Loading...
HomeMy WebLinkAboutWind Load Calcs613oiset'scade EE Single 16" BCI® 4500s-1.8 SAS I 1st Floor\Floor Joists\J1(i737) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 24 OCS I Repetitive Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i737) City, State, Zip: Specifier: C RE E K S I D E Customer: Designer: LOT 78 Code reports: ESR-1336 Company: 2 0 0 B1 17-09_00 Total Horizontal Product Length = 17-09-00 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,4" 646/0 161 /0 B2, 2" 701 / 0 175 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 01-07-15 17-09-00 Top 40 10 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3749 ft-lbs 91.7% 100% 1 09-00-02 End Reaction 876 lbs 81.1 % 100% 1 17-09-00 End Shear 860 lbs 43.5% 100% 1 17-07-00 Hole #1 Shear 448 lbs 81.6% 100% 3 05-00-00 Hole #2 Shear 511 lbs 93.2% 100% 4 13-09-00 Total Load Deflection U619 (0.337") 58.1 % n\a 1 09-00-02 Live Load Deflection U774 (0.269") 62.0% n\a 6 09-00-02 Max Defl. 0.337" 33.7% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular HorizontalW code H02 13-09-00 8" L 12" Circular Horizontal e� geviePtae l� UpN� % Allow % Allow Bearing Supports Dim. (LW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 807 lbs 13.2% 54.7% Unspecified B2 Hanger 2" x 1-3/4" 876 lbs 76.2% 81.1% ITS1.81/16 BC FloorValue® Summary BC FloorValue@): FNERIMMANUMMIRIAM I Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81 /16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 1_ of 83 Boise Cascade Single 16" BCI® 4500s-1.8 BC CALC) Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st FloorTloor JoistsW1(i737) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J 1(i737) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC® analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC), BC FRAMER& , AJS-, ALLJOIST) , BC RIM BOARD-, BCI) , BOISE GLULAM-, BC FloorValue® , VERSA -LAM), VERSA -RIM PLUS®, Page 2 of 83 a Boise Cascade Single 16" BCIO 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st FloorlFloor JoistslJ1(1757) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J 1 (i757) Specifier: Designer: Company: n-09-00 Total Horizontal Product Length = 17-09-00 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind _ _ Roof Live B1,4" 586/0 147/0 B2, 2" 586 / 0 147 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 67 17 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3145 ft-lbs 76.9% 100% 1 09-00-02 End Reaction 733 lbs 67.8% 100% 1 17-09-00 End Shear 719 lbs 36.4% 100% 1 00-04-00 Hole #1 Shear 373 lbs 67.9% 100% 3 05-00-00 Hole #2 Shear 428 lbs 78.1 % 100% 4 13-09-00 Total Load Deflection U738 (0.283") 48.8% n\a 1 09-00-02 Live Load Deflection U922 (0.226") 52.1 % n\a 6 09-00-02 Max Defl. 0.283" 28.3% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular . Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 733 lbs 12.0% 49.7% Unspecified B2 Hanger 2" x 1-3/4" 733 lbs 63.7% 67.8% ITS1.81/16 BC FloorValue@) Summary BC FloorValueO: WH=r25ROWN-W, Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 3 of 83 /. Boise Cascade - Single 16" BCI® 4500s-1.8 � � i BC CALCO Member Report Build 7239 Job name: Address: 1st Floor\Floor Joists\J1(i757) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J1(i757) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValueO , VERSA -LAM@, VERSA -RIM PLUS@ , Page 4 of 83 _-: ��. . Boise Cascade I= Single 16" BCI® 4500s-1.8 1st Floor\Floor Joists\J1(1757) - 01 (Floor Joist) BC CALC® Member Report Dry 11 span No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i757) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 1 0 0. B1 17-09.00 Total Horizontal Product Length = 17-09-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 586/0 147/0 B2, 2" 586 / 0 147 / 0 Load Summary Live Dead Snow Wind Roof oCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 67 17 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3145 ft-Ibs 76.9% 100% 1 09-00-02 End Reaction 733 Ibs 67.8% 100% 1 17-09-00 End Shear 719 Ibs 36.4% 100% 1 00-04-00 Hole #1 Shear 373 Ibs 67.9% 100% 3 05-00-00 Hole #2 Shear 428 Ibs 78.1 % 100% 4 13-09-00 Total Load Deflection U738 (0.283") 48.8% n\a 1 09-00-02 Live Load Deflection U922 (0.226") 52.1 % n\a 6 09-00-02 Max Defl. 0.283" 28.3% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 733 Ibs 12.0% 49.7% Unspecified B2 Hanger 2" x 1-3/4" 733 Ibs 63.7% 67.8% ITS1.81/16 BC FloorValue® Summa BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 5 of 83 :- Boise Cascade -- -- Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st FloorlFloor Joists\J1(i757) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J 1(i757) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (I") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@), VERSA -RIM PLUSO , Page 6 of 83 Boise cascade Single 16" BCI® 4500s-1.8 PASSE 1st FloorTloor JoistsIA(i764) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: -N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J1(i764) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 1 O, 77 Unci B1 17-09-00 Total Horizontal Product Length = 17-09-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 817/0 204/0 B2, 2" 662 / 0 165 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (Ib/ft) L 01-07-15 17-09-00 Top 73 18 n\a 2 J6(i746) Conc. Pt. (Ibs) L 01-08-13 01-08-13 Top 308 77 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3674 ft-Ibs 89.8% 100% 1 08-07-13 