 -4534 E - F 1860 -4500 F - G 1418 -3597 Chords Tens. Comp. G - H 1416 -3583 H - I 1009 -2081 I - J 989 -2194 J - K 1029 -2627 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - T 2339 -809 T - S 25 -11 R - P 3246 -939 Q - O 9 -4 Chords Tens. Comp. O - N 9 -4 N - M 2253 -778 M - K 2255 -777 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - T 522 -1278 C - R 1658 -505 T - R 2658 -914 D - R 254 -324 R - S 71 0 R - F 1229 -578 F - P 892 -246 Webs Tens. Comp. G - P 158 -74 P - Q 87 0 P - H 2230 -604 P - N 3340 -959 H - N 437 -1729 N - J 332 -614 J - M 228 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.365 P 999 360 VERT(CL): 0.689 P 656 240 HORZ(LL): 0.249 M - - HORZ(TL): 0.469 M - - Creep Factor: 2.0 Max TC CSI: 0.708 Max BC CSI: 0.850 Max Web CSI: 0.970 Wgt: 226.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A03 Truss Type HIPS Qty 1 Ply 1 286601/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 17'4'17' 11'10-5/8"7'2-1/4"18'11-1/8"1'5-9/16"1'5-9/16" 4-3/16"2'9-3/4"4'7-5/16"8'10-3/16"9'5-15/16"(a) A B C D E F G H I J K L MNO P Q R ST 6 12 3 123X6(A1) 4X4 5X6 1.5X3 5X8 1.5X4 3X6 5X6 1.5X3 10X10 2X4 5X6(R) 3X6 3X6 6X12 3X4 1.5X3 3X6(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x4 :SP 2400f-2.0E + SP M-31:; B2 2x4 SP M-30; Webs: 2x4 SP #3; Filler: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.52 19.00 BC 120 19.00 37.48 BC 116 28.11 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1546 /- /- /870 /199 /314 H 1546 /- /- /865 /201 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 H Brg Width = 8.0 Min Req = 1.5 Bearings B & H are a rigid surface. Bearings B & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1517 -4733 C - D 1380 -4342 D - E 1015 -3224 Chords Tens. Comp. E - F 1022 -3223 F - G 1381 -4335 G - H 1520 -4726 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Q 4252 -1269 Q - P 3678 -967 P - O 3704 -963 O - N 3701 -953 N - M 3675 -955 Chords Tens. Comp. M - L 3654 -958 L - K 4230 -1248 K - J 4214 -1256 J - H 4215 -1265 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Q 273 -335 Q - D 523 -109 D - O 450 -811 E - O 2435 -645 O - F 453 -801 F - L 524 -113 Webs Tens. Comp. R - M 85 0 R - S 11 -3 L - G 276 -395 S - K 167 0 S - J 10 -4 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.533 O 849 360 VERT(CL): 0.987 O 458 240 HORZ(LL): 0.378 J - - HORZ(TL): 0.717 J - - Creep Factor: 2.0 Max TC CSI: 0.808 Max BC CSI: 0.820 Max Web CSI: 0.928 Wgt: 190.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A05 Truss Type COMN Qty 3 Ply 1 286701/20/2021 27'4-7/8"9'10-1/2"8-5/8" 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 19'8'1-3/8"10'2"8-5/8"1'5-9/16" 1'5-9/16" 4-3/16"4'7-1/16"9'10-3/16"10'5-15/16"A B C D E F G H IJ K LMN O PQ R S 6 12 3 12 3X8(F1) 1.5X3 3X4 H0308 5X6 5X6 6X8 5X6 H0308 1.5X3 1.5X3 3X4 1.5X3 1.5X3 1.5X3 2X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x4 :SP 2400f-2.0E + SP M-31:; B2 2x4 SP M-30; Webs: 2x4 SP #3; Filler: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.52 19.00 BC 120 19.00 37.48 BC 116 28.11 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1546 /- /- /870 /199 /314 H 1546 /- /- /865 /201 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 H Brg Width = 8.0 Min Req = 1.5 Bearings B & H are a rigid surface. Bearings B & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1517 -4733 C - D 1380 -4342 D - E 1015 -3224 Chords Tens. Comp. E - F 1022 -3223 F - G 1381 -4335 G - H 1520 -4726 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - Q 4252 -1269 Q - P 3678 -967 P - O 3704 -963 O - N 3701 -953 N - M 3675 -955 Chords Tens. Comp. M - L 3654 -958 L - K 4230 -1248 K - J 4214 -1256 J - H 4215 -1265 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - Q 273 -335 Q - D 523 -109 D - O 450 -811 E - O 2435 -645 O - F 453 -801 F - L 524 -113 Webs Tens. Comp. R - M 85 0 R - S 11 -3 L - G 276 -395 S - K 167 0 S - J 10 -4 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.533 O 849 360 VERT(CL): 0.987 O 458 240 HORZ(LL): 0.378 J - - HORZ(TL): 0.717 J - - Creep Factor: 2.0 Max TC CSI: 0.808 Max BC CSI: 0.820 Max Web CSI: 0.928 Wgt: 190.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A05 Truss Type COMN Qty 3 Ply 1 286701/20/2021 27'4-7/8"9'10-1/2"8-5/8" 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 19'8'1-3/8"10'2"8-5/8"1'5-9/16" 1'5-9/16" 4-3/16"4'7-1/16"9'10-3/16"10'5-15/16"A B C D E F G H IJ K LMN O PQ R S 6 12 3 12 3X8(F1) 1.5X3 3X4 H0308 5X6 5X6 6X8 5X6 H0308 1.5X3 1.5X3 3X4 1.5X3 1.5X3 1.5X3 2X4 3X8(F1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP M-30; Webs: 2x4 SP #3; Lt Wedge: 2x4 SP #3;Rt Wedge: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.15 19.00 BC 120 19.00 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL O 1546 /- /- /870 /198 /314 H 1546 /- /- /870 /198 /- Wind reactions based on MWFRS O Brg Width = 8.0 Min Req = 1.7 H Brg Width = 8.0 Min Req = 1.7 Bearings O & H are a rigid surface. Bearings O & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1511 -4704 C - D 1384 -4350 D - E 1012 -3221 Chords Tens. Comp. E - F 1019 -3221 F - G 1377 -4350 G - H 1506 -4704 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 4254 -1259 N - M 3680 -968 M - L 3706 -964 Chords Tens. Comp. L - K 3706 -952 K - J 3680 -955 J - H 4254 -1247 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 257 -318 N - D 529 -112 D - L 455 -810 E - L 2434 -643 Webs Tens. Comp. L - F 455 -810 F - J 529 -110 J - G 258 -318 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.560 L 808 360 VERT(CL): 1.060 L 426 240 HORZ(LL): 0.388 J - - HORZ(TL): 0.735 J - - Creep Factor: 2.0 Max TC CSI: 0.843 Max BC CSI: 0.826 Max Web CSI: 0.927 Wgt: 175.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A06 Truss Type COMN Qty 10 Ply 1 286801/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 19'19'1'5-9/16"1'5-9/16" 4-3/16"4'7-1/16"9'10-3/16"10'5-15/16"A B C D E F G H I J K L MN O 6 12 3 12 3X8(F1) 3X8(F1) 1.5X3 3X4 H0308 5X6 5X6 6X8 5X6 H0308 3X4 1.5X3 3X8(F1) 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP M-30; Webs: 2x4 SP #3; Lt Wedge: 2x4 SP #3;Rt Wedge: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.15 19.00 BC 120 19.00 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL O 1546 /- /- /870 /198 /314 H 1546 /- /- /870 /198 /- Wind reactions based on MWFRS O Brg Width = 8.0 Min Req = 1.7 H Brg Width = 8.0 Min Req = 1.7 Bearings O & H are a rigid surface. Bearings O & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1511 -4704 C - D 1384 -4350 D - E 1012 -3221 Chords Tens. Comp. E - F 1019 -3221 F - G 1377 -4350 G - H 1506 -4704 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - N 4254 -1259 N - M 3680 -968 M - L 3706 -964 Chords Tens. Comp. L - K 3706 -952 K - J 3680 -955 J - H 4254 -1247 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - N 257 -318 N - D 529 -112 D - L 455 -810 E - L 2434 -643 Webs Tens. Comp. L - F 455 -810 F - J 529 -110 J - G 258 -318 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.560 L 808 360 VERT(CL): 1.060 L 426 240 HORZ(LL): 0.388 J - - HORZ(TL): 0.735 J - - Creep Factor: 2.0 Max TC CSI: 0.843 Max BC CSI: 0.826 Max Web CSI: 0.927 Wgt: 175.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A06 Truss Type COMN Qty 10 Ply 1 286801/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 19'19'1'5-9/16"1'5-9/16" 4-3/16"4'7-1/16"9'10-3/16"10'5-15/16"A B C D E F G H I J K L MN O 6 12 3 12 3X8(F1) 3X8(F1) 1.5X3 3X4 H0308 5X6 5X6 6X8 5X6 H0308 3X4 1.5X3 3X8(F1) 3X8(F1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8,W9 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 80 0.15 11.49 BC 75 11.50 23.07 BC 25 20.97 23.07 BC 83 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /873 /554 /314 K 1543 /- /- /868 /557 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.5 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 946 -2668 C - D 1007 -2643 D - E 736 -1841 E - F 767 -1803 F - G 808 -1738 Chords Tens. Comp. G - H 1293 -3840 H - I 1272 -3889 I - J 1637 -4532 J - K 1546 -4663 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2299 -714 V - U 73 -34 T - S 2320 -650 S - Q 1 -5 Chords Tens. Comp. R - P 2 -7 Q - O 8 -6 N - M 4021 -1146 M - K 4174 -1279 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 176 -343 C - T 78 -39 V - T 2260 -690 T - U 52 0 T - D 523 -142 D - S 443 -926 F - S 1173 -491 S - G 705 -2287 S - N 2675 -569 Webs Tens. Comp. R - Q 37 0 G - N 3260 -844 N - O 25 0 N - I 345 -556 O - P 34 0 W - N 0 0 I - M 384 -183 M - J 216 -236 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.445 N 999 360 VERT(CL): 0.840 N 538 240 HORZ(LL): 0.266 M - - HORZ(TL): 0.502 M - - Creep Factor: 2.0 Max TC CSI: 0.859 Max BC CSI: 0.994 Max Web CSI: 0.861 Wgt: 235.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A07 Truss Type COMN Qty 3 Ply 1 286901/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 11'7-9/16"9'4-1/16"2'2-15/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"8"3'6-7/16"9'10-3/16"10'5-15/16"(a) (a) A B C D E F G H I J K L M N OPQRS TUV W 6 12 3 12 3X6(A1) 3X4 4X8(R) 5X8 3X4 3X6 5X6 7X10 7X6 10X10 3X3 3X6 3X4 3X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8,W9 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 80 0.15 11.49 BC 75 11.50 23.07 BC 25 20.97 23.07 BC 83 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /873 /554 /314 K 1543 /- /- /868 /557 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.5 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 946 -2668 C - D 1007 -2643 D - E 736 -1841 E - F 767 -1803 F - G 808 -1738 Chords Tens. Comp. G - H 1293 -3840 H - I 1272 -3889 I - J 1637 -4532 J - K 1546 -4663 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2299 -714 V - U 73 -34 T - S 2320 -650 S - Q 1 -5 Chords Tens. Comp. R - P 2 -7 Q - O 8 -6 N - M 4021 -1146 M - K 4174 -1279 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 176 -343 C - T 78 -39 V - T 2260 -690 T - U 52 0 T - D 523 -142 D - S 443 -926 F - S 1173 -491 S - G 705 -2287 S - N 2675 -569 Webs Tens. Comp. R - Q 37 0 G - N 3260 -844 N - O 25 0 N - I 345 -556 O - P 34 0 W - N 0 0 I - M 384 -183 M - J 216 -236 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.445 N 999 360 VERT(CL): 0.840 N 538 240 HORZ(LL): 0.266 M - - HORZ(TL): 0.502 M - - Creep Factor: 2.0 Max TC CSI: 0.859 Max BC CSI: 0.994 Max Web CSI: 0.861 Wgt: 235.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A07 Truss Type COMN Qty 3 Ply 1 286901/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 11'7-9/16"9'4-1/16"2'2-15/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"8"3'6-7/16"9'10-3/16"10'5-15/16"(a) (a) A B C D E F G H I J K L M N OPQRS TUV W 6 12 3 12 3X6(A1) 3X4 4X8(R) 5X8 3X4 3X6 5X6 7X10 7X6 10X10 3X3 3X6 3X4 3X4 3X8(F1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 18.06 19.94 BC 80 0.15 11.49 BC 75 11.48 23.07 BC 25 20.97 23.07 BC 83 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /875 /555 /300 K 1543 /- /- /870 /559 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.5 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 955 -2670 C - D 1034 -2643 D - E 1161 -2684 E - F 1186 -2642 F - G 825 -1632 Chords Tens. Comp. G - H 1373 -3833 H - I 1347 -3882 I - J 1636 -4525 J - K 1561 -4660 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2302 -730 V - U 69 -38 T - S 1632 -386 S - Q 1 -6 Chords Tens. Comp. R - P 2 -7 Q - O 8 -5 N - M 4037 -1228 M - K 4172 -1294 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 183 -346 C - T 93 -47 V - T 2267 -702 D - T 266 -344 T - U 51 0 T - F 1102 -506 F - S 241 -192 S - G 438 -1475 S - N 2279 -511 Webs Tens. Comp. G - N 3402 -944 R - Q 39 0 N - O 0 -43 N - I 377 -593 O - P 32 0 W - N 0 0 I - M 397 -165 M - J 204 -237 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.426 N 999 360 VERT(CL): 0.804 N 563 240 HORZ(LL): 0.259 M - - HORZ(TL): 0.489 M - - Creep Factor: 2.0 Max TC CSI: 0.860 Max BC CSI: 0.997 Max Web CSI: 0.868 Wgt: 240.