HomeMy WebLinkAboutTANK SPECS - 2-4-21Quality Steel Corporation AG/UG Propane Tanks
4: rNo, 1MeDrN
1450 w9. AND UP
APPROXIMATE ABOVEGROUND/UNDEGROUND (AG/UG1 VESSEL DIMENSIONS AND SPECIFICATIONS
WATER
CAPACITY
DIAMETER
(OD)
HEAO
TYPE
OVERALL
LENGTH
OVERALL
HEIGHT
LEG*
WIDTH
LEG**
SPACING
WEIGHT
(lbs.)
**QUANTITY
FULL LQAo
PER STACK
*120 wg.
24"
Ellip.
S'-8"
3'
1'-11/2"
Z-10 IA"
or 3 -11
260
109196
161 12
•2SO wg.
30"
Hemi.
7'40"
3'-8"
11-5"
4'-11"
480
54
9
*320 wg.
30"
Hemi.
9'-7"
3'-8"
1'-5"
5'
620
45
9
500 w
371/2"
Heml.
10'
4'-2"
1'-8"
5'
950
37130
8 ( 6
1000 wg.
41"
Hemi.
16'
4'-5"
11-8"
10'-1"
1,8W
17 15
6 ( 5
1450 wg.
461/2"
Ellip.
17'4"
4'-11"
1'-9"
11'4"
2,650
12
4
1990 wg.
461/2"
Ellip.
23'-11"
4'-11"
1'-9a
16'
3,S20
8
4
0lneenslons and spedficatlons shown are apprmdmate. Individual vessels neap vary.
' Leg spacing+/- r. Leg widths and spackeg may vary based on ink location. Check with your salesperson for details. 120, 250, 320 wa. standard tanks
- no holes in legs (one center hole an request). 500 and 1= wg. standard tanks - 2 holes 260 an center. 14SO wg. and up as shown above.
•' Full load and stack quantities vary by shipping locatiom thedc with your salesperson to details.
General Specifications
- Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels, Section Vill, Division 1.
Complies with NFPA 58.
- Rated at 250 psig from -20" F to 125° F. All vessels registered with National Board.
- Two service options available:
Option k Ready -to -bury underground option, coated with either powder coated phenolic epoxy finish
or liquid applied epoxy primer coat followed by urethane top coat, supplied with composite
AG/UG dome.
Option 2: Aboveground option, coated with either powder coated TGIC polyester finish or liquid
applied epoxy primer coat followed by urethane top coat, supplied with steel AG/UG dome.
- All vessels are shipped vacuum pre -purged to enable simplified first fill of the vessel.
Updated June 30, 2015
' PROPANE CONSTRUCTION NOTES
z .
1. All pipe and fittings above ground and Inside building shall be
SCH..40 Galvanized ASTM A120 or AGA approved.corrugated
stainless steel •(C.S.S.T.) pipe.
2. All polypipe and finings shalt be ASTIVI D251.3 or ASTM D2517
and shall be b ude�d -outside underground at a depth of 18" with
warning tape and tracer wire.
I All pipe and meter locations are approximate and subject to
change.. -
4. Alf polypipe shaft be Joined by heat fusion or approved mechanical
couplings,
• S. All'galvanized pWe stall be threaded.
s: Afi pipe. shag be pressure tested to 20 PSI fob a period of 24
hours.
' UNdrRGROUk['1 TANK INSTALLATION'
.
2" to G"
• DOWNGRADED AWAY
•• ,
FROM DOME
�.•
.�-..
�`? •-•-....-
ifs • ••: i
t . • • f I
I ANODE CABLE
` • -'
' • ' •
♦•�`�•
'•
•
SACR.IFICIAL ANODE •
_ - _
'•
•
(MAGNESIUM BAGj
•� •-•
' ` • s
1
•
• ♦ REgULATOR
f
• SHUT GAS OFF AT
•I W 60, V 9 W WAD-E r
- 0
• - • . WARN WG TAPE.
RISE
• GRAVE/Coucf E SLEEVE i
s �
1p
' f • .O • •O •'� 0 • •1•• •• • /� •' tip V �• �.••tt
cp
• • • 3/
• : d • • .: Off••• / • 1• / • •• •�• ,•� O• f7 • • A
i d • ••,
•
o •° 49
SEnYICL LINE • °;
• unoen000ullo tr oAi CORTMHLn r,
• TRACE HIRi