End Reaction 827 Ibs 76.5% 100% 1 17-09-00 End Shear 1021 Ibs 51.7% 100% 1 00-04-00 Hole #1 Shear 401 Ibs 73.2% 100% 3 05-00-00 Hole #2 Shear 495 Ibs 90.2% 100% 4 13-09-00 Total Load Deflection U625 (0.334") 57.6% n\a 1 08-10-11 Live Load Deflection U781 (0.267") 61.4% n\a 6 08-10-11 Max Defl. 0.334" 33.4% n\a 1 08-10-11 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 1021 Ibs 16.7% 69.2% Unspecified B2 Hanger 2" x 1-3/4" 827 Ibs 71.9% 76.5% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 7 of 83. l Boise Cascade Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st FloorlFloor JoistsUI(i764) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J1(i764) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 8 of 83 -f" 4 Boise Cascade Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: 1st Floor\Floor Joists\J1(i776) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J 1 (i776) Specifier: Designer: Code reports: ESR-1336 Company: B1 17-09-00 Total Horizontal Product Length=17-09-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 703/0 176/0 B2, 2" 703 / 0 176 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3774 ft-Ibs 92.3% 100% 1 09-00-02 End Reaction 879 Ibs 81.3% 100% 1 17-09-00 End Shear 863 Ibs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 Ibs 81.5% 100% 3 05-00-00 Hole #2 Shear 514 Ibs 93.7% 100% 4 13-09-00 Total Load Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271 ") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 BC FloorValue® Su BC FloorValue@: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 9, of (98oise Cascade M—ff Single 16" BCI® 4500s-1.8D 1st FloorTloor JoistsUl(i776) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAMTm, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 10 of 83 131 17-09-00 B2 Total Horizontal Product Length = 17-09-00 Reaction. Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 4" 70310 17610 B2, 2" 703 / 0 176 / 0 Load Summary Live Dead Snow Wind Roof OCS Tag Description Load Type Ref. Start End Loc. Live 100% 90% 115% 160%" 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3774 ft-Ibs 92.3% 100% 1 09-00-02 End Reaction 879 Ibs 81.3% 100% 1 17-09-00 End Shear 863 Ibs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 Ibs 81.5% 100% 3 05-00-00 Hole #2 Shear 514 Ibs 93.7% 100% 4 13-09-00 Total Load Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271 ") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12-' Circular Horizontal %" Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 879 Ibs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 11 of 83 6Boise cascade — Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW I (i776) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J1(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 12 of 83 - ` Boise Cascade = Single 16" BCIO 4500s-1.8 BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st FloorlFloor JoistsUl(i776) - 02 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J 1 (i776) Specifier: Designer: Company: n-09-0o Total Horizontal Product Length = 17-09-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 4" 703 / 0 176 / 0 B2, 2" 703 / 0 176 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3774 ft-Ibs 92.3% 100% 1 09-00-02 End Reaction 879 Ibs 81.3% 100% 1 17-09-00 End Shear 863 Ibs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 Ibs 81.5% 100% 3 05-00-00 Hole #2 Shear 514 Ibs 93.7% 100% 4 13-09-00 Total Load Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271 ") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lx" Value Support Member Material 131 Wall/Plate 4" x 1-3/4" 879 lbs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 Ibs 76.5% 81.3% ITS1.81/16 BC FloorValue@ Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page_13 of 83' = Boise cascade — Single 16" BCl® 4500s-1.8 1st Flooffloor JoistslJ1(i776) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM" "', BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 14 of 83 _- Boise cascade EMNE Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistslJ1(i776) - 03 (Floor Joist) BC CALC® Member Report Dry 1 span I No cant. 24 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 0 0 B1 17-09-00 Total Horizontal Product Length=17-09-00 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,4" 703/0 176/0 B2, 2" 703 / 0 176 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3774 ft-lbs 92.3% 100% 1 09-00-02 End Reaction 879 lbs 81.3% 100% 1 17-09-00 End Shear 863 lbs 43.7% 100% 1 00-04-00 Hole #1 Shear 447 lbs 81.5% 100% 3 05-00-00 Hole #2 Shear 514 lbs 93.7% 100% 4 13-09-00 Total Load Deflection U615 (0.339") 58.6% n\a 1 09-00-02 Live Load Deflection U768 (0.271 ") 62.5% n\a 6 09-00-02 Max Defl. 0.339" 33.9% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Wall/Plate 4" x 1-3/4" 879 lbs 14.4% 59.6% Unspecified B2 Hanger 2" x 1-3/4" 879 lbs 76.5% 81.3% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor. 