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A08 Truss Type COMN Qty 1 Ply 1 287001/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 18'0-11/16"1'10-5/8"18'0-11/16" 11'7-9/16"9'4-1/16"2'2-15/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"8"3'6-7/16"9'4-1/2"10'0-1/4"(a)(a)(a) A B C D E F G H I J K L M N OPQRS TUV W 6 12 3 12 3X6(A1) 3X4 4X8(R) 5X8 3X6 5X6 6X8 7X6 10X10 3X3 3X6 3X4 3X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4,T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 18.06 19.94 BC 80 0.15 11.49 BC 75 11.48 23.07 BC 25 20.97 23.07 BC 83 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /875 /555 /300 K 1543 /- /- /870 /559 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 K Brg Width = 8.0 Min Req = 1.5 Bearings B & K are a rigid surface. Bearings B & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 955 -2670 C - D 1034 -2643 D - E 1161 -2684 E - F 1186 -2642 F - G 825 -1632 Chords Tens. Comp. G - H 1373 -3833 H - I 1347 -3882 I - J 1636 -4525 J - K 1561 -4660 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 2302 -730 V - U 69 -38 T - S 1632 -386 S - Q 1 -6 Chords Tens. Comp. R - P 2 -7 Q - O 8 -5 N - M 4037 -1228 M - K 4172 -1294 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 183 -346 C - T 93 -47 V - T 2267 -702 D - T 266 -344 T - U 51 0 T - F 1102 -506 F - S 241 -192 S - G 438 -1475 S - N 2279 -511 Webs Tens. Comp. G - N 3402 -944 R - Q 39 0 N - O 0 -43 N - I 377 -593 O - P 32 0 W - N 0 0 I - M 397 -165 M - J 204 -237 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.426 N 999 360 VERT(CL): 0.804 N 563 240 HORZ(LL): 0.259 M - - HORZ(TL): 0.489 M - - Creep Factor: 2.0 Max TC CSI: 0.860 Max BC CSI: 0.997 Max Web CSI: 0.868 Wgt: 240.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A08 Truss Type COMN Qty 1 Ply 1 287001/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 18'0-11/16"1'10-5/8"18'0-11/16" 11'7-9/16"9'4-1/16"2'2-15/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"8"3'6-7/16"9'4-1/2"10'0-1/4"(a)(a)(a) A B C D E F G H I J K L M N OPQRS TUV W 6 12 3 12 3X6(A1) 3X4 4X8(R) 5X8 3X6 5X6 6X8 7X6 10X10 3X3 3X6 3X4 3X4 3X8(F1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4 2x4 SP M-30; T5 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; W9, W10 2x4 SP M-30; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 16.06 21.94 BC 75 0.15 11.49 BC 120 11.48 23.07 BC 25 20.97 23.07 BC 80 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /877 /558 /272 J 1543 /- /- /872 /561 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1091 -2674 C - D 1181 -2634 D - E 1278 -2631 E - F 1293 -2589 Chords Tens. Comp. F - G 998 -1840 G - H 1608 -3801 H - I 1592 -3947 I - J 1854 -4747 J - K 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2306 -852 U - T 64 -51 S - Q 1806 -605 R - O 0 -64 Chords Tens. Comp. Q - P 1846 -599 P - N 89 -1 M - L 4310 -1594 L - J 4262 -1569 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 207 -350 C - S 123 -77 U - S 2277 -811 D - S 199 -244 S - T 51 0 S - F 927 -395 F - P 262 -156 R - Q 41 0 Webs Tens. Comp. P - G 1628 -4498 P - M 5025 -1608 G - M 5939 -2012 M - N 0 -255 M - I 484 -849 N - O 43 0 V - M 0 0 I - L 146 -78 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.553 M 819 360 VERT(CL): 1.043 M 433 240 HORZ(LL): 0.376 L - - HORZ(TL): 0.710 L - - Creep Factor: 2.0 Max TC CSI: 0.960 Max BC CSI: 0.965 Max Web CSI: 0.939 Wgt: 231.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A09 Truss Type COMN Qty 1 Ply 1 287101/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 16'0-11/16"5'10-5/8"16'0-11/16" 11'7-9/16"9'4-1/16"2'2-15/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"8"3'6-7/16"8'4-1/2"9'0-1/4"(a) (a) (a) A B C D E F G H I J K L M NOPQR STU V 6 12 3 12 3X6(A1) 3X4 4X8(R) 5X8 3X6 5X6 7X10(R) 8X10 12X14 3X3 4X6 3X4 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T4 2x4 SP M-30; T5 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; B4 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W8 2x4 SP #2; W9, W10 2x4 SP M-30; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 16.06 21.94 BC 75 0.15 11.49 BC 120 11.48 23.07 BC 25 20.97 23.07 BC 80 23.07 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /877 /558 /272 J 1543 /- /- /872 /561 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 J Brg Width = 8.0 Min Req = 1.5 Bearings B & J are a rigid surface. Bearings B & J require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1091 -2674 C - D 1181 -2634 D - E 1278 -2631 E - F 1293 -2589 Chords Tens. Comp. F - G 998 -1840 G - H 1608 -3801 H - I 1592 -3947 I - J 1854 -4747 J - K 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - U 2306 -852 U - T 64 -51 S - Q 1806 -605 R - O 0 -64 Chords Tens. Comp. Q - P 1846 -599 P - N 89 -1 M - L 4310 -1594 L - J 4262 -1569 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - U 207 -350 C - S 123 -77 U - S 2277 -811 D - S 199 -244 S - T 51 0 S - F 927 -395 F - P 262 -156 R - Q 41 0 Webs Tens. Comp. P - G 1628 -4498 P - M 5025 -1608 G - M 5939 -2012 M - N 0 -255 M - I 484 -849 N - O 43 0 V - M 0 0 I - L 146 -78 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.553 M 819 360 VERT(CL): 1.043 M 433 240 HORZ(LL): 0.376 L - - HORZ(TL): 0.710 L - - Creep Factor: 2.0 Max TC CSI: 0.960 Max BC CSI: 0.965 Max Web CSI: 0.939 Wgt: 231.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A09 Truss Type COMN Qty 1 Ply 1 287101/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 16'0-11/16"5'10-5/8"16'0-11/16" 11'7-9/16"9'4-1/16"2'2-15/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"8"3'6-7/16"8'4-1/2"9'0-1/4"(a) (a) (a) A B C D E F G H I J K L M NOPQR STU V 6 12 3 12 3X6(A1) 3X4 4X8(R) 5X8 3X6 5X6 7X10(R) 8X10 12X14 3X3 4X6 3X4 3X8(F1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 14.06 23.94 BC 99 0.15 11.49 BC 120 11.50 23.94 BC 75 20.97 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 967 /- /- /585 /407 /243 W* 117 /- /- /57 /35 /- K 457 /- /- /336 /216 /- N /-104 Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 W Brg Width = 171 Min Req = - K Brg Width = 8.0 Min Req = 1.5 Bearings B, W, & K are a rigid surface. Bearings B, W, & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1051 -1449 C - D 1030 -1172 D - E 1041 -1112 E - F 910 -847 F - G 869 -734 Chords Tens. Comp. G - H 392 -86 H - I 355 -95 I - J 332 -101 J - K 281 -304 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 1216 -806 V - U 44 -26 T - S 977 -615 S - Q 446 -263 R - O 31 -111 Chords Tens. Comp. Q - P 518 -293 O - N 186 -76 N - M 186 -76 M - K 183 -69 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 192 -123 C - T 247 -285 V - T 1190 -791 T - U 45 0 T - E 439 -307 E - S 510 -540 F - S 183 -175 Webs Tens. Comp. S - G 503 -202 G - P 654 -953 R - Q 6 -33 P - O 591 -1117 P - H 131 -339 O - J 239 -360 J - M 347 -204 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.088 Q 999 360 VERT(CL): 0.195 Q 999 240 HORZ(LL): 0.017 Q - - HORZ(TL): 0.033 Q - - Creep Factor: 2.0 Max TC CSI: 0.858 Max BC CSI: 0.999 Max Web CSI: 0.476 Wgt: 221.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A10 Truss Type SPEC Qty 1 Ply 1 287201/20/2021 23'0-3/8"14'3-5/8"8"SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ. 14'0-11/16"9'10-5/8"14'0-11/16" 11'7-9/16"9'4-1/16"17'0-3/8"1'5-9/16"1'5-9/16" 38' 4-3/16"8"7'4-1/2"8'0-1/4"(a) (a) A B C D E F G H I J K L MNOP QRS TUV W 6 12 3X6(A1) 4X4 3X6 5X6 1.5X3 5X6 3X8 1.5X3 1.5X3 4X6(R) 5X6 3X6 3X6 1.5X3 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 14.06 23.94 BC 99 0.15 11.49 BC 120 11.50 23.94 BC 75 20.97 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 967 /- /- /585 /407 /243 W* 117 /- /- /57 /35 /- K 457 /- /- /336 /216 /- N /-104 Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 W Brg Width = 171 Min Req = - K Brg Width = 8.0 Min Req = 1.5 Bearings B, W, & K are a rigid surface. Bearings B, W, & K require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 1051 -1449 C - D 1030 -1172 D - E 1041 -1112 E - F 910 -847 F - G 869 -734 Chords Tens. Comp. G - H 392 -86 H - I 355 -95 I - J 332 -101 J - K 281 -304 K - L 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - V 1216 -806 V - U 44 -26 T - S 977 -615 S - Q 446 -263 R - O 31 -111 Chords Tens. Comp. Q - P 518 -293 O - N 186 -76 N - M 186 -76 M - K 183 -69 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - V 192 -123 C - T 247 -285 V - T 1190 -791 T - U 45 0 T - E 439 -307 E - S 510 -540 F - S 183 -175 Webs Tens. Comp. S - G 503 -202 G - P 654 -953 R - Q 6 -33 P - O 591 -1117 P - H 131 -339 O - J 239 -360 J - M 347 -204 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.088 Q 999 360 VERT(CL): 0.195 Q 999 240 HORZ(LL): 0.017 Q - - HORZ(TL): 0.033 Q - - Creep Factor: 2.0 Max TC CSI: 0.858 Max BC CSI: 0.999 Max Web CSI: 0.476 Wgt: 221.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A10 Truss Type SPEC Qty 1 Ply 1 287201/20/2021 23'0-3/8"14'3-5/8"8"SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ. 14'0-11/16"9'10-5/8"14'0-11/16" 11'7-9/16"9'4-1/16"17'0-3/8"1'5-9/16"1'5-9/16" 38' 4-3/16"8"7'4-1/2"8'0-1/4"(a) (a) A B C D E F G H I J K L MNOP QRS TUV W 6 12 3X6(A1) 4X4 3X6 5X6 1.5X3 5X6 3X8 1.5X3 1.5X3 4X6(R) 5X6 3X6 3X6 1.5X3 3X6(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.56 25.44 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 852 /- /- /536 /317 /222 L 1858 /- /- /1043 /582 /- H 486 /- /- /517 /199 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 L Brg Width = 7.6 Min Req = 2.2 H Brg Width = 8.0 Min Req = 1.5 Bearings B, L, & H are a rigid surface. Bearings B, L, & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 730 -1231 C - D 516 -721 D - E 555 -563 Chords Tens. Comp. E - F 621 -290 F - G 465 -106 G - H 452 -513 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 1030 -535 P - O 1028 -536 O - N 214 -142 N - M 214 -142 Chords Tens. Comp. M - L 214 -142 L - K 448 -359 K - J 406 -271 J - H 414 -278 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - C 184 0 C - O 477 -535 D - O 126 -48 O - E 567 -362 E - L 955 -1188 Webs Tens. Comp. L - F 892 -830 K - G 722 -609 F - K 440 -567 G - J 355 -297 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.035 P 999 360 VERT(CL): 0.070 P 999 240 HORZ(LL): 0.012 J - - HORZ(TL): 0.024 L - - Creep Factor: 2.0 Max TC CSI: 0.925 Max BC CSI: 0.792 Max Web CSI: 0.702 Wgt: 205.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A11 Truss Type HIPS Qty 1 Ply 1 287301/20/2021 23'4-3/16"14'7-13/16" SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ. 12'6-11/16"12'10-5/8"12'6-11/16" 38'1'5-9/16"1'5-9/16" 4-3/16"6'7-1/2"7'3-1/4"(a) A B C D E F G H I JKLMNOP 6 12 3X6(A1) 1.5X3 3X4 5X6 3X8 3X6 3X4 3X6 4X6 5X6 3X4 3X4 1.5X3 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.56 25.44 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 852 /- /- /536 /317 /222 L 1858 /- /- /1043 /582 /- H 486 /- /- /517 /199 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 L Brg Width = 7.6 Min Req = 2.2 H Brg Width = 8.0 Min Req = 1.5 Bearings B, L, & H are a rigid surface. Bearings B, L, & H require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 730 -1231 C - D 516 -721 D - E 555 -563 Chords Tens. Comp. E - F 621 -290 F - G 465 -106 G - H 452 -513 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 1030 -535 P - O 1028 -536 O - N 214 -142 N - M 214 -142 Chords Tens. Comp. M - L 214 -142 L - K 448 -359 K - J 406 -271 J - H 414 -278 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. P - C 184 0 C - O 477 -535 D - O 126 -48 O - E 567 -362 E - L 955 -1188 Webs Tens. Comp. L - F 892 -830 K - G 722 -609 F - K 440 -567 G - J 355 -297 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.035 P 999 360 VERT(CL): 0.070 P 999 240 HORZ(LL): 0.012 J - - HORZ(TL): 0.024 L - - Creep Factor: 2.0 Max TC CSI: 0.925 Max BC CSI: 0.792 Max Web CSI: 0.702 Wgt: 205.