HomeMy WebLinkAbout2021-01-05 Best Western Hotel Restoration - Construction Observation Report 6 CONSTRUCTION OBSERVATION REPORT 6 Kimley>>>Horn Best Western Hotel—Balcony Restoration Project: Best Western Hotel— KH Project# 143255000 Balcony Restoration Location: 7900 S. US Highway 1, Observed By: Noel Ramirez, P.E. Port St. Lucie, FL 34952 Kimley-Horn Date of Observation: 1/5/2021 305-535-7705 Time of Observation: 11:00 am noel.ramirezcDkimley-horn.com Date of Report: 1/10/2020 Temperature/ 70°, Sunny Weather: Present on Site: Noel Ramirez Kimley-Horn&Associates(KH) Grant DeLa Vasselais Structural Activities Observed: 1. Structural and Waterproofing Repairs Kimley-Horn conducted a site visitto observe structural and waterproofing repairs on the Best Western Hotel—Balcony Restoration project. Upon arriving on site,progress work was observed on the North building. The following observations were noted: a. Post pocket repairs were completed; however,excess of epoxy and aggregate was not grinded in multiple locations. Also, railing post were loose in multiple locations. Kimley-Horn requested Structural to grind excess material to achieve a f lat surface condition and to repair loose post before applying the waterproofing membrane. (Reference Photo 1) b. Shrinkage cracks were observed on repair areas. Kimley-Horn recommended to repair cracks exceed ing 1/16 inches in width with epoxy and to follow surface preparation requirements from the waterproofing membrane manufacturer for smaller cracks. Also,the perimeter of spall repairs was routed in multiple areas. Structural shall follow the recommendations provided by APT Americas in a letter dated January 6, 2021 with additional recommendations about surface preparation to achieve surface conditions req uired for the application of the deck coating. (Reference Photos 2&3) c. Existing railing metal connections were damaged in two locations.Although this issue is not within the scope of work of the approved restoration plans, Kimley-Horn requested Structural to notify ownership. Since this is a safety issue the building shall not be occupied until railings have been repaired at these locations. (Reference Photos 4&5) d. Several f loor cracks on the East balcony had not been repaired.Contractor shall repair the concrete cracks following plans and specifications. (Reference Photo 6) e. One concrete spall at the south east stair was not repaired. Contractor shall repair the concrete spall following plans and specifications. Digitally signed by Noel Ramirez DIN:CN=Noel Ramirez, Noel Ramirez O=KIMLEY HORN AND ASSOC ATES INC, -DS B - Page 1 Date:2021.02.0118:2038-05'00' CONSTRUCTION OBSERVATION REPORT 6 Kimley>>>Horn Best Western Hotel—Balcony Restoration Photographs 1.4 xe Photo 1 —Railing Post Repair Photo 2—Cracks on Spall Repairs T r �Is _ Photo 3—Cracks and Rout on Spall Repairs Photo 4— Railing Connection Broken t - J y { Ff A Photo 5—Railing Con nection Broken Photo 6—Floor Cracks Digitally signed by Noel Ramirez DIN:CN=Noel Ramirez, Noel Ramirez O=KIMLEY HORN AND ASSOCIATES INC,B -Ds— Page 2 Date:2021.02.0118:20:59-05'00'