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 15 of 83 -- =. kmffEi Boise cascade � Single 16" BCI® 4500s-1.8 1st FloorlFloor Joists\J1(i776) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i776) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAW, VERSA -RIM PLUS@ , Page 16 of 83 J- Boise Cascade = Single 16" BCI® 4500s-1.8 BB 1st FloorlFloorJoistsWI(1784) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J 1(i784) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: o-_ 17-09-00 B1 B2 Total Horizontal Product Length=17-09-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 514/0 129/0 B2, 2" 514/0 129/0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 17-09-00 Top 58 15 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2759 ft-Ibs 67.5% 100% 1 09-00-02 End Reaction 643 Ibs 59.5% 100% 1 17-09-00 End Shear 631 lbs 31.9% 100% 1 00-04-00 Hole #1 Shear 327 Ibs 59.6% 100% 3 05-00-00 Hole #2 Shear 376 Ibs 68.5% 100% 4 13-09-00 Total Load Deflection U841 (0.248") 42.8% n\a 1 09-00-02 Live Load Deflection U1051 (0.198") 45.7% n\a 6 09-00-02 Max Defl. 0.248" 24.8% n\a 1 09-00-02 Span / Depth 13.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 13-09-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Wall/Plate 4" x 1-3/4" 643 Ibs 10.5% 43.6% Unspecified B2 Hanger 2" x 1-3/4" 643 Ibs 55.9% 59.5% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 08-11-08 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. 013olse cascade 09999 Single 16" BUD 4500s-1.8 1st FloorlFloor JoistsWl (1784) (Floor Joist) BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J 1 (i784) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page-.18 of 83 >: Boise cascade WNE�2 Single 16" BCIO 4500s-1.8 PASSEI? 1st Flooffloor JoistslJ2(1750) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J2(i750) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 0 B1 15.04-14 Total Horizontal Product Length=15-04-14 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 621/0 155/0 B2, 2" 610/0 152/0 132 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 80 20 n\a Controls Summary Value %Allowable Duration Case Location Pos. Moment 2824 ft-Ibs 69.0% 100% 1 07-09-08 End Reaction 762 Ibs 70.5% 100% 1 15-04-14 End Shear 745 Ibs 37.7% 100% 1 00-04-00 Hole #1 Shear 354 Ibs 64.5% 100% 3 04-09-08 Hole #2 Shear 361 Ibs 65.8% 100% 4 10-10-08 Total Load Deflection U915 (0.197") 39.3% n\a 1 07-09-08 Live Load Deflection U1144 (0.158") 42.0% n\a 6 07-09-08 Max Defl. 0.197" 19.7% n\a 1 07-09-08 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-09-08 8" L 12" Circular Horizontal H02 10-10-08 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 776 Ibs 12.7% 52.6% Unspecified B2 Hanger 2" x 1-3/4" 762 Ibs 66.3% 70.5% ITS1.81/16 BC FloorValue@ Summary BC FloorValueO: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-09-07 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page I9 of 83 -- Boise Cascade � Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st Flooffloor JoistsW(i750) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J2(i750) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 20_of 83 °= . 1 (91 Boise Cascade f;i Single 16" BCI® 45005-1.8 SS BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 1st FloorTloor JoistsW2(i772) (Floor Joist) Dry I 1 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J2(i772) Specifier: Designer. Company: O B1 15-04-14 Total Horizontal Product Length = 15-04-14 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 4" 534 / 0 133 / 0 B2, 2" 530 / 0 133 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-14 15-04-14 Top 30 7 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 40 10 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2456 ft-Ibs 60.1 % 100% 1 07-09-08 End Reaction 663 Ibs 61.3% 100% 1 15-04-14 End Shear 648 Ibs 32.8% 100% 1 00-04-00 Hole #1 Shear 308 Ibs 56.1 % 100% 3 04-09-08 Hole #2 Shear 314 Ibs 57.2% 100% 4 10-10-08 Total Load Deflection L/1052 (0.171 ") 34.2% n\a 1 07-09-08 Live Load Deflection U1315 (0.137") 36.5% n\a 6 07-09-08 Max Defl. 0.171" 17.1% n\a 1 07-09-08 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-09-08 8" L 12" Circular Horizontal H02 10-10-08 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 667 Ibs 10.9% 45.2% Unspecified B2 Hanger 2" x 1-3/4" 663 lbs 57.6% 61.3% ITS1.81/16 BC FloorValue® Summ BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-09-07 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 21,-of 83 =J 8Boise Cascade �g Single 16" BCI® 4500s-1.8 1st Floor\Floor JoistsW2(i772) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J2(i772) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAW, VERSA -RIM PLUSO , Page 22 of 83_ -Boise Cascade Single 16" BCIO 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: 1st Floor\Floor JoistsU2(i782) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J2(i782) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 15-04-14 Total Horizontal Product Length = 15-04-14 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 611 /0 153/0 B2, 2" 610/0 152/0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-01-12 15-04-14 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2824 ft-Ibs 69.0% 100% 1 07-09-08 End Reaction 762 Ibs 70.5% 100% 1 15-04-14 End Shear 745 lbs 37.7% 100% 1 00-04-00 Hole #1 Shear 354 Ibs 64.5% 100% 3 04-09-08 Hole #2 Shear 361 Ibs 65.8% 100% 4 10-10-08 Total Load Deflection U915 (0.197") 39.3% n\a 1 07-09-08 Live Load Deflection U1144 (0.158") 42.0% n\a 6 07-09-08 Max Defl. 0.197" 19.7% n\a 1 07-09-08 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-09-08 8" L 12" Circular Horizontal H02 10-10-08 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 1-3/4" 764 Ibs 12.5% 51.8% Unspecified B2 Hanger 2" x 1-3/4" 762 Ibs 66.3% 70.5% ITS1.81/16 BC FloorValue@ Summ BC FloorValue& Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-09-07 