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A11 Truss Type HIPS Qty 1 Ply 1 287301/20/2021 23'4-3/16"14'7-13/16" SEAT PLATE REQ. SEAT PLATE REQ. SEAT PLATE REQ. 12'6-11/16"12'10-5/8"12'6-11/16" 38'1'5-9/16"1'5-9/16" 4-3/16"6'7-1/2"7'3-1/4"(a) A B C D E F G H I JKLMNOP 6 12 3X6(A1) 1.5X3 3X4 5X6 3X8 3X6 3X4 3X6 4X6 5X6 3X4 3X4 1.5X3 3X6(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B3 2x4 SP M-30; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.40 11.06 TC 24 11.06 26.94 TC 24 26.94 39.40 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Additional Notes See A1 Std Detail for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B* 107 /- /- /53 /37 /9 R 640 /- /- /615 /248 /- Wind reactions based on MWFRS B Brg Width = 284 Min Req = - R Brg Width = 8.0 Min Req = 1.5 Bearings B & R are a rigid surface. Bearings B & R require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 0 B - C 72 -56 C - D 141 -149 D - E 143 -83 E - F 146 -6 F - G 143 -5 G - H 141 -5 H - I 141 -5 I - J 141 -5 Chords Tens. Comp. J - K 141 -5 K - L 141 -5 L - M 141 -5 M - N 137 -5 N - O 137 -5 O - P 540 -357 P - Q 514 -389 Q - R 743 -750 R - S 40 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AH 155 -65 AH-AG 157 -65 AG-AF 299 -116 AF-AE 302 -118 AE-AD 305 -119 AD-AC 305 -118 AC-AB 305 -118 AB-AA 305 -118 Chords Tens. Comp. AA- Z 334 -161 Z - Y 334 -161 Y - X 334 -161 X - W 334 -161 W - V 334 -161 V - U 260 -162 U - T 260 -162 T - R 615 -517 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C -AG 206 -102 V -AI 639 -610 AI- U 128 -101 N -AJ 123 -109 Webs Tens. Comp. AJ- O 647 -634 T -AK 498 -450 AK- Q 461 -419 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. AH- C 0 -60 AG- D 125 -117 E -AF 154 -126 F -AE 235 -147 AD- G 68 -158 Gables Tens. Comp. J - Z 126 -129 K - Y 129 -131 L - X 118 -114 M - V 189 -161 O - T 675 -692 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.038 P 999 360 VERT(CL): 0.068 P 999 240 HORZ(LL): 0.016 P - - HORZ(TL): 0.020 P - - Creep Factor: 2.0 Max TC CSI: 0.557 Max BC CSI: 0.606 Max Web CSI: 0.693 Wgt: 238.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A12GE Truss Type GABL Qty 1 Ply 1 287401/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 11'0-11/16"15'10-5/8"11'0-11/16" 1'5-9/16"1'5-9/16" 4-3/16"5'10-1/2"6'6-1/4"A B C D E F G H I J K L M N O P Q R S TUVWXYZAAABACADAEAFAGAH AIAJ AK 6 12 3X6(A1) 3X4 3X4 5X6 3X6 3X6 3X4 5X6 3X4 3X6(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B3 2x4 SP M-30; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.40 11.06 TC 24 11.06 26.94 TC 24 26.94 39.40 BC 75 0.15 37.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. Additional Notes See A1 Std Detail for gable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B* 107 /- /- /53 /37 /9 R 640 /- /- /615 /248 /- Wind reactions based on MWFRS B Brg Width = 284 Min Req = - R Brg Width = 8.0 Min Req = 1.5 Bearings B & R are a rigid surface. Bearings B & R require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 0 B - C 72 -56 C - D 141 -149 D - E 143 -83 E - F 146 -6 F - G 143 -5 G - H 141 -5 H - I 141 -5 I - J 141 -5 Chords Tens. Comp. J - K 141 -5 K - L 141 -5 L - M 141 -5 M - N 137 -5 N - O 137 -5 O - P 540 -357 P - Q 514 -389 Q - R 743 -750 R - S 40 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B -AH 155 -65 AH-AG 157 -65 AG-AF 299 -116 AF-AE 302 -118 AE-AD 305 -119 AD-AC 305 -118 AC-AB 305 -118 AB-AA 305 -118 Chords Tens. Comp. AA- Z 334 -161 Z - Y 334 -161 Y - X 334 -161 X - W 334 -161 W - V 334 -161 V - U 260 -162 U - T 260 -162 T - R 615 -517 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C -AG 206 -102 V -AI 639 -610 AI- U 128 -101 N -AJ 123 -109 Webs Tens. Comp. AJ- O 647 -634 T -AK 498 -450 AK- Q 461 -419 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. AH- C 0 -60 AG- D 125 -117 E -AF 154 -126 F -AE 235 -147 AD- G 68 -158 Gables Tens. Comp. J - Z 126 -129 K - Y 129 -131 L - X 118 -114 M - V 189 -161 O - T 675 -692 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.80 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.038 P 999 360 VERT(CL): 0.068 P 999 240 HORZ(LL): 0.016 P - - HORZ(TL): 0.020 P - - Creep Factor: 2.0 Max TC CSI: 0.557 Max BC CSI: 0.606 Max Web CSI: 0.693 Wgt: 238.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A12GE Truss Type GABL Qty 1 Ply 1 287401/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 11'0-11/16"15'10-5/8"11'0-11/16" 1'5-9/16"1'5-9/16" 4-3/16"5'10-1/2"6'6-1/4"A B C D E F G H I J K L M N O P Q R S TUVWXYZAAABACADAEAFAGAH AIAJ AK 6 12 3X6(A1) 3X4 3X4 5X6 3X6 3X6 3X4 5X6 3X4 3X6(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 H -AC 136 -142 I -AB 125 -127 P -AK 119 -61 Truss A12GE Truss Type GABL Qty 1 Ply 1 287401/20/2021 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP M-30; Bot chord: 2x4 SP M-30; B2 2x4 SP #2; B3 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W5 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 116 0.15 23.07 BC 96 23.10 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /873 /407 /314 I 1543 /- /- /868 /411 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 I Brg Width = 8.0 Min Req = 1.5 Bearings B & I are a rigid surface. Bearings B & I require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 930 -2686 C - D 892 -2411 D - E 755 -1699 E - F 1398 -3949 Chords Tens. Comp. F - G 1253 -3859 G - H 1243 -4004 H - I 1473 -4711 I - J 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 2327 -707 P - O 1885 -494 O - N 1885 -494 Chords Tens. Comp. N - M 14 -5 L - K 4274 -1237 K - I 4226 -1217 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - P 248 -362 P - D 493 -105 D - N 351 -657 E - N 45 -706 E - L 3525 -995 Webs Tens. Comp. N - L 1927 -339 L - M 28 -12 L - F 289 -366 L - H 365 -611 H - K 139 -79 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.420 F 999 360 VERT(CL): 0.793 F 570 240 HORZ(LL): 0.253 K - - HORZ(TL): 0.477 K - - Creep Factor: 2.0 Max TC CSI: 0.654 Max BC CSI: 0.992 Max Web CSI: 0.845 Wgt: 210.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A13 Truss Type COMN Qty 1 Ply 1 287501/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 23'2-9/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"3'6-7/16"9'10-3/16"10'5-15/16"(a) (a) A B C D E F G H I J K L MNOP 6 12 3 12 3X6(A1) 1.5X3 3X4 5X6 3X6 6X10 5X8 8X10 1.5X3 1.5X3 3X6 3X4 1.5X3 3X8(F1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T3,T4 2x4 SP M-30; Bot chord: 2x4 SP M-30; B2 2x4 SP #2; B3 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W5 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 116 0.15 23.07 BC 96 23.10 37.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1539 /- /- /873 /407 /314 I 1543 /- /- /868 /411 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.8 I Brg Width = 8.0 Min Req = 1.5 Bearings B & I are a rigid surface. Bearings B & I require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 930 -2686 C - D 892 -2411 D - E 755 -1699 E - F 1398 -3949 Chords Tens. Comp. F - G 1253 -3859 G - H 1243 -4004 H - I 1473 -4711 I - J 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - P 2327 -707 P - O 1885 -494 O - N 1885 -494 Chords Tens. Comp. N - M 14 -5 L - K 4274 -1237 K - I 4226 -1217 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - P 248 -362 P - D 493 -105 D - N 351 -657 E - N 45 -706 E - L 3525 -995 Webs Tens. Comp. N - L 1927 -339 L - M 28 -12 L - F 289 -366 L - H 365 -611 H - K 139 -79 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.80 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.420 F 999 360 VERT(CL): 0.793 F 570 240 HORZ(LL): 0.253 K - - HORZ(TL): 0.477 K - - Creep Factor: 2.0 Max TC CSI: 0.654 Max BC CSI: 0.992 Max Web CSI: 0.845 Wgt: 210.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss A13 Truss Type COMN Qty 1 Ply 1 287501/20/2021 38' SEAT PLATE REQ. SEAT PLATE REQ. 19'19' 23'2-9/16"14'9-7/16"1'5-9/16"1'5-9/16" 4-3/16"3'6-7/16"9'10-3/16"10'5-15/16"(a) (a) A B C D E F G H I J K L MNOP 6 12 3 12 3X6(A1) 1.5X3 3X4 5X6 3X6 6X10 5X8 8X10 1.5X3 1.5X3 3X6 3X4 1.5X3 3X8(F1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.46 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.00 TC: 290 lb Conc. Load at 7.03 TC: 189 lb Conc. Load at 9.06,11.06 BC: 406 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,11.06 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.00 BC 89 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 906 /- /- /- /435 /- E 1198 /- /- /- /579 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 -25 B - C 616 -1290 Chords Tens. Comp. C - D 11 -20 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 1061 -490 Chords Tens. Comp. F - E 1086 -493 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 610 -87 C - E 592 -1307 Webs Tens. Comp. D - E 250 -320 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023 F 999 360 VERT(CL): 0.043 F 999 240 HORZ(LL): 0.010 E - - HORZ(TL): 0.019 E - - Creep Factor: 2.0 Max TC CSI: 0.862 Max BC CSI: 0.980 Max Web CSI: 0.856 Wgt: 57.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss B01G Truss Type HIPM Qty 1 Ply 1 290201/20/2021 12' SEAT PLATE REQ. SEAT PLATE REQ. 7'5' 1'5-9/16" 4-3/16"3'10-3/16"4'5-15/16"A B C D EF 6 12 2X4(A1) 6X6 2X4 3X6 3X6(R) 7'0-3/8" 406# 290# 2'0-3/8" 109# 189# 2' 109# 189# 11-1/4" **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.46 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.00 TC: 290 lb Conc. Load at 7.03 TC: 189 lb Conc. Load at 9.06,11.06 BC: 406 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,11.06 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.00 BC 89 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 906 /- /- /- /435 /- E 1198 /- /- /- /579 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 -25 B - C 616 -1290 Chords Tens. Comp. C - D 11 -20 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 1061 -490 Chords Tens. Comp. F - E 1086 -493 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 610 -87 C - E 592 -1307 Webs Tens. Comp. D - E 250 -320 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023 F 999 360 VERT(CL): 0.043 F 999 240 HORZ(LL): 0.010 E - - HORZ(TL): 0.019 E - - Creep Factor: 2.0 Max TC CSI: 0.862 Max BC CSI: 0.980 Max Web CSI: 0.856 Wgt: 57.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss B01G Truss Type HIPM Qty 1 Ply 1 290201/20/2021 12' SEAT PLATE REQ. SEAT PLATE REQ. 7'5' 1'5-9/16" 4-3/16"3'10-3/16"4'5-15/16"A B C D EF 6 12 2X4(A1) 6X6 2X4 3X6 3X6(R) 7'0-3/8" 406# 290# 2'0-3/8" 109# 189# 2' 109# 189# 11-1/4" Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 :SP 2400f-2.0E + SP M-31:; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 12.00 BC 110 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 557 /- /- /366 /203 /265 E 446 /- /- /256 /236 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 153 -416 Chords Tens. Comp. C - D 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 256 -282 Chords Tens. Comp. F - E 262 -284 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 310 -44 C - E 515 -476 Webs Tens. Comp. D - E 161 -92 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.037 F 999 360 VERT(CL): 0.068 F 999 240 HORZ(LL): 0.023 F - - HORZ(TL): 0.043 F - - Creep Factor: 2.0 Max TC CSI: 0.608 Max BC CSI: 0.986 Max Web CSI: 0.254 Wgt: 58.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss B02 Truss Type HIPM Qty 1 Ply 1 287601/20/2021 12' SEAT PLATE REQ. SEAT PLATE REQ. 9'3' 1'5-9/16" 4-3/16"4'10-3/16"5'5-15/16"A B C D EF 6 12 2X4(A1) 5X6 1.5X3 1.5X3 3X6(R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 :SP 2400f-2.0E + SP M-31:; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 12.00 BC 110 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 557 /- /- /366 /203 /265 E 446 /- /- /256 /236 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 153 -416 Chords Tens. Comp. C - D 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 256 -282 Chords Tens. Comp. F - E 262 -284 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - F 310 -44 C - E 515 -476 Webs Tens. Comp. D - E 161 -92 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.037 F 999 360 VERT(CL): 0.068 F 999 240 HORZ(LL): 0.023 F - - HORZ(TL): 0.043 F - - Creep Factor: 2.0 Max TC CSI: 0.608 Max BC CSI: 0.986 Max Web CSI: 0.254 Wgt: 58.