Loading...
HomeMy WebLinkAboutTANK SPECS - 2-4-21Quality Steel Corporation AG/UG Propane Tanks 4: rNo, 1MeDrN 1450 w9. AND UP APPROXIMATE ABOVEGROUND/UNDEGROUND (AG/UG1 VESSEL DIMENSIONS AND SPECIFICATIONS WATER CAPACITY DIAMETER (OD) HEAO TYPE OVERALL LENGTH OVERALL HEIGHT LEG* WIDTH LEG** SPACING WEIGHT (lbs.) **QUANTITY FULL LQAo PER STACK *120 wg. 24" Ellip. S'-8" 3' 1'-11/2" Z-10 IA" or 3 -11 260 109196 161 12 •2SO wg. 30" Hemi. 7'40" 3'-8" 11-5" 4'-11" 480 54 9 *320 wg. 30" Hemi. 9'-7" 3'-8" 1'-5" 5' 620 45 9 500 w 371/2" Heml. 10' 4'-2" 1'-8" 5' 950 37130 8 ( 6 1000 wg. 41" Hemi. 16' 4'-5" 11-8" 10'-1" 1,8W 17 15 6 ( 5 1450 wg. 461/2" Ellip. 17'4" 4'-11" 1'-9" 11'4" 2,650 12 4 1990 wg. 461/2" Ellip. 23'-11" 4'-11" 1'-9a 16' 3,S20 8 4 0lneenslons and spedficatlons shown are apprmdmate. Individual vessels neap vary. ' Leg spacing+/- r. Leg widths and spackeg may vary based on ink location. Check with your salesperson for details. 120, 250, 320 wa. standard tanks - no holes in legs (one center hole an request). 500 and 1= wg. standard tanks - 2 holes 260 an center. 14SO wg. and up as shown above. •' Full load and stack quantities vary by shipping locatiom thedc with your salesperson to details. General Specifications - Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels, Section Vill, Division 1. Complies with NFPA 58. - Rated at 250 psig from -20" F to 125° F. All vessels registered with National Board. - Two service options available: Option k Ready -to -bury underground option, coated with either powder coated phenolic epoxy finish or liquid applied epoxy primer coat followed by urethane top coat, supplied with composite AG/UG dome. Option 2: Aboveground option, coated with either powder coated TGIC polyester finish or liquid applied epoxy primer coat followed by urethane top coat, supplied with steel AG/UG dome. - All vessels are shipped vacuum pre -purged to enable simplified first fill of the vessel. Updated June 30, 2015 ' PROPANE CONSTRUCTION NOTES z . 1. All pipe and fittings above ground and Inside building shall be SCH..40 Galvanized ASTM A120 or AGA approved.corrugated stainless steel •(C.S.S.T.) pipe. 2. All polypipe and finings shalt be ASTIVI D251.3 or ASTM D2517 and shall be b ude�d -outside underground at a depth of 18" with warning tape and tracer wire. I All pipe and meter locations are approximate and subject to change.. - 4. Alf polypipe shaft be Joined by heat fusion or approved mechanical couplings, • S. All'galvanized pWe stall be threaded. s: Afi pipe. shag be pressure tested to 20 PSI fob a period of 24 hours. ' UNdrRGROUk['1 TANK INSTALLATION' . 2" to G" • DOWNGRADED AWAY •• , FROM DOME �.• .�-.. �`? •-•-....- ifs • ••: i t . • • f I I ANODE CABLE ` • -' ' • ' • ♦•�`�• '• • SACR.IFICIAL ANODE • _ - _ '• • (MAGNESIUM BAGj •� •-• ' ` • s 1 • • ♦ REgULATOR f • SHUT GAS OFF AT •I W 60, V 9 W WAD-E r - 0 • - • . WARN WG TAPE. RISE • GRAVE/Coucf E SLEEVE i s � 1p ' f • .O • •O •'� 0 • •1•• •• • /� •' tip V �• �.••tt cp • • • 3/ • : d • • .: Off••• / • 1• / • •• •�• ,•� O• f7 • • A i d • ••, • o •° 49 SEnYICL LINE • °; • unoen000ullo tr oAi CORTMHLn r, • TRACE HIRi