Cautions Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 23 of 83 =; "- Boise Cascade Single 16" BCI® 4500s-1.8 1 st FloorTloor JoistslJ2(i782) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J2(i782) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue(D, VERSA -LAM@), VERSA -RIM PLUS@ , Page 24 of 83s;-_. ;_ *Boise cascade lff=� Single 16" BCIO 4500s-1.8 IASE 1st Flooffloor JoistslJ3(1760) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 15-01-06 Total Horizontal Product Length=15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCs Live _Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue@ Summary BC FloorValue@: - Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA -STRAND@ RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 25 of Boise Cascade Single 16" BCI® 4500s-1.8 IP�S�I 1st FloorlFloor JoistslJ3(i760) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 26_of 83 -.:-- aBolse'Cascade MEE Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistslJ3(i760) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue@: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA-STRANDO RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -'Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 27 of 83= 7 6Boise cascade 119M Single 16" BCI® 4500s-1.8 E 1st Flooffloor JoistslJ3(i760) - 01 (Floor Joist) BC, CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 28 of 83-a_-__ 0Boise cascade Single 16" BCI® 4500s-1.8 1st FloorTloor JoistsU3(i760) - 02 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 15-01-06 Total Horizontal Product Length = 15-01-06 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605/0 151 /0 132 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Wa9mm Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA -STRAND® RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 29 of 81-2 r_= 6Boise cascade MIME Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW(U60) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 30 of 83 _ Boise Cascade Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st Flooffloor JoistsW(U60) - 03 (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J3(i760) Specifier: Designer: Company: 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-lbs 67.9% 100% 1 07-06-08 End Reaction 756 lbs 69.9% 100% 1 00-00-00 End Shear 739 lbs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 lbs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 lbs 64.7% 100% 4 10-07-00 Total Load Deflection L/936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 lbs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 lbs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue& wRiMEMM Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA -STRAND@ RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 31 of 83 813olse cascade iff� Single 16" BCI® 4500s-1.8 1st FloorlFloor JoistsW3(i760) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@), VERSA -RIM PLUS@ , Page 32_of 83 Single 16" BCIO 4500s-1.8 &Boise Cascade lffff BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 131 1st Flooffloor JoistsW(U60) - 04 (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J3(i760) Specifier: Designer: Company: 15-01-05 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection L/936 (0.191") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue@) Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA -STRAND® RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 33 of 83_..: = Bolse cascade - Single 16" BCI® 4500s-1.8 ��EI 1 st FloorTloor JoistslJ3(i760) - 04 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS— ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 34 of 83 =--- 813ols, cascade MEE Single 16" BCM 4500s-1.8 I B 1st FloorlFloor JoistslJ3(i760) - 05 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 61 15-01-06 Total Horizontal Product Length=15-01-06 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2". 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191") 38.5% n\a 1 07-06-08 Live Load Deflection U1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at 131 is a Double 1-3/4" x 16" VERSA -STRAND® RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 35 of 83 EMN 013ois:Cascade Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st FlooiAFloor JoistsW(U60) - 05 (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Flooffloor JoistsW(i760) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValueO , VERSA-LAMO, VERSA -RIM PLUS@ , Page 36 of 83 Boise Cascade EME92 Single 16" BCI® 4500s-1.8 pAS��i 1st Flooffloor JoistslJ3(1760) - 06 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: O I L 15-01-06 131 132 Total Horizontal Product Length = 15-01-06 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90%" 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lx1N) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue& Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at 61 is a Double 1-3/4" x 16" VERSA -STRAND@ RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 37-of 83_- :-_ Boise cascade EINM Single 16" BCI® 4500s-1.8 1st FloorlFloor Joists\J3(i760) - 06 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@), VERSA -RIM PLUS@ , Page 38 of 83 Boise Cascade Single 16" BCI® 4500s-1.8 1st FloorTloor JoistsW(i760) - 07 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 1 15-01-06 Total Horizontal Product Length = 15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2" 605 / 0 151 / 0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection L/936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA -STRAND® RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 39 of 83 - _•__ . 