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss B02 Truss Type HIPM Qty 1 Ply 1 287601/20/2021 12' SEAT PLATE REQ. SEAT PLATE REQ. 9'3' 1'5-9/16" 4-3/16"4'10-3/16"5'5-15/16"A B C D EF 6 12 2X4(A1) 5X6 1.5X3 1.5X3 3X6(R) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 119 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 557 /- /- /363 /168 /343 E 446 /- /- /299 /268 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 136 -620 Chords Tens. Comp. C - D 59 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 490 -395 Chords Tens. Comp. F - E 487 -396 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. F - C 239 0 C - E 458 -565 Webs Tens. Comp. D - E 168 -132 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010 F 999 360 VERT(CL): 0.020 F 999 240 HORZ(LL): 0.005 E - - HORZ(TL): 0.008 E - - Creep Factor: 2.0 Max TC CSI: 0.569 Max BC CSI: 0.984 Max Web CSI: 0.435 Wgt: 60.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss B03 Truss Type MONO Qty 2 Ply 1 287701/20/2021 12' SEAT PLATE REQ. SEAT PLATE REQ. 1'5-9/16" 4-3/16"6'4-3/16"6'11-15/16"A B C D EF 6 12 2X4(A1) 1.5X3 3X4 1.5X3 3X6(R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 119 0.15 12.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 557 /- /- /363 /168 /343 E 446 /- /- /299 /268 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 136 -620 Chords Tens. Comp. C - D 59 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - F 490 -395 Chords Tens. Comp. F - E 487 -396 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. F - C 239 0 C - E 458 -565 Webs Tens. Comp. D - E 168 -132 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.010 F 999 360 VERT(CL): 0.020 F 999 240 HORZ(LL): 0.005 E - - HORZ(TL): 0.008 E - - Creep Factor: 2.0 Max TC CSI: 0.569 Max BC CSI: 0.984 Max Web CSI: 0.435 Wgt: 60.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss B03 Truss Type MONO Qty 2 Ply 1 287701/20/2021 12' SEAT PLATE REQ. SEAT PLATE REQ. 1'5-9/16" 4-3/16"6'4-3/16"6'11-15/16"A B C D EF 6 12 2X4(A1) 1.5X3 3X4 1.5X3 3X6(R) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP M-30; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.46 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.33 TC: From 62 plf at 12.33 to 62 plf at 19.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.30 BC: From 14 plf at 12.30 to 14 plf at 19.00 TC: 290 lb Conc. Load at 7.03 TC: 189 lb Conc. Load at 9.06,10.27 TC: 327 lb Conc. Load at 12.30 BC: 406 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,10.27 BC: 377 lb Conc. Load at 12.30 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.33 BC 74 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1700 /- /- /- /818 /- E 1631 /- /- /- /773 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 2.0 E Brg Width = 4.0 Min Req = 1.9 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 -25 B - C 1479 -3047 Chords Tens. Comp. C - D 1249 -2619 D - E 1456 -2985 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 2644 -1272 H - G 2668 -1275 Chords Tens. Comp. G - F 2668 -1275 F - E 2575 -1246 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 582 -78 C - F 32 -60 Webs Tens. Comp. F - D 529 -36 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.106 F 999 360 VERT(CL): 0.197 F 999 240 HORZ(LL): 0.049 F - - HORZ(TL): 0.092 F - - Creep Factor: 2.0 Max TC CSI: 0.885 Max BC CSI: 0.996 Max Web CSI: 0.222 Wgt: 81.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C01G Truss Type HIPS Qty 1 Ply 1 290301/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 7'5'4"6'8" 1'5-9/16" 4-3/16"6-3/16"3'10-3/16"4'5-15/16"A B C D E FGH 6 12 4X6(A2) 5X8 2X4 H0308 3X4 5X6 4X6(B2) 7'0-3/8" 406# 290# 2'0-3/8" 109# 189# 1'2-1/2" 109# 189# 2'0-3/8" 377# 327# 6'8-3/8" **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP M-30; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 62 plf at -1.46 to 62 plf at 7.00 TC: From 31 plf at 7.00 to 31 plf at 12.33 TC: From 62 plf at 12.33 to 62 plf at 19.00 BC: From 14 plf at 0.00 to 14 plf at 7.03 BC: From 7 plf at 7.03 to 7 plf at 12.30 BC: From 14 plf at 12.30 to 14 plf at 19.00 TC: 290 lb Conc. Load at 7.03 TC: 189 lb Conc. Load at 9.06,10.27 TC: 327 lb Conc. Load at 12.30 BC: 406 lb Conc. Load at 7.03 BC: 109 lb Conc. Load at 9.06,10.27 BC: 377 lb Conc. Load at 12.30 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 7.00 12.33 BC 74 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1700 /- /- /- /818 /- E 1631 /- /- /- /773 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 2.0 E Brg Width = 4.0 Min Req = 1.9 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 -25 B - C 1479 -3047 Chords Tens. Comp. C - D 1249 -2619 D - E 1456 -2985 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 2644 -1272 H - G 2668 -1275 Chords Tens. Comp. G - F 2668 -1275 F - E 2575 -1246 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 582 -78 C - F 32 -60 Webs Tens. Comp. F - D 529 -36 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.106 F 999 360 VERT(CL): 0.197 F 999 240 HORZ(LL): 0.049 F - - HORZ(TL): 0.092 F - - Creep Factor: 2.0 Max TC CSI: 0.885 Max BC CSI: 0.996 Max Web CSI: 0.222 Wgt: 81.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C01G Truss Type HIPS Qty 1 Ply 1 290301/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 7'5'4"6'8" 1'5-9/16" 4-3/16"6-3/16"3'10-3/16"4'5-15/16"A B C D E FGH 6 12 4X6(A2) 5X8 2X4 H0308 3X4 5X6 4X6(B2) 7'0-3/8" 406# 290# 2'0-3/8" 109# 189# 1'2-1/2" 109# 189# 2'0-3/8" 377# 327# 6'8-3/8" Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 10.33 BC 82 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 818 /- /- /471 /359 /142 E 720 /- /- /379 /303 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 560 -1032 Chords Tens. Comp. C - D 605 -825 D - E 565 -1034 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 822 -374 H - G 825 -372 Chords Tens. Comp. G - F 825 -372 F - E 822 -373 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 240 -90 Webs Tens. Comp. F - D 237 -83 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.028 H 999 360 VERT(CL): 0.072 H 999 240 HORZ(LL): 0.016 H - - HORZ(TL): 0.040 H - - Creep Factor: 2.0 Max TC CSI: 0.726 Max BC CSI: 0.985 Max Web CSI: 0.092 Wgt: 75.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C02 Truss Type HIPS Qty 1 Ply 1 287801/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 9'1'4"8'8" 1'5-9/16" 4-3/16"6-3/16"4'10-3/16"5'5-15/16"A B C D E FGH 6 12 2X4(A1) 5X6(R) 1.5X3 4X4 1.5X3 5X6(R) 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.00 10.33 BC 82 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 818 /- /- /471 /359 /142 E 720 /- /- /379 /303 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 4.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 560 -1032 Chords Tens. Comp. C - D 605 -825 D - E 565 -1034 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 822 -374 H - G 825 -372 Chords Tens. Comp. G - F 825 -372 F - E 822 -373 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 240 -90 Webs Tens. Comp. F - D 237 -83 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.028 H 999 360 VERT(CL): 0.072 H 999 240 HORZ(LL): 0.016 H - - HORZ(TL): 0.040 H - - Creep Factor: 2.0 Max TC CSI: 0.726 Max BC CSI: 0.985 Max Web CSI: 0.092 Wgt: 75.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C02 Truss Type HIPS Qty 1 Ply 1 287801/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 9'1'4"8'8" 1'5-9/16" 4-3/16"6-3/16"4'10-3/16"5'5-15/16"A B C D E FGH 6 12 2X4(A1) 5X6(R) 1.5X3 4X4 1.5X3 5X6(R) 3X4(B1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 103 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 818 /- /- /469 /358 /151 F 720 /- /- /377 /302 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 4.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 599 -1179 C - D 467 -869 Chords Tens. Comp. D - E 472 -867 E - F 597 -1160 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 1001 -477 Chords Tens. Comp. G - F 976 -455 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 293 -325 D - G 479 -189 Webs Tens. Comp. G - E 289 -296 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.038 G 999 360 VERT(CL): 0.071 G 999 240 HORZ(LL): 0.017 G - - HORZ(TL): 0.033 G - - Creep Factor: 2.0 Max TC CSI: 0.272 Max BC CSI: 0.978 Max Web CSI: 0.183 Wgt: 85.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C03 Truss Type SPEC Qty 1 Ply 1 287901/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 9'8"9'4" 1'5-9/16" 4-3/16"6-3/16"5'2-3/16"5'9-15/16"A B C D E F G 6 12 2X4(A1) 1.5X3 4X4 5X6 1.5X3 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 103 0.15 18.79 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 818 /- /- /469 /358 /151 F 720 /- /- /377 /302 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 4.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 599 -1179 C - D 467 -869 Chords Tens. Comp. D - E 472 -867 E - F 597 -1160 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 1001 -477 Chords Tens. Comp. G - F 976 -455 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - G 293 -325 D - G 479 -189 Webs Tens. Comp. G - E 289 -296 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.038 G 999 360 VERT(CL): 0.071 G 999 240 HORZ(LL): 0.017 G - - HORZ(TL): 0.033 G - - Creep Factor: 2.0 Max TC CSI: 0.272 Max BC CSI: 0.978 Max Web CSI: 0.183 Wgt: 85.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C03 Truss Type SPEC Qty 1 Ply 1 287901/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 9'8"9'4" 1'5-9/16" 4-3/16"6-3/16"5'2-3/16"5'9-15/16"A B C D E F G 6 12 2X4(A1) 1.5X3 4X4 5X6 1.5X3 3X4(B1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.00 19.00 BC 116 0.15 19.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 822 /- /- /520 /159 /242 F 716 /- /- /389 /262 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 4.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 531 -1152 Chords Tens. Comp. C - D 406 -682 D - E 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 956 -689 I - H 954 -690 Chords Tens. Comp. H - G 954 -690 G - F 529 -405 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - C 195 0 C - G 347 -517 D - G 440 -135 Webs Tens. Comp. D - F 535 -699 E - F 312 -218 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030 I 999 360 VERT(CL): 0.057 I 999 240 HORZ(LL): 0.012 F - - HORZ(TL): 0.023 F - - Creep Factor: 2.0 Max TC CSI: 0.588 Max BC CSI: 0.982 Max Web CSI: 0.393 Wgt: 105.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C04 Truss Type HIPM Qty 1 Ply 1 288001/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 12'7' 1'5-9/16" 4-3/16"6'4-3/16"6'11-15/16"(a) A B C D E FGHI 6 12 2X4(A1) 1.5X3 3X4 3X4 5X6 3X4 1.5X4 3X6(R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 12.00 19.00 BC 116 0.15 19.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 822 /- /- /520 /159 /242 F 716 /- /- /389 /262 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 F Brg Width = 4.0 Min Req = 1.5 Bearings B & F are a rigid surface. Bearings B & F require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 531 -1152 Chords Tens. Comp. C - D 406 -682 D - E 0 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - I 956 -689 I - H 954 -690 Chords Tens. Comp. H - G 954 -690 G - F 529 -405 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. I - C 195 0 C - G 347 -517 D - G 440 -135 Webs Tens. Comp. D - F 535 -699 E - F 312 -218 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.030 I 999 360 VERT(CL): 0.057 I 999 240 HORZ(LL): 0.012 F - - HORZ(TL): 0.023 F - - Creep Factor: 2.0 Max TC CSI: 0.588 Max BC CSI: 0.982 Max Web CSI: 0.393 Wgt: 105.0 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss C04 Truss Type HIPM Qty 1 Ply 1 288001/20/2021 19' SEAT PLATE REQ. SEAT PLATE REQ. 12'7' 1'5-9/16" 4-3/16"6'4-3/16"6'11-15/16"(a) A B C D E FGHI 6 12 2X4(A1) 1.5X3 3X4 3X4 5X6 3X4 1.5X4 3X6(R) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 64 plf at -1.46 to 64 plf at 5.00 TC: From 32 plf at 5.00 to 32 plf at 10.00 TC: From 64 plf at 10.00 to 64 plf at 16.46 BC: From 14 plf at 0.00 to 14 plf at 5.03 BC: From 7 plf at 5.03 to 7 plf at 9.97 BC: From 14 plf at 9.97 to 14 plf at 15.00 TC: 202 lb Conc. Load at 5.03, 9.97 TC: 127 lb Conc. Load at 7.06, 7.94 BC: 186 lb Conc. Load at 5.03, 9.97 BC: 77 lb Conc. Load at 7.06, 7.94 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.40 5.00 TC 24 5.00 10.00 TC 24 10.00 16.40 BC 62 0.15 14.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1175 /- /- /- /707 /- E 1175 /- /- /- /707 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -26 B - C 1263 -1979 C - D 1105 -1741 Chords Tens. Comp. D - E 1262 -1974 E - F 40 -26 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 1711 -1091 H - G 1727 -1098 Chords Tens. Comp. G - E 1707 -1090 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 295 -121 C - G 16 -7 Webs Tens. Comp. G - D 301 -125 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.63 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.055 G 999 360 VERT(CL): 0.097 G 999 240 HORZ(LL): -0.026 G - - HORZ(TL): 0.042 G - - Creep Factor: 2.0 Max TC CSI: 0.830 Max BC CSI: 0.974 Max Web CSI: 0.115 Wgt: 67.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss D01 Truss Type HIPS Qty 1 Ply 1 291101/20/2021 15' SEAT PLATE REQ. SEAT PLATE REQ. 5'5'5' 1'5-9/16"1'5-9/16" 4-3/16"2'10-3/16"3'5-15/16"A B C D E FGH 6 12 4X4(A2) 5X6 1.5X3 3X4 5X6 4X4(A2) 5'0-3/8" 186# 202# 2'0-3/8" 77# 127# 10-1/2" 77# 127# 2'0-3/8" 186# 202# 5'0-3/8" **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 64 plf at -1.46 to 64 plf at 5.00 TC: From 32 plf at 5.00 to 32 plf at 10.00 TC: From 64 plf at 10.00 to 64 plf at 16.46 BC: From 14 plf at 0.00 to 14 plf at 5.03 BC: From 7 plf at 5.03 to 7 plf at 9.97 BC: From 14 plf at 9.97 to 14 plf at 15.00 TC: 202 lb Conc. Load at 5.03, 9.97 TC: 127 lb Conc. Load at 7.06, 7.94 BC: 186 lb Conc. Load at 5.03, 9.97 BC: 77 lb Conc. Load at 7.06, 7.94 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 -1.40 5.00 TC 24 5.00 10.00 TC 24 10.00 16.40 BC 62 0.15 14.85 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 1175 /- /- /- /707 /- E 1175 /- /- /- /707 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 E Brg Width = 8.0 Min Req = 1.5 Bearings B & E are a rigid surface. Bearings B & E require a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -26 B - C 1263 -1979 C - D 1105 -1741 Chords Tens. Comp. D - E 1262 -1974 E - F 40 -26 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - H 1711 -1091 H - G 1727 -1098 Chords Tens. Comp. G - E 1707 -1090 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. C - H 295 -121 C - G 16 -7 Webs Tens. Comp. G - D 301 -125 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.8 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.63 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: No FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.055 G 999 360 VERT(CL): 0.097 G 999 240 HORZ(LL): -0.026 G - - HORZ(TL): 0.042 G - - Creep Factor: 2.0 Max TC CSI: 0.830 Max BC CSI: 0.974 Max Web CSI: 0.115 Wgt: 67.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss D01 Truss Type HIPS Qty 1 Ply 1 291101/20/2021 15' SEAT PLATE REQ. SEAT PLATE REQ. 5'5'5' 1'5-9/16"1'5-9/16" 4-3/16"2'10-3/16"3'5-15/16"A B C D E FGH 6 12 4X4(A2) 5X6 1.5X3 3X4 5X6 4X4(A2) 5'0-3/8" 186# 202# 2'0-3/8" 77# 127# 10-1/2" 77# 127# 2'0-3/8" 186# 202# 5'0-3/8" Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W3 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL O 482 /- /- /396 /197 /106 K 482 /- /- /293 /102 /- Wind reactions based on MWFRS O Brg Width = 3.5 Min Req = 1.5 K Brg Width = 3.5 Min Req = 1.5 Bearings O & K are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 106 -36 C - D 100 -18 D - E 151 -19 Chords Tens. Comp. E - F 157 -25 F - G 100 -31 G - H 106 -45 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - O 4 -2 O - N 108 -60 N - M 108 -60 Chords Tens. Comp. M - L 108 -60 L - K 108 -60 K - J 3 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 32 -13 B - O 240 -145 C - O 114 -94 O - Q 245 -240 Q - N 126 -55 D - R 148 -73 R - E 228 -228 E - M 142 -191 Webs Tens. Comp. E - S 142 -227 S - F 131 -73 L - T 102 -55 T - K 150 -240 K - G 132 -94 K - H 260 -149 H - J 40 -20 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.004 F 999 360 VERT(CL): 0.008 F 999 240 HORZ(LL): 0.002 F - - HORZ(TL): 0.004 D - - Creep Factor: 2.0 Max TC CSI: 0.218 Max BC CSI: 0.111 Max Web CSI: 0.145 Wgt: 96.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E01 Truss Type COMN Qty 1 Ply 1 288101/20/2021 1'4-1/2"6'11"1'4-1/2" 4'10"4'10" 9'8"1'5-9/16"1'5-9/16"2'4-3/16"4'9-3/16"A B C D E F G H I JKLMNOP Q R S T 6 12 3X4 1.5X3 1.5X3 3X10 1.5X3 1.5X3 1.5X3 1.5X3 4X8(R1) 1.5X3 1.5X3 1.5X3 1.5X3 1.5X3 3X10 1.5X3 3X4 1.5X3 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W3 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL O 482 /- /- /396 /197 /106 K 482 /- /- /293 /102 /- Wind reactions based on MWFRS O Brg Width = 3.5 Min Req = 1.5 K Brg Width = 3.5 Min Req = 1.5 Bearings O & K are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 106 -36 C - D 100 -18 D - E 151 -19 Chords Tens. Comp. E - F 157 -25 F - G 100 -31 G - H 106 -45 H - I 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. P - O 4 -2 O - N 108 -60 N - M 108 -60 Chords Tens. Comp. M - L 108 -60 L - K 108 -60 K - J 3 -2 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - P 32 -13 B - O 240 -145 C - O 114 -94 O - Q 245 -240 Q - N 126 -55 D - R 148 -73 R - E 228 -228 E - M 142 -191 Webs Tens. Comp. E - S 142 -227 S - F 131 -73 L - T 102 -55 T - K 150 -240 K - G 132 -94 K - H 260 -149 H - J 40 -20 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.004 F 999 360 VERT(CL): 0.008 F 999 240 HORZ(LL): 0.002 F - - HORZ(TL): 0.004 D - - Creep Factor: 2.0 Max TC CSI: 0.218 Max BC CSI: 0.111 Max Web CSI: 0.145 Wgt: 96.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E01 Truss Type COMN Qty 1 Ply 1 288101/20/2021 1'4-1/2"6'11"1'4-1/2" 4'10"4'10" 9'8"1'5-9/16"1'5-9/16"2'4-3/16"4'9-3/16"A B C D E F G H I JKLMNOP Q R S T 6 12 3X4 1.5X3 1.5X3 3X10 1.5X3 1.5X3 1.5X3 1.5X3 4X8(R1) 1.5X3 1.5X3 1.5X3 1.5X3 1.5X3 3X10 1.5X3 3X4 1.5X3 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL J 482 /- /- /396 /197 /106 I 482 /- /- /293 /102 /- Wind reactions based on MWFRS J Brg Width = 3.5 Min Req = 1.5 I Brg Width = 3.5 Min Req = 1.5 Bearings J & I are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 65 -36 C - D 201 -109 Chords Tens. Comp. D - E 189 -109 E - F 68 -65 F - G 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. K - J 53 -44 J - I 63 -61 Chords Tens. Comp. I - H 60 -58 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - K 163 -79 C - J 384 -370 Webs Tens. Comp. I - E 371 -370 F - H 97 -74 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.086 D 925 360 VERT(CL): 0.176 D 452 240 HORZ(LL): 0.197 F - - HORZ(TL): 0.234 F - - Creep Factor: 2.0 Max TC CSI: 0.605 Max BC CSI: 0.489 Max Web CSI: 0.256 Wgt: 54.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E02 Truss Type COMN Qty 3 Ply 1 288201/20/2021 1'4-1/2"6'11"1'4-1/2" 4'10"4'10" 9'8"1'5-9/16"1'5-9/16"2'4-3/16"4'9-3/16"A B C D E F G HIJK 6 12 1.5X3 1.5X3 1.5X3 1.5X3 3X4 1.5X3 1.5X3 1.5X3 1.5X3 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL J 482 /- /- /396 /197 /106 I 482 /- /- /293 /102 /- Wind reactions based on MWFRS J Brg Width = 3.5 Min Req = 1.5 I Brg Width = 3.5 Min Req = 1.5 Bearings J & I are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 B - C 65 -36 C - D 201 -109 Chords Tens. Comp. D - E 189 -109 E - F 68 -65 F - G 39 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. K - J 53 -44 J - I 63 -61 Chords Tens. Comp. I - H 60 -58 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - K 163 -79 C - J 384 -370 Webs Tens. Comp. I - E 371 -370 F - H 97 -74 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: > 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.086 D 925 360 VERT(CL): 0.176 D 452 240 HORZ(LL): 0.197 F - - HORZ(TL): 0.234 F - - Creep Factor: 2.0 Max TC CSI: 0.605 Max BC CSI: 0.489 Max Web CSI: 0.256 Wgt: 54.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E02 Truss Type COMN Qty 3 Ply 1 288201/20/2021 1'4-1/2"6'11"1'4-1/2" 4'10"4'10" 9'8"1'5-9/16"1'5-9/16"2'4-3/16"4'9-3/16"A B C D E F G HIJK 6 12 1.5X3 1.5X3 1.5X3 1.5X3 3X4 1.5X3 1.5X3 1.5X3 1.5X3 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W3 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 99 0.00 8.29 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL I 249 /- /- /186 /105 /80 G 474 /- /- /281 /106 /- Wind reactions based on MWFRS I Brg Width = 3.5 Min Req = 1.5 G Brg Width = 3.5 Min Req = 1.5 Bearings I & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 177 -100 B - C 165 -104 Chords Tens. Comp. C - D 49 -75 D - E 32 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. I - H 78 -51 H - G 78 -51 Chords Tens. Comp. G - F 78 -48 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - I 220 -159 B - H 134 -103 Webs Tens. Comp. G - C 334 -265 D - F 86 -78 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.084 H 985 360 VERT(CL): 0.164 B 503 240 HORZ(LL): 0.239 D - - HORZ(TL): 0.283 D - - Creep Factor: 2.0 Max TC CSI: 0.383 Max BC CSI: 0.378 Max Web CSI: 0.456 Wgt: 52.5 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E04 Truss Type SPEC Qty 1 Ply 1 288301/20/2021 6'11"1'4-1/2" 3'5-1/2"4'10" 8'3-1/2"1'5-9/16"3'0-7/16"2'4-3/16"4'9-3/16"A B C D E FGHI 6 12 3X3 3X6 4X4 1.5X3 1.5X3 1.5X3 3X3 2X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W3 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 99 0.00 8.29 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL I 249 /- /- /186 /105 /80 G 474 /- /- /281 /106 /- Wind reactions based on MWFRS I Brg Width = 3.5 Min Req = 1.5 G Brg Width = 3.5 Min Req = 1.5 Bearings I & G are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 177 -100 B - C 165 -104 Chords Tens. Comp. C - D 49 -75 D - E 32 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. I - H 78 -51 H - G 78 -51 Chords Tens. Comp. G - F 78 -48 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - I 220 -159 B - H 134 -103 Webs Tens. Comp. G - C 334 -265 D - F 86 -78 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.084 H 985 360 VERT(CL): 0.164 B 503 240 HORZ(LL): 0.239 D - - HORZ(TL): 0.283 D - - Creep Factor: 2.0 Max TC CSI: 0.383 Max BC CSI: 0.378 Max Web CSI: 0.456 Wgt: 52.5 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E04 Truss Type SPEC Qty 1 Ply 1 288301/20/2021 6'11"1'4-1/2" 3'5-1/2"4'10" 8'3-1/2"1'5-9/16"3'0-7/16"2'4-3/16"4'9-3/16"A B C D E FGHI 6 12 3X3 3X6 4X4 1.5X3 1.5X3 1.5X3 3X3 2X4 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing Fasten rated sheathing to one face of this frame. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 83 0.00 6.93 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL G 264 /- /- /129 /42 /52 E 288 /- /- /139 /44 /- Wind reactions based on MWFRS G Brg Width = 3.5 Min Req = 1.5 E Brg Width = 3.5 Min Req = 1.5 Bearings G & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 -108 B - C 155 -108 Chords Tens. Comp. C - D 10 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. G - F 42 -45 Chords Tens. Comp. F - E 42 -45 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - G 200 -167 B - F 146 -96 Webs Tens. Comp. C - E 224 -191 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.101 B 821 360 VERT(CL): 0.191 B 434 240 HORZ(LL): -0.131 A - - HORZ(TL): 0.197 A - - Creep Factor: 2.0 Max TC CSI: 0.353 Max BC CSI: 0.393 Max Web CSI: 0.376 Wgt: 39.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E05 Truss Type SPEC Qty 1 Ply 1 288401/20/2021 6'11" 3'5-1/2"3'5-5/8" 6'11-1/8"4-3/8"3'0-7/16"4'9-3/16"A B C D EFG 6 12 3X3 3X6 4X4 1.5X3 1.5X3 3X6 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing Fasten rated sheathing to one face of this frame. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 83 0.00 6.93 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL G 264 /- /- /129 /42 /52 E 288 /- /- /139 /44 /- Wind reactions based on MWFRS G Brg Width = 3.5 Min Req = 1.5 E Brg Width = 3.5 Min Req = 1.5 Bearings G & E are a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 156 -108 B - C 155 -108 Chords Tens. Comp. C - D 10 0 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. G - F 42 -45 Chords Tens. Comp. F - E 42 -45 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - G 200 -167 B - F 146 -96 Webs Tens. Comp. C - E 224 -191 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.101 B 821 360 VERT(CL): 0.191 B 434 240 HORZ(LL): -0.131 A - - HORZ(TL): 0.197 A - - Creep Factor: 2.0 Max TC CSI: 0.353 Max BC CSI: 0.393 Max Web CSI: 0.376 Wgt: 39.