6Boise Cascade Single 16" BCI® 4500s-1.8� 1st FlooAFloor JoistsU3(i760) - 07 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer. Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page-40 of 83 =_ IaBolse Cascade 6 - Single 16" BCI® 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st FloorTloor JoistslJ3(i760) - 08 (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J3(i760) Specifier: Designer: Company: 15-01-06 Total Horizontal Product Length = 15-01-06 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live 131,2" 605/0 151/0 B2, 2" 605 / 0 151 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2777 ft-Ibs 67.9% 100% 1 07-06-08 End Reaction 756 Ibs 69.9% 100% 1 00-00-00 End Shear 739 Ibs 37.4% 100% 1 00-02-00 Hole #1 Shear 358 Ibs 65.2% 100% 3 04-06-00 Hole #2 Shear 355 Ibs 64.7% 100% 4 10-07-00 Total Load Deflection U936 (0.191 ") 38.5% n\a 1 07-06-08 Live Load Deflection L/1170 (0.153") 41.0% n\a 6 07-06-08 Max Defl. 0.191" 19.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular.. Horizontal % Allow % Allow Bearing Supports Dim. (LW) Value Support Member Material B1 Hanger 2" x 1-3/4" 756 Ibs 45.4% 69.9% IUS1.81/16 B2 Hanger 2" x 1-3/4" 756 Ibs 65.7% 69.9% ITS1.81/16 BC FloorValue® Summary BC FloorValue@: OMIAM Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at 131 is a Double 1-3/4" x 16" VERSA-STRANDO RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 41- of 83 _ 4: Boise cascade -- Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW(U60) - 08 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i760) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@), VERSA -RIM PLUS@) , _ Page 42 of•83 . -- 613oise Cascade ffl= Single 16" BCI® 4500s-1.8 SSE BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 1st FloorTloor JoistsU3(i783) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J3(i783) Specifier: Designer: Company: 2 B1 15-01-06 Total Horizontal Product Length=15-01-06 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 566/0 142/0 B2, 2" 572 / 0 143 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-01-06 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 15-01-06 Top 36 9 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2629 ft-Ibs 64.3% 100% 1 07-06-08 End Reaction 715 Ibs 66.2% 100% 1 15-01-06 End Shear 700 Ibs 35.4% 100% 1 00-02-00 Hole #1 Shear 338 Ibs 61.7% 100% 3 04-06-00 Hole #2 Shear 336 Ibs 61.3% 100% 4 10-07-00 Total Load Deflection U989 (0.181") 36.4% n\a 1 07-06-08 Live Load Deflection U1236 (0.145") 38.8% n\a 6 07-06-08 Max Defl. 0.181" 18.1% n\a 1 07-06-08 Span / Depth 11.2 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-06-00 8" L 12" Circular Horizontal H02 10-07-00 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 708 Ibs 42.5% 65.5% IUS1.81/16 B2 Hanger 2" x 1-3/4" 715 Ibs 62.2% 66.2% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-06-11 Cautions Header for the hanger IUS1.81/16 at B1 is a Double 1-3/4" x 16" VERSA -STRAND® RIM. Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 43 of 83 =._-; 2- Boise cascade E�29 Single 16" BCI® 4500s-1.8 1st Flooffloor JoistsW3(i783) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J3(i783) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@) , Page 44_.of 83 - - Boise Cascade ffl� Single 16" BCI® 4500s-1.8 SS D 1st Flooffloor JoistsW4(i769) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J4(i769) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: L L 15-11-05 B1 132 Total Horizontal Product Length=15-11-05 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 568/0 142/0 B2, 2" 568 / 0 142 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End . Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 15-11-05 Top 71 18 n\a Controls Summary Value %Allowable Duration Case Location Pos. Moment 2757 ft-Ibs 67.4% 100% 1 07-11-02 End Reaction 710 Ibs 65.7% 100% 1 00-00-00 End Shear 696 Ibs 35.2% 100% 1 00-02-00 Hole #1 Shear 448 Ibs 81.6% 100% 3 03-02-05 Hole #2 Shear 388 Ibs 70.8% 100% 4 11-11-05 Total Load Deflection U907 (0.208") 39.7% n\a 1 07-11-02 Live Load Deflection U1134 (0.167") 42.3% n\a 6 07-11-02 Max Defl. 0.208" 20.8% n\a 1 07-11-02 Span / Depth 11.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 03-02-05 8" L 12" Circular Horizontal H02 11-11-05 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 -Hanger 2" x 1-3/4" 710 Ibs 52.2% 65.7% IUS1.81/16 B2 Hanger 2" x 1-3/4" 710 Ibs 61.8% 65.7% ITS1.81/16 BC FloorValue® Summary BC FloorValue@: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-11-10 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 45 of 83-- • Boise cascade Single 16" BCI® 4500s-1.8 1st Flooffloor JoistslJ4(i769) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J4(i769) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 46 of 83 = _ r Boise Cascade 99E Single 16" BCI® 4500s-1.8 SS I 1st Flooffloor JoistSU5(i780) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J5(i780) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 1 o a 15-03-02 Total Horizontal Product Length = 15-03-02 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2" 505 / 0 126 / 0 B2, 2" 505 / 0 126 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (Ib/ft) L 00-00-00 15-03-02 Top 