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E05 Truss Type SPEC Qty 1 Ply 1 288401/20/2021 6'11" 3'5-1/2"3'5-5/8" 6'11-1/8"4-3/8"3'0-7/16"4'9-3/16"A B C D EFG 6 12 3X3 3X6 4X4 1.5X3 1.5X3 3X6 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 90 0.00 7.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL J* 76 /- /- /50 /13 /7 K 55 /- /- /129 /105 /- Wind reactions based on MWFRS J Brg Width = 82.9 Min Req = - K Brg Width = 6.9 Min Req = 1.5 Bearings J & K are a rigid surface. Bearing K requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 57 -33 B - C 142 -33 Chords Tens. Comp. C - D 142 -33 D - E 58 -33 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 25 -25 I - H 25 -25 Chords Tens. Comp. H - G 25 -25 G - F 24 -24 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - J 65 -45 B - I 275 -141 C - H 20 -109 Webs Tens. Comp. G - D 275 -141 E - F 65 -44 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.002 D 999 360 VERT(CL): 0.005 B 999 240 HORZ(LL): -0.268 A - - HORZ(TL): 0.404 A - - Creep Factor: 2.0 Max TC CSI: 0.103 Max BC CSI: 0.282 Max Web CSI: 0.546 Wgt: 72.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E06 Truss Type COMN Qty 1 Ply 1 288501/20/2021 7'5-3/4" SEAT PLATE REQ. 3'8-7/8"3'8-7/8"6'2-3/4"8'1-3/16"A B C D E F GHI J K 6 12 4X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 90 0.00 7.48 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL J* 76 /- /- /50 /13 /7 K 55 /- /- /129 /105 /- Wind reactions based on MWFRS J Brg Width = 82.9 Min Req = - K Brg Width = 6.9 Min Req = 1.5 Bearings J & K are a rigid surface. Bearing K requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 57 -33 B - C 142 -33 Chords Tens. Comp. C - D 142 -33 D - E 58 -33 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. J - I 25 -25 I - H 25 -25 Chords Tens. Comp. H - G 25 -25 G - F 24 -24 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. A - J 65 -45 B - I 275 -141 C - H 20 -109 Webs Tens. Comp. G - D 275 -141 E - F 65 -44 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): -0.002 D 999 360 VERT(CL): 0.005 B 999 240 HORZ(LL): -0.268 A - - HORZ(TL): 0.404 A - - Creep Factor: 2.0 Max TC CSI: 0.103 Max BC CSI: 0.282 Max Web CSI: 0.546 Wgt: 72.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss E06 Truss Type COMN Qty 1 Ply 1 288501/20/2021 7'5-3/4" SEAT PLATE REQ. 3'8-7/8"3'8-7/8"6'2-3/4"8'1-3/16"A B C D E F GHI J K 6 12 4X4 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 0 plf at -1.98 to 61 plf at -0.10 TC: From 2 plf at -0.10 to 2 plf at 7.01 BC: From 2 plf at 0.00 to 2 plf at 7.01 TC: -25 lb Conc. Load at 1.46 TC: 129 lb Conc. Load at 4.29 BC: 10 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.01 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 245 /- /- /- /204 /- D 108 /- /- /- /45 /- C 74 /- /- /- /69 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 Chords Tens. Comp. B - C 48 -23 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.018 D - - HORZ(TL): 0.020 D - - Creep Factor: 2.0 Max TC CSI: 0.563 Max BC CSI: 0.435 Max Web CSI: 0.000 Wgt: 25.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss HJ5P Truss Type HIP_ Qty 2 Ply 1 289901/20/2021 SEAT PLATE REQ. 7'0-1/8"1'11-13/16" 4-3/16"2'9-7/8"3'5-7/16"A B C D 4.24 12 2X4(A1) 1'5-1/2" 10# -25# 2'9-15/16" 86# 129# 2'8-11/16" **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 0 plf at -1.98 to 61 plf at -0.10 TC: From 2 plf at -0.10 to 2 plf at 7.01 BC: From 2 plf at 0.00 to 2 plf at 7.01 TC: -25 lb Conc. Load at 1.46 TC: 129 lb Conc. Load at 4.29 BC: 10 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.01 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 245 /- /- /- /204 /- D 108 /- /- /- /45 /- C 74 /- /- /- /69 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 Chords Tens. Comp. B - C 48 -23 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.018 D - - HORZ(TL): 0.020 D - - Creep Factor: 2.0 Max TC CSI: 0.563 Max BC CSI: 0.435 Max Web CSI: 0.000 Wgt: 25.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss HJ5P Truss Type HIP_ Qty 2 Ply 1 289901/20/2021 SEAT PLATE REQ. 7'0-1/8"1'11-13/16" 4-3/16"2'9-7/8"3'5-7/16"A B C D 4.24 12 2X4(A1) 1'5-1/2" 10# -25# 2'9-15/16" 86# 129# 2'8-11/16" Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.98 to 61 plf at -0.10 TC: From 2 plf at -0.10 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -25 lb Conc. Load at 1.46 TC: 129 lb Conc. Load at 4.29 TC: 255 lb Conc. Load at 7.12 BC: 10 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 BC: 155 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 111 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 321 /- /- /- /266 /- E 297 /- /- /- /126 /- D 101 /- /- /- /72 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 435 -738 Chords Tens. Comp. C - D 46 -55 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 703 -391 G - F 692 -392 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 191 0 Webs Tens. Comp. C - F 414 -732 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023 G 999 360 VERT(CL): 0.043 G 999 240 HORZ(LL): 0.006 F - - HORZ(TL): 0.011 F - - Creep Factor: 2.0 Max TC CSI: 0.751 Max BC CSI: 1.000 Max Web CSI: 0.428 Wgt: 44.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss HJ7 Truss Type HIP_ Qty 2 Ply 1 290001/20/2021 SEAT PLATE REQ. 9'10-1/16"1'11-13/16" 4-3/16"3'9-7/8"4'5-7/16"A B C D EFG 4.24 12 2X4(A1) 1.5X3 3X4 4X4 1'5-1/2" 10# -25# 2'9-15/16" 86# 129# 2'9-15/16" 155# 255# 2'8-11/16" **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.98 to 61 plf at -0.10 TC: From 2 plf at -0.10 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -25 lb Conc. Load at 1.46 TC: 129 lb Conc. Load at 4.29 TC: 255 lb Conc. Load at 7.12 BC: 10 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 BC: 155 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 111 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 321 /- /- /- /266 /- E 297 /- /- /- /126 /- D 101 /- /- /- /72 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 435 -738 Chords Tens. Comp. C - D 46 -55 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 703 -391 G - F 692 -392 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 191 0 Webs Tens. Comp. C - F 414 -732 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.023 G 999 360 VERT(CL): 0.043 G 999 240 HORZ(LL): 0.006 F - - HORZ(TL): 0.011 F - - Creep Factor: 2.0 Max TC CSI: 0.751 Max BC CSI: 1.000 Max Web CSI: 0.428 Wgt: 44.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss HJ7 Truss Type HIP_ Qty 2 Ply 1 290001/20/2021 SEAT PLATE REQ. 9'10-1/16"1'11-13/16" 4-3/16"3'9-7/8"4'5-7/16"A B C D EFG 4.24 12 2X4(A1) 1.5X3 3X4 4X4 1'5-1/2" 10# -25# 2'9-15/16" 86# 129# 2'9-15/16" 155# 255# 2'8-11/16" Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.98 to 61 plf at -0.10 TC: From 2 plf at -0.10 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -25 lb Conc. Load at 1.46 TC: 140 lb Conc. Load at 4.29 TC: 261 lb Conc. Load at 7.12 BC: 10 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 BC: 154 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 96 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 321 /- /- /- /272 /- E 268 /- /- /- /101 /- D 139 /- /- /- /104 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 536 -914 Chords Tens. Comp. C - D 78 -92 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 874 -503 G - F 860 -506 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 203 0 Webs Tens. Comp. C - F 517 -880 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.031 C 999 360 VERT(CL): 0.058 C 999 240 HORZ(LL): 0.008 C - - HORZ(TL): 0.014 C - - Creep Factor: 2.0 Max TC CSI: 0.573 Max BC CSI: 0.988 Max Web CSI: 0.713 Wgt: 46.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss HJ7A Truss Type HIP_ Qty 1 Ply 1 290101/20/2021 SEAT PLATE REQ. 9'10-1/16"1'11-13/16" 4-3/16"3'9-7/8"4'5-7/16"A B C D EFG 4.24 12 2X4(A1) 1.5X3 3X4 4X4 1'5-1/2" 10# -25# 2'9-15/16" 86# 140# 2'9-15/16" 154# 261# 2'8-11/16" **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From -0 plf at -1.98 to 61 plf at -0.10 TC: From 2 plf at -0.10 to 2 plf at 9.84 BC: From 2 plf at 0.00 to 2 plf at 9.84 TC: -25 lb Conc. Load at 1.46 TC: 140 lb Conc. Load at 4.29 TC: 261 lb Conc. Load at 7.12 BC: 10 lb Conc. Load at 1.46 BC: 86 lb Conc. Load at 4.29 BC: 154 lb Conc. Load at 7.12 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 96 0.15 9.84 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 321 /- /- /- /272 /- E 268 /- /- /- /101 /- D 139 /- /- /- /104 /- Wind reactions based on MWFRS B Brg Width = 10.6 Min Req = 1.5 E Brg Width = 1.5 Min Req = - D Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 19 -13 B - C 536 -914 Chords Tens. Comp. C - D 78 -92 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - G 874 -503 G - F 860 -506 Chords Tens. Comp. F - E 0 0 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. G - C 203 0 Webs Tens. Comp. C - F 517 -880 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.031 C 999 360 VERT(CL): 0.058 C 999 240 HORZ(LL): 0.008 C - - HORZ(TL): 0.014 C - - Creep Factor: 2.0 Max TC CSI: 0.573 Max BC CSI: 0.988 Max Web CSI: 0.713 Wgt: 46.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss HJ7A Truss Type HIP_ Qty 1 Ply 1 290101/20/2021 SEAT PLATE REQ. 9'10-1/16"1'11-13/16" 4-3/16"3'9-7/8"4'5-7/16"A B C D EFG 4.24 12 2X4(A1) 1.5X3 3X4 4X4 1'5-1/2" 10# -25# 2'9-15/16" 86# 140# 2'9-15/16" 154# 261# 2'8-11/16" Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 218 /- /- /196 /115 /57 D 5 /-14 /- /19 /17 /- C - /-40 /- /44 /50 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 63 -33 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 D - - HORZ(TL): 0.000 D - - Creep Factor: 2.0 Max TC CSI: 0.318 Max BC CSI: 0.042 Max Web CSI: 0.000 Wgt: 5.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J1 Truss Type JACK Qty 6 Ply 1 288601/20/2021 SEAT PLATE REQ. 1' 1'5-9/16" 4-3/16" 10-3/16"1'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 218 /- /- /196 /115 /57 D 5 /-14 /- /19 /17 /- C - /-40 /- /44 /50 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 63 -33 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 D - - HORZ(TL): 0.000 D - - Creep Factor: 2.0 Max TC CSI: 0.318 Max BC CSI: 0.042 Max Web CSI: 0.000 Wgt: 5.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J1 Truss Type JACK Qty 6 Ply 1 288601/20/2021 SEAT PLATE REQ. 1' 1'5-9/16" 4-3/16" 10-3/16"1'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 218 /- /- /206 /116 /57 D 5 /-14 /- /16 /9 /- C - /-40 /- /41 /54 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 62 -33 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 D - - HORZ(TL): 0.000 D - - Creep Factor: 2.0 Max TC CSI: 0.318 Max BC CSI: 0.040 Max Web CSI: 0.000 Wgt: 5.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J1P Truss Type JACK Qty 4 Ply 1 288701/20/2021 SEAT PLATE REQ. 1' 1'5-9/16" 4-3/16" 10-3/16"1'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 10 0.15 1.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 218 /- /- /206 /116 /57 D 5 /-14 /- /16 /9 /- C - /-40 /- /41 /54 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 62 -33 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.000 D - - HORZ(TL): 0.000 D - - Creep Factor: 2.0 Max TC CSI: 0.318 Max BC CSI: 0.040 Max Web CSI: 0.000 Wgt: 5.6 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J1P Truss Type JACK Qty 4 Ply 1 288701/20/2021 SEAT PLATE REQ. 1' 1'5-9/16" 4-3/16" 10-3/16"1'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 233 /- /- /179 /93 /109 D 43 /- /- /20 /- /- C 64 /- /- /34 /56 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 29 -75 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.001 D - - HORZ(TL): 0.001 D - - Creep Factor: 2.0 Max TC CSI: 0.358 Max BC CSI: 0.064 Max Web CSI: 0.000 Wgt: 11.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J3 Truss Type JACK Qty 5 Ply 1 288801/20/2021 SEAT PLATE REQ. 3'1'5-9/16" 4-3/16"1'10-3/16"2'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 233 /- /- /179 /93 /109 D 43 /- /- /20 /- /- C 64 /- /- /34 /56 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 29 -75 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.001 D - - HORZ(TL): 0.001 D - - Creep Factor: 2.0 Max TC CSI: 0.358 Max BC CSI: 0.064 Max Web CSI: 0.000 Wgt: 11.