66 17 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 2343 ft-Ibs 57.3% 100% 1 07-07-12 End Reaction 631 Ibs 58.4% 100% 1 00-00-00 End Shear 618 Ibs 31.3% 100% 1 00-02-00 Hole #1 Shear 292 Ibs 53.3% 100% 3 04-07-12 Hole #2 Shear 300 Ibs 54.6% 100% 4 10-08-12 Total Load Deflection U1102 (0.164") 32.7% n\a 1 07-07-12 Live Load Deflection U1377 (0.131 ") 34.9% n\a 6 07-07-12 Max Defl. 0.164" 16.4% n\a 1 07-07-12 Span / Depth 11.3 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 04-07-12 8" L 12" Circular Horizontal H02 10-08-12 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxM Value Support Member * Material B1 Hanger 2" x 1-3/4" 631 Ibs 46.4% 58.4% IUS1.81/16 B2 Hanger 2" x 1-3/4" 631 Ibs 54.9% 58.4% ITS1.81/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 07-07-09 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Header for the hanger ITS1.81/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS1.81/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 47 of 81 8Boise Cascade Single 16" BCI® 4500s-1.8 P 1st Flooffloor JoistsW5(i780) (Floor Joist) BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J5(i780) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC® analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValueO , VERSA -LAM), VERSA -RIM PLUS@ , Page 48 of 83 :-. Boise Cascade Single 16" BCI® 4500s-1.8 BC CALC@ Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 B1 1st Floor\Floor Joists\J6(i714) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J6(i714) Specifier: Designer: Company: 03-08-03 Total Horizontal Product Length = 03-08-03 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,4" 25/0 6/0 B2, 2" 27/0 7/0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-04-00 03-08-00 Top 15 4 n\a 2 FC1 Floor Material Conc. Pt. (Ibs) L 00-03-00 00-03-00 Top 1 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 26 ft-Ibs 0.6% 100% 1 01-11-01 End Reaction 33 Ibs 3.1 % 100% 1 03-08-03 End Shear 30 Ibs 1.5% 100% 1 00-04-00 Total Load Deflection U999 (0") n\a n\a 1 01-11-01 Live Load Deflection U999 (0") n\a n\a 2 01-11-01 Max Defl. 0" n\a n\a 1 01-11-01 Span / Depth 2.5 % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material 131 Wall/Plate 4" x 1-3/4" 31 Ibs 0.5% 2.1 % Unspecified B2 Hanger 2" x 1-3/4" 33 Ibs 2.4% 3.1 % IUS1.81/16 BC FloorValue® Summary BC FloorValue@: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 02-02-05 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC@ analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAMTm, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 49 of •613olse cascade Single 16" BCI® 4500s-1.8 SBD 1st FloorTloor JoistslJ6(i742) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J6(i742) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: v 131 03-01-11 Total Horizontal Product Length = 03-01-11 B2 Reaction Summary (Down / Uplift) (Ibs) 131 03-01-11 Total Horizontal Product Length = 03-01-11 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 171/0 42/0 B2, 9-3/4" 376 / 0 93 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 03-01-11 Top 4 1 n\a 2 J6(i714) Cone. Pt. (Ibs) L 00-07-02 00-07-02 Top 26 6 n\a 3 J5(i780) Cone. Pt. (Ibs) L 01-08-13 01-08-13 Top 510 127 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 305 ft-Ibs 7.5% 100% 1 01-08-13 End Reaction 469 Ibs 31.8% 100% 1 03-01-11 End Shear 466 Ibs 23.6% 100% 1 02-03-15 Total Load Deflection U999 (0.003") n\a n\a 1 01-08-13 Live Load Deflection U999 (0.003") n\a n\a 2 01-08-13 Max Defl. 0.003" n\a n\a 1 01-08-13 Span / Depth 1.7 % Allow % Allow Bearing Supports Dim. (LxMo Value Support Member Material B1 Hanger 2" x 1-3/4" 213 Ibs 12.8% 19.7% IUS1.81/16 B2 Wall/Plate 9-3/4" x 1-3/4" 469 Ibs 3.1 % 31.8% Unspecified BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 01-04-04 Cautions Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Page 50 of 83 %_. Boise cascade 999 Single 16" 13C10 4500s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st Flooffloor Jo1sts1J6(i742) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J6(i742) Specifier: Designer: - Company: Design meets User specified (L1360) Total load deflection criteria. Design meets User specified (1-/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 51 of 83 y _ Boise Cascade 11929 Single 16" BCI® 4500s-1.8 1st Flooffloor JoistSU6(i746) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1st Floor\Floor Joists\J6(i746) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 u 03-04-03 Total Horizontal Product Length = 03-04-03 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 310/0 78/0 B2, 2" . 269 / 0 67 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 J4(i769) Conc. Pt. (Ibs) L 01-06-13 01-06-13 Top 579 145 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 565 ft-Ibs 13.8% 100% 1 01-06-12 End Reaction 387 Ibs 35.8% 100% 1 00-00-00 End Shear 387 lbs 19.6% 100% 1 00-02-00 Total Load Deflection U999 (0.007") n\a n\a 1 01-06-12 Live Load Deflection U999 (0.005") n\a n\a 2 01-06-12 Max Defl. 0.007" n\a n\a 1 01-06-12 Span / Depth 2.4 % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 1-3/4" 387 Ibs 28.5% 35.8% IUS1.81/16 B2 Hanger 2" x 1-3/4" 337 Ibs 20.2% 31.2% IUS1.81/16 BC FloorValue(D Summary BC FloorValue@): INSEZ Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 01-09-05 Cautions Hanger IUS1.81/16 requires (14) 10dx1.5 face nails, (2) Strong -Grip joist nails. Header for the hanger IUS1.81/16 at B2 is a Double 1-3/4" x 16" VERSA -STRAND@ RIM Hanger IUS1.81/16 requires (14) 10d face nails, (2) Strong -Grip joist nails. Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 52 of 83 4•:, Boise Cascade Single 16" BCI® 6000s-1.8 AE 1st Flooffloor JoistsW(U48) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i748) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 20-02-08 Total Horizontal Product Length = 20-02-08 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 5=1/2" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 5-1/2" x 2-5/16" 996 Ibs 18.4% 64.2% Unspecified BC FloorValue® Summa BC FloorValue®: 2, UK •_F_ , 7 7 Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 53 of 83 -_ - 8Boise Cascade Single 16" BCI® 6000s-1.8 E BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st Flooffloor JoistsU7(1748) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J7(i748) Specifier: Designer: Company: Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC® analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC®, BC FRAMER®, AJS-, ALLJOIST®, BC RIM BOARD-, BCI® , BOISE GLULAM-, BC FloorValue® , VERSA -LAM®, VERSA -RIM PLUS®, Page 54-of 83- :`= 0 Boise Cascade Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7239 1st FloorlFloor JoistsW(U54) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Job name: File name: N358611 L&R.mmdl Address: ' Description: 1st Floor\Floor Joists\J7(i754) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: O B1 20-02-08 Total Horizontal Product Length = 20-02-08 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live. B1,2" 797/0 199/0 B2, 5-1/2" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value %Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 lbs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LX1N) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 5-1/2" x 2-5/16" 996 Ibs 18.4% 64.2% Unspecified BC FloorValue® Summary BC FloorValue@: N:11-77= Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 55 of Boise Cascade= Single 16" BCI® 6000s-1.8E 1st FloorTloor JoistslJ7(i754) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24; 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i754) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValueO , VERSA -LAM@, VERSA -RIM PLUSO , Page 56, of 83 Boise cascade Single 16" BCI® 6000s-1.8 PSSEI BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 1st Flooffloor JoistslJ7(i754) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J7(i754) Specifier: Designer: Company: Q= . I, L 20-02-08 B1 B2 Total Horizontal Product Length = 20-02-08 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 5-1/2" • 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4854 ft-lbs 88.3% 100% 1 09-11-08 End Reaction 996 lbs; 78.5% 100% 1 00-00-00 End Shear 979 lbs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 lbs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 lbs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 lbs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 - .8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (Lxffl Value Support Member Material B1 Hanger 2" x 2-5/16" 996 lbs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 5-1/2" x 2-5/16" 996 lbs 18.4% 64.2% Unspecified BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 57 of 83_ Boise Cascade Single 16" BCI® 6000s-1.8 1st FloorlFloor JoistslJ7(i754) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i754) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Pa9e 58 of 83 = = 8MIEN Boise Cascade Single 16" BCIO 6000s-1.8 I�SSE 1st Flooffloor Joists\J7(U59) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i759) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 2 3 1 20-01.00 131 132 Total Horizontal Product Length = 20-01-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2' 677/0 169/0 B2, 4" 692 / 0 173 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 03-09-00 Top 26 6 n\a 3 FC1 Floor Material Unf. Lin. (Ib/ft) L 03-09-00 20-01-00 Top 29 7 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4180 ft-Ibs 76.1% 100% 1 09-11-06 End Reaction 846 Ibs 66.7% 100% 1 00-00-00 End Shear 844 Ibs 38.8% 100% 1 19-09-00 Hole #1 Shear 471 Ibs 77.9% 100% 3 05-00-00 Hole #2 Shear 172 Ibs 28.5% 100% 4 10-00-04 Hole #3 Shear 474 Ibs 78.4% 100% 6 14-11-14 Total Load Deflection U608 (0.389") 59.2% n\a 1 09-11-06 Live Load Deflection U760 (0.311") 63.2% n\a 8 09-11-06 Max Defl. 0.389" 38.9% n\a 1 09-11-06 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 846 Ibs 73.6% 66.7% ITS2.37/16 B2 Wali/Plate 4" x 2-5/16" 865 Ibs 10.7% 55.8% Unspecified BC FloorValue@ Summary BC FloorValue®: to Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 59 of 83-_<. -:: V � Boise Cascade - Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: 1st Flooffloor JoistsW7(i759) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J7(i759) Specifier: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 60. of 83 *Boise Cascade Single 16" BCI® 60005-1.8 LSD 1st Floor\Floor JoistslJ7(i763) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i763). City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 20-01-00 Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1% 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified BC FloorValue® Summary BC FloorValue®: -1 Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 61 of 83 :� -_ ffiffm Boise Cascade Single 16" BCI® 