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J3 Truss Type JACK Qty 5 Ply 1 288801/20/2021 SEAT PLATE REQ. 3'1'5-9/16" 4-3/16"1'10-3/16"2'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.21 2.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 106 /- /- /62 /21 /68 C 43 /- /- /20 /- /- B 76 /- /- /47 /67 /- Wind reactions based on MWFRS A Brg Width = 4.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing A is a rigid surface. Bearing A requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 34 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 B - - HORZ(TL): 0.001 C - - Creep Factor: 2.0 Max TC CSI: 0.211 Max BC CSI: 0.067 Max Web CSI: 0.000 Wgt: 9.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J3A Truss Type JACK Qty 1 Ply 1 288901/20/2021 SEAT PLATE REQ. 2'8" 6-3/16"1'10-3/16"A B C 6 12 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.21 2.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 106 /- /- /62 /21 /68 C 43 /- /- /20 /- /- B 76 /- /- /47 /67 /- Wind reactions based on MWFRS A Brg Width = 4.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing A is a rigid surface. Bearing A requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 34 -103 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.001 B - - HORZ(TL): 0.001 C - - Creep Factor: 2.0 Max TC CSI: 0.211 Max BC CSI: 0.067 Max Web CSI: 0.000 Wgt: 9.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J3A Truss Type JACK Qty 1 Ply 1 288901/20/2021 SEAT PLATE REQ. 2'8" 6-3/16"1'10-3/16"A B C 6 12 3X4(B1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 233 /- /- /215 /98 /109 D 43 /- /- /58 /30 /- C 64 /- /- /37 /55 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 29 -82 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.000 D - - HORZ(TL): 0.001 D - - Creep Factor: 2.0 Max TC CSI: 0.318 Max BC CSI: 0.064 Max Web CSI: 0.000 Wgt: 11.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J3P Truss Type JACK Qty 4 Ply 1 289001/20/2021 SEAT PLATE REQ. 3'1'5-9/16" 4-3/16"1'10-3/16"2'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 34 0.15 3.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 233 /- /- /215 /98 /109 D 43 /- /- /58 /30 /- C 64 /- /- /37 /55 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 29 -82 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.000 D - - HORZ(TL): 0.001 D - - Creep Factor: 2.0 Max TC CSI: 0.318 Max BC CSI: 0.064 Max Web CSI: 0.000 Wgt: 11.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J3P Truss Type JACK Qty 4 Ply 1 289001/20/2021 SEAT PLATE REQ. 3'1'5-9/16" 4-3/16"1'10-3/16"2'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 299 /- /- /213 /106 /161 D 77 /- /- /36 /- /- C 127 /- /- /75 /107 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 57 -145 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 D - - HORZ(TL): 0.008 D - - Creep Factor: 2.0 Max TC CSI: 0.507 Max BC CSI: 0.228 Max Web CSI: 0.000 Wgt: 18.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J5 Truss Type JACK Qty 5 Ply 1 289101/20/2021 SEAT PLATE REQ. 5'1'5-9/16" 4-3/16"2'10-3/16"3'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 299 /- /- /213 /106 /161 D 77 /- /- /36 /- /- C 127 /- /- /75 /107 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 57 -145 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 D - - HORZ(TL): 0.008 D - - Creep Factor: 2.0 Max TC CSI: 0.507 Max BC CSI: 0.228 Max Web CSI: 0.000 Wgt: 18.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J5 Truss Type JACK Qty 5 Ply 1 289101/20/2021 SEAT PLATE REQ. 5'1'5-9/16" 4-3/16"2'10-3/16"3'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.19 4.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 182 /- /- /107 /40 /120 C 76 /- /- /37 /- /- B 133 /- /- /82 /114 /- Wind reactions based on MWFRS A Brg Width = 4.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing A is a rigid surface. Bearing A requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 60 -124 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.005 B - - HORZ(TL): 0.008 C - - Creep Factor: 2.0 Max TC CSI: 0.433 Max BC CSI: 0.211 Max Web CSI: 0.000 Wgt: 15.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J5A Truss Type JACK Qty 1 Ply 1 289201/20/2021 SEAT PLATE REQ. 4'8" 6-1/4"2'10-1/4"A B C 6 12 3X4(B1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.19 4.67 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL A 182 /- /- /107 /40 /120 C 76 /- /- /37 /- /- B 133 /- /- /82 /114 /- Wind reactions based on MWFRS A Brg Width = 4.0 Min Req = 1.5 C Brg Width = 1.5 Min Req = - B Brg Width = 1.5 Min Req = - Bearing A is a rigid surface. Bearing A requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 60 -124 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): -0.005 B - - HORZ(TL): 0.008 C - - Creep Factor: 2.0 Max TC CSI: 0.433 Max BC CSI: 0.211 Max Web CSI: 0.000 Wgt: 15.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J5A Truss Type JACK Qty 1 Ply 1 289201/20/2021 SEAT PLATE REQ. 4'8" 6-1/4"2'10-1/4"A B C 6 12 3X4(B1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 299 /- /- /276 /114 /161 D 77 /- /- /110 /58 /- C 127 /- /- /81 /105 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 57 -129 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 D - - HORZ(TL): 0.008 D - - Creep Factor: 2.0 Max TC CSI: 0.379 Max BC CSI: 0.241 Max Web CSI: 0.000 Wgt: 18.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J5P Truss Type EJAC Qty 4 Ply 1 289301/20/2021 SEAT PLATE REQ. 5'1'5-9/16" 4-3/16"2'10-3/16"3'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 58 0.15 5.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 299 /- /- /276 /114 /161 D 77 /- /- /110 /58 /- C 127 /- /- /81 /105 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 57 -129 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 D - - HORZ(TL): 0.008 D - - Creep Factor: 2.0 Max TC CSI: 0.379 Max BC CSI: 0.241 Max Web CSI: 0.000 Wgt: 18.2 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J5P Truss Type EJAC Qty 4 Ply 1 289301/20/2021 SEAT PLATE REQ. 5'1'5-9/16" 4-3/16"2'10-3/16"3'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 371 /- /- /254 /122 /213 D 109 /- /- /52 /- /- C 189 /- /- /114 /157 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 84 -196 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.013 D - - HORZ(TL): 0.024 D - - Creep Factor: 2.0 Max TC CSI: 0.566 Max BC CSI: 0.507 Max Web CSI: 0.000 Wgt: 23.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J7 Truss Type EJAC Qty 7 Ply 1 289401/20/2021 SEAT PLATE REQ. 7'1'5-9/16" 4-3/16"3'10-3/16"4'5-15/16"A B C D 6 12 2X4(A1) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.15 7.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL B 371 /- /- /254 /122 /213 D 109 /- /- /52 /- /- C 189 /- /- /114 /157 /- Wind reactions based on MWFRS B Brg Width = 8.0 Min Req = 1.5 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Bearing B is a rigid surface. Bearing B requires a seat plate. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 39 0 Chords Tens. Comp. B - C 84 -196 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. B - D 0 0 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.013 D - - HORZ(TL): 0.024 D - - Creep Factor: 2.0 Max TC CSI: 0.566 Max BC CSI: 0.507 Max Web CSI: 0.000 Wgt: 23.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss J7 Truss Type EJAC Qty 7 Ply 1 289401/20/2021 SEAT PLATE REQ. 7'1'5-9/16" 4-3/16"3'10-3/16"4'5-15/16"A B C D 6 12 2X4(A1) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.00 2.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /40 /10 /13 Wind reactions based on MWFRS D Brg Width = 29.5 Min Req = - Bearing D is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -37 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 106 -11 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025 B 999 360 VERT(CL): 0.047 B 584 240 HORZ(LL): 0.011 B - - HORZ(TL): 0.021 B - - Creep Factor: 2.0 Max TC CSI: 0.185 Max BC CSI: 0.257 Max Web CSI: 0.000 Wgt: 8.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM03 Truss Type VAL Qty 1 Ply 1 289501/20/2021 2'5-1/2" 6-15/16"1'10-9/16" 0-1/4"1'3"A B CD 6 12 2X4(D8R) **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.00 2.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /40 /10 /13 Wind reactions based on MWFRS D Brg Width = 29.5 Min Req = - Bearing D is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -37 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 106 -11 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.025 B 999 360 VERT(CL): 0.047 B 584 240 HORZ(LL): 0.011 B - - HORZ(TL): 0.021 B - - Creep Factor: 2.0 Max TC CSI: 0.185 Max BC CSI: 0.257 Max Web CSI: 0.000 Wgt: 8.4 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM03 Truss Type VAL Qty 1 Ply 1 289501/20/2021 2'5-1/2" 6-15/16"1'10-9/16" 0-1/4"1'3"A B CD 6 12 2X4(D8R) Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.00 4.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /44 /13 /16 Wind reactions based on MWFRS D Brg Width = 53.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -84 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 159 -18 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - C 179 -112 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 C - - HORZ(TL): 0.008 C - - Creep Factor: 2.0 Max TC CSI: 0.243 Max BC CSI: 0.188 Max Web CSI: 0.110 Wgt: 16.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM05 Truss Type VAL Qty 1 Ply 1 289601/20/2021 4'5-1/2" 6-15/16"3'10-9/16" 4'2"3-1/2" 0-1/4"2'3"A B CD 6 12 2X4(D8R) 1.5X3 1.5X4 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 54 0.00 4.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /44 /13 /16 Wind reactions based on MWFRS D Brg Width = 53.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 40 -84 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 159 -18 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - C 179 -112 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.004 C - - HORZ(TL): 0.008 C - - Creep Factor: 2.0 Max TC CSI: 0.243 Max BC CSI: 0.188 Max Web CSI: 0.110 Wgt: 16.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM05 Truss Type VAL Qty 1 Ply 1 289601/20/2021 4'5-1/2" 6-15/16"3'10-9/16" 4'2"3-1/2" 0-1/4"2'3"A B CD 6 12 2X4(D8R) 1.5X3 1.5X4 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 78 0.00 6.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /45 /15 /17 Wind reactions based on MWFRS D Brg Width = 77.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 54 -115 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 207 -25 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - C 244 -167 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.013 C - - HORZ(TL): 0.024 C - - Creep Factor: 2.0 Max TC CSI: 0.520 Max BC CSI: 0.358 Max Web CSI: 0.241 Wgt: 23.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM07 Truss Type VAL Qty 1 Ply 1 289701/20/2021 6'5-1/2" 6-15/16"5'10-9/16" 6'2"3-1/2" 0-1/4"3'3"A B CD 6 12 2X4(D8R) 1.5X3 3X6 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 78 0.00 6.46 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL D* 76 /- /- /45 /15 /17 Wind reactions based on MWFRS D Brg Width = 77.5 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 54 -115 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 207 -25 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - C 244 -167 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): NA VERT(CL): NA HORZ(LL): 0.013 C - - HORZ(TL): 0.024 C - - Creep Factor: 2.0 Max TC CSI: 0.520 Max BC CSI: 0.358 Max Web CSI: 0.241 Wgt: 23.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM07 Truss Type VAL Qty 1 Ply 1 289701/20/2021 6'5-1/2" 6-15/16"5'10-9/16" 6'2"3-1/2" 0-1/4"3'3"A B CD 6 12 2X4(D8R) 1.5X3 3X6 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 8.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL F* 76 /- /- /46 /15 /17 Wind reactions based on MWFRS F Brg Width = 100.0 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 76 -213 Chords Tens. Comp. B - C 6 -61 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 271 -44 Chords Tens. Comp. E - D 280 -47 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 379 -322 Webs Tens. Comp. C - D 55 -11 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.026 E 999 360 VERT(CL): 0.049 E 999 240 HORZ(LL): 0.007 E - - HORZ(TL): 0.013 E - - Creep Factor: 2.0 Max TC CSI: 0.375 Max BC CSI: 0.249 Max Web CSI: 0.113 Wgt: 37.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM09 Truss Type VAL Qty 1 Ply 1 289801/20/2021 8'4" 6-15/16"7'9-1/16" 5'10-1/4"2'5-3/4" 0-1/4"4'2-1/4"A B C D E F 6 12 2X4(D8R) 1.5X3 1.5X3 1.5X3 1.5X3 **WARNING**Please thoroughly review the ''A-1 ROOF TRUSSES (''SELLER''), GENERAL TERMS and CONDITIONS CUSTOMER (''BUYER'') ACKNOWLEDGMENT'' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner’s authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright © 2016 A-1 Roof Trusses – Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 8.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See A1 Std Detail for valley details. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+ / R- / Rh / Rw / U / RL F* 76 /- /- /46 /15 /17 Wind reactions based on MWFRS F Brg Width = 100.0 Min Req = - Bearing A is a rigid surface. Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 76 -213 Chords Tens. Comp. B - C 6 -61 Maximum Bot Chord Forces Per Ply (lbs) Chords Tens.Comp. A - E 271 -44 Chords Tens. Comp. E - D 280 -47 Maximum Web Forces Per Ply (lbs) Webs Tens.Comp. B - E 379 -322 Webs Tens. Comp. C - D 55 -11 Loading Criteria (psf) TCLL: 20.00 TCDL: 10.00 BCLL: 0.00 BCDL: 7.00 Des Ld: 37.00 NCBCLL: 10.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: B Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 4.2 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Code / Misc Criteria Code:FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Factors Used: Yes FT/RT:10(0)/10(10) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.026 E 999 360 VERT(CL): 0.049 E 999 240 HORZ(LL): 0.007 E - - HORZ(TL): 0.013 E - - Creep Factor: 2.0 Max TC CSI: 0.375 Max BC CSI: 0.249 Max Web CSI: 0.113 Wgt: 37.8 lbs VIEW Ver: 20.01.01A.0724.12 Job ARMSCMB1L15X10 Truss VM09 Truss Type VAL Qty 1 Ply 1 289801/20/2021 8'4" 6-15/16"7'9-1/16" 5'10-1/4"2'5-3/4" 0-1/4"4'2-1/4"A B C D E F 6 12 2X4(D8R) 1.5X3 1.5X3 1.5X3 1.5X3 Rama Pranav Kristam, P.E. # 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 Rama Pranav Kristam, P.E.# 889064451 St. Lucie Blvd, Suite 201Fort Pierce, FL 34946 NOTE: IN ADDITION TO STRAPPING TOE- NAIL BOTH CHORDS OF CORNER JACKS TO CARRYING MEMBER PER THE FOLLOWING SCHEDULE: 2X4: (2) 0.131" Ø TOE NAILS 2X6: (3) 0.131" Ø TOE NAILS HIGH VELOCITY HURRICANE ZONE CORNERSET SPECIFICATIONS: MAX LOAD: 55 PSF ROOF LOAD, 175 MPH, ASCE 7-10, EXP. B & C, UP TO 60' MEAN ROOF HEIGHT & EXPOSURE D UP TO 30' MEAN ROOF HEIGHT. JACK, OR CORNER JACK (TYP.) IMPORTANT NOTE: CONNECTION DESIGNED IN ACCORDANCE WITH FBC 2321.6- 2321.7 PROVIDING METAL STRAPPING (FLORIDA APPROVED PRODUCT) TO RESIST MIN. 700LB UPLIFT AT ALL CONNECTIONS IN HIGH VELOCITY HURRICANE ZONE. LSTA12 TWIST STRAP WITH 10D NAILS, MIN. (10). SEE MFR'S RECOMMENDED CONNECTION. HIP, OR KING JACK (TYP.)7'-0" MAX.ATTACH KING & END JACKS WITH (1) LSTA12 TWIST STRAP AT TOP CHORD WITH (10) 10d NAILS PER STRAP (MIN.) & (3) 0.131" Ø TOE NAILS. ATTACH KING & END JACK WITH (1) THJA26 HANGER AT BOTTOM CHORD. ATTACH CORNER JACKS & STD. JACKS WITH (1) LSTA12 TWIST STRAP AT TOP CHORD & BOTTOM CHORD WITH (10) 10d NAILS PER STRAP MINIMUM (TYP). A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772) 409-1010 STDLHIP/ KING JACK (HVHZ) (SIMPSON)02.25/28/2020 OR EQUIVALENT AT BOTTOM CHORD Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL03ALTERNATE GABLE END BRACING DETAILFEBRUARY 17, 2017 Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 OPTION #2: APA RATED GUSSET. OPTION #3: 2X4 VERT. SCAB. PIGGY-BACK TRUSS. (REFER TO ACTUAL TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) ** IMPORTANT NOTE ** THIS DETAIL IS VALID ONLY FOR SINGLE PLY BASE TRUSSES SPACED AT 24" O.C. OR LESS. PIGGY-BACK DETAIL (TYPICAL) 180 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE C, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. OR... 160 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE D, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. IMPORTANT NOTE: TOP CHORDS OF TRUSSES SUPPORTING PIGGY-BACK CAP TRUSSES MUST BE ADEQUATELY BRACED BY SHEATHING AND/ OR PURLINS. THE BUILDING ENGINEER OF RECORD SHALL PROVIDE DIAGONAL BRACING OR OTHER SUITABLE ANCHORAGE TO PERMANENTLY RESTRAIN PURLINS AND LATERAL BRACING FOR OUT OF PLANE LOADS OVER GABLE ENDS. MAXIMUM TRUSS SPACING IS NOT TO EXCEED 24" O.C. DETAIL IS NOT APPLICABLE IF CAP SUPPORTS ADDITIONAL LOADS SUCH AS CUPOLA, STEEPLE, CHIMNEY OR DRAG STRUT LOADS. **REFER TO ENGINEER'S SEALED TRUSS DESIGN DRAWINGS FOR PIGGY-BACK AND BASE TRUSS SPECIFICATIONS.** OPTION NO. 2 - APA RATED GUSSET: 8" x 8" x 0-7/16" (MIN.) APA RATED SHEATHING GUSSETS EACH FACE. ATTACH AT 8'-0" O.C. w/ 8 (EACH) 6d COMMON (0.113" x 2") NAILS PER GUSSET: 4 (EACH) AT CAP BOTTOM CHORD & 4 (EACH) AT BASE TRUSS TOP CHORD. GUSSETS MAY BE STAGGERED AT 4'-0" O.C. FRONT TO BACK FACES. MINIMUM TWO (2 EA.) CONNECTIONS AT EACH TRUSS. OPTION NO. 3 - 2X4 VERTICAL WOOD SCAB: 2X4 SPF #2, FULL CHORD DEPTH SCABS AT EACH FACE. ATTACH AT 8'-0" O.C. w/6 (EACH) 10d BOX NAILS (0.128" x 3") PER SCAB: 3 (EACH) AT CAP BOTTOM CHORD AND 3 (EACH) AT BASE TRUSS TOP CHORD. SCABS MAY BE STAGGERED 4'-0" O.C. FRONT TO BACK FACES. MINIMUM TWO (2 EA.) CONNECTIONS AT EACH TRUSS. OPTION NO. 1 - TEE-LOK 3" x 8" TEE-LOK MULTI-USE CONNECTION PLATES SPACED AT 4'-0" O.C. MAX. PLATES SHALL BE PRESSED INTO PIGGY-BACK TRUSS AT 4'-0" O.C. STAGGERED FROM EACH FACE AND NAILED TO BASE TRUSS WITH 4 EACH 6d (1.5" X 0.099") NAILS IN EACH PLATE TO ACHEIVE MAXIMUM UPLIFT CAPACITY OF 377 LBS AT EACH 3" X 8" TEE-LOK MULTI-USE CONNECTION PLATE (MINIMUM OF 2 PLATES). OPTION #1: TEE-LOK MULTI-USE CONNECTION PLATE. ATTACH EACH PURLIN TO TOP CHORD OF BASE TRUSS. PURLIN & CONNECTIONS BY OTHERS. BASE TRUSS. (REFER TO TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) PURLINS SPACED ACCORDING TO MAX. SPACING OF TOP CHORD OF BASE TRUSS. SPACING IS NOT TO EXCEED 24" O.C. & PURLINS TO BE LOCATED AT JOINT OF EACH BASE TRUSS. 2'-0" MAX PIGGY-BACK TRUSS STDTL04.112/23/19 Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL05TRUSSED VALLEY SET DETAIL - SHEATHED P 12 VALLEY TRUSS (TYPICAL) BASE TRUSSES SEE DETAIL "A" BELOW (TYP.) VALLEY TRUSS (TYPICAL) GABLE END, COMMON TRUSS, OR GIRDER TRUSS SECURE VALLEY TRUSS W/ ONE ROW OF 10d NAILS 6" O.C. DETAIL A TRUSS CRITERIA: WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT = 30 FEET ROOF PITCH = MINIMUM 3/12 MAXIMUM 6/12 CATERGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 MAX TOP CHORD TOTAL LOAD = 50 PSF MAX SPACING = 24" O.C. (BASE AND VALLEY) MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES. GABLE END, COMMON TRUSS, OR GIRDER TRUSS GENERAL SPECIFICATIONS: 1. NAIL SIZE = 3" X 0.131" = 10d 2. WOOD SCREW = 4.5" SDS25412 SIMPSON OR EQUIVALENT. 3. INSTALL SHEATHING TO TOP CHORD OF BASE TRUSSES. 4. INSTALL VALLEY TRUSSES (24" O.C. MAXIMUM) AND SECURE TO BASE TRUSSES AS PER DETAIL "A". 5. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIDUAL DESIGN DRAWINGS. 6. NAILING DONE PER NDS - 01. 7. VALLEY STUD SPACING NOT TO EXCEED 48" O.C. JULY 17, 2017 ATTACH 2X4 CONTINUOUS #2 SYP TO THE ROOF W/ TWO SIMPSON SDS25412 (1/4" X 4.5") OR EQUIVALENT WOOD SCREWS INTO EACH BASE TRUSS. Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL06TRUSSED VALLEY SET DETAIL P 12 VALLEY TRUSS (TYPICAL) BASE TRUSSES SEE DETAIL "A" BELOW (TYP.) VALLEY TRUSS (TYPICAL) GABLE END, COMMON TRUSS, OR GIRDER TRUSS SECURE VALLEY TRUSS W/ ONE ROW OF 10d NAILS 6" O.C. DETAIL A (NO SHEATHING) N.T.S. WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT = 30 FEET ROOF PITCH = MINIMUM 3/12 MAXIMUM 6/12 CATERGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 MAX TOP CHORD TOTAL LOAD = 50 PSF MAX SPACING = 24" O.C. (BASE AND VALLEY) MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES. GABLE END, COMMON TRUSS, OR GIRDER TRUSS GENERAL SPECIFICATIONS: 1. NAIL SIZE = 3" X 0.131" = 10d 2. WOOD SCREW = 3" SDS25300 SIMPSON OR EQUIVALENT. 3. INSTALL VALLEY TRUSSES (24" O.C. MAXIMUM) AND SECURE PER DETAIL "A". 4. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIUAL DESIGN DRAWINGS. 5. BASE TRUSS SHALL BE DESIGNED WITH A PURLIN SPACING EQUIVALENT TO THE RAKE DIMENSION OF THE VALLEY TRUSS SPACING. 6. NAILING DONE PER NDS - 01. 7. VALLEY STUD SPACING NOT TO EXCEED 48" O.C. FEBRUARY 5, 2018 ATTACH 2X4 CONTINUOUS #2 SYP TO THE ROOF W/ TWO SIMPSON SDS25300 (1/4" X 3") OR EQUIVALENT WOOD SCREWS INTO EACH BASE TRUSS. Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL07TRUSSED VALLEY SET DETAIL (HIGH WIND VELOCITY) WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT = 30 FEET CATERGORY II BUILDING EXPOSURE B OR C WIND DURATION OF LOAD INCREASE: 1.60 MAX TOP CHORD TOTAL LOAD = 50 PSF MAX SPACING = 24" O.C. (BASE AND VALLEY) SUPPORTING TRUSSES DIRECTLY UNDER VALLEY TRUSSES MUST BE DESIGNED WITH A MAXIMUM UNBRACED LENGTH OF 2' - 10" ON AFFECTED TOP CHORDS. NOTES: 1. SHEATHING APPLIED AFTER INSTALLATION OF VALLEY TRUSSES. 2. THIS DETAIL IS NOT APPLICABLE FOR SPF-S SPECIES LUMBER. CLIP MUST BE APPLIED TO THIS FACE WHEN PITCH EXCEEDS 6/12 (MAXIMUM 12/12 PITCH) CLIP MAY BE APPLIED TO THIS FACE UP TO A MAXIMUM 6/12 PITCH FOR BEVELED BOTTOM CHORD, CLIP MAY BE APPLIED TO EITHER FACE. NOTE: VALLEY STUD SPACING NOT TO EXCEED 48" O.C. SPACING. ATTACH VALLEY TRUSSES TO LOWER TRUSSES WITH USP RT7 OR EQUIVALENT. NON-BEVELED BOTTOM CHORD NON-BEVELED BOTTOM CHORD JULY 17, 2017 Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 MAXIMUM STUD LENGTH 2X4 SP #3 / STUD 12" O.C. 16" O.C. 24" O.C. 2X4 SP #3 / STUD 2X4 SP #3 / STUD 2X4 SP #2 12" O.C. 16" O.C. 24" O.C. 2X4 SP #2 2X4 SP #2 3-8-10 3-3-10 2-8-6 5-6-11 4-9-12 3-11-3 6-6-11 6-6-11 5-4-12 11-1-13 9-10-15 8-1-2 3-10-15 5-6-11 6-6-11 11-8-14 10-8-0 9-3-13 6-6-11 6-2-9 4-9-12 3-11-3 3-6-11 3-1-4 3X4 = 12 A A * * * MAX MEAN ROOF HEIGHT = 30 FEET EXPOSURE B OR C ASCE 7-10 190 MPH DURATION OF LOAD INCREASE : 1.60 STDTL08STANDARD GABLE END DETAIL B B + + + + ** STUD DESIGN IS BASED ON COMPONENTS AND CLADDING. CONNECTION OF BRACING IS BASED ON MWFRS. FEBRUARY 17, 2017 ** Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL09FEBRUARY 17, 2017 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL10FEBRUARY 17, 2017 LATERAL BRACING RECOMMENDATIONS Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 45.00°45.00°45.00° STDTL11FEBRUARY 17, 2017 LATERAL TOE-NAIL DETAIL (2X6) 4 NAILS Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 L STDTL12FEBRUARY 17, 2017 UPLIFT TOE-NAIL DETAIL Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 FEBRUARY 5, 2016 ST-2x2 NAILINGTYP 2x2 NAILER ATTACHMENT A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 2x2 NAILER ATTACHMENT GENERAL SPECIFICATIONS MAX LOAD: 55 psf Roof Load, 170 mph, ASCE 7-10, 29'-0" Mean Height, Exp. B, C or D. 1.5 x 4 1.5 x 4 2 x 4 SP No . 2 (M in )2x4 SP No. 2 (Min) 2x2 SP No. 3 STDTL13 Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 April 11, 2016 ST-FLAT GIR BRACETYPICAL ALTERNATE BRACING DETAIL FO EXTERIOR FLAT GIRDER TRUSS A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 (4) 12d MAX 30" (2'-6") 2x6 #2 SP (Both Faces) 24" o.c. SIMPSON H5 (4) 12d TRUSS 24" o.c. UPLIFT CONNECTION (SEE ROOF TRUSS) EXTERIOR FLAT GIRDER VARIES 12 STDTL14 Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL15FEBRUARY 17, 2017 STANDARD REPAIR DETAIL FOR BROKEN CHORDS, WEBS, AND DAMAGED OR MISSING CHORD SPLICE PLATES Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946 STDTL16FEBRUARY 17, 2017 SCAB APPLIED OVERHANGS (L) 24" MAX (2.0 x L) 24" MIN Rama Pranav Kristam, P.E.# 88906 4451 St. Lucie Blvd, Suite 201 Fort Pierce, FL 34946