6000s-1.8 FUSSED 1st Flooffloor JoistsW7(i763) (Floor Joist) BC CALCO Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(1763) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@), BOISE GLULAM-, BC FloorValueO , VERSA-LAMO, VERSA -RIM PLUSO , Page 62 of 83 Boise Cascade E�2 Single 16" BCI® 6000s-1.8 BC CALC® Member Report Build 7239 Job name: Address: City, State, Zip: Customer: 1st Flooffloor JoistsW(U63) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J7(i763) Specifier: Designer: Code reports: ESR-1336 Company: B1 O ►_e 2a-01-00 Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1,2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxV4 Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 63-_of 83_ A. .. Boise cascade EMEE Single 16" BCI® 6000s-1.8 1st Flooffloor Joists\J7(i763) - 01 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i763) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMERO , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 64 of 83- - = OBoise Cascade Single 16" BCI® 6000s-1.8 I��SSED 1st Flooffloor JoistsW(U63) - 02 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i763) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 20-01-00 Total Horizontal Product Length = 20-01-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2". 797 / 0 199 / 0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1% 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified BC FloorValue® Summary BC FloorValue@: Y FSubfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 65 of 83 r: Boise cascade - Single 16" BCI® 6000s-1.8 IP�E 1st Flooffloor JoistslJ7(1763) - 02 (Floor Joist) BC CALC@ Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i763) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (U360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75') Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALC@ analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@), BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValueO , VERSA -LAM@, VERSA -RIM PLUS@ , Page 66 of 83-r V- Boise Cascade Single 16" BCl@ 60005-1.8 1st FloorTloor JoistsW(U63) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J7(i763) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 20-01-00 Total Horizontal Product Length = 20-01-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value %Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified BC FloorValue® Summary BC FloorValue@: 27, . Subfloor: 3/4" OSB, Glue +Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 67 of 83 Boise cascade Single 16" BCI® 6000s-1.8 PASSE 1st FloorTloor JoistsW(i763) - 03 (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Flooffloor Joists\J7(i763) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValueO , VERSA -LAM@, VERSA -RIM PLUS@ , Page 68 of 83-- Single 16" BCIO 6000s-1.8 6Boise Cascade BC CALC® Member Report Build 7239 Job name: Address: 1st Flooffloor Joists\J7(i770) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J7(i770) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: O B1 20-01-00 Total Horizontal Product Length = 20-01-00 B2 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 2" 797/0 199/0 B2, 4" 797 / 0 199 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4854 ft-Ibs 88.3% 100% 1 09-11-08 End Reaction 996 Ibs 78.5% 100% 1 00-00-00 End Shear 979 Ibs 45.0% 100% 1 00-02-00 Hole #1 Shear 544 Ibs 90.1 % 100% 3 05-00-00 Hole #2 Shear 201 Ibs 33.2% 100% 4 10-00-04 Hole #3 Shear 550 Ibs 91.1 % 100% 6 14-11-14 Total Load Deflection U523 (0.452") 68.8% n\a 1 09-11-08 Live Load Deflection U654 (0.362") 73.4% n\a 8 09-11-08 Max Defl. 0.452" 45.2% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular - Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 996 Ibs 86.6% 78.5% ITS2.37/16 B2 Wall/Plate 4" x 2-5/16" 996 Ibs 12.3% 64.2% Unspecified BC FloorValue@ Summary BC FloorValue®: OMMOMMERREN 17 77 f 71 Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 69 of 83 Boise cascade ME99 Single 16" BCI® 6000s-1.8 ISE 1st FloorTloor JoistslJ7(1770) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i770) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAW, VERSA -RIM PLUS@ , Page 70 of 83 -• s . Boise Cascade - — O 6000s-1.8 ASS Single 16" BCI 1st Floor\Floor Joists\J7(i773) (Floor Joist) BC CALC® Member Report Dry I 1 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i773) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: i_ (D o L L 20-00-08 131 B2 Total Horizontal Product Length = 20-00-08 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 2" 607 / 0 152 / 0 B2, 3-1/2" 607 / 0 152 / 0 Load Summary Live Dead Snow Wind Roof OCs Live Tag Description Load Type Ref. Start End Loc. 100%" 90%" 115%" 160% 125%" 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-00-00 19-11-00 Top 61 15 n\a Controls Summary Value %Allowable Duration Case Location Pos. Moment 3697 ft-Ibs 67.3% 100% 1 09-11-08 End Reaction 758 Ibs 59.8% 100% 1 00-00-00 End Shear 746 Ibs 34.3% 100% 1 00-02-00 Hole #1 Shear 415 Ibs 68.6% 100% 3 05-00-00 Hole #2 Shear 153 Ibs 25.3% 100% 4 10-00-04 Hole #3 Shear 419 Ibs 69.3% 100% 6 14-11-14 Total Load Deflection U687 (0.344") 52.4% n\a 1 09-11-08 Live Load Deflection U858 (0.275") 55.9% n\a 8 09-11-08 Max Defl. 0.344" 34.4% n\a 1 09-11-08 Span / Depth 14.8 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 05-00-00 8" L 12" Circular Horizontal H02 10-00-04 8" L 12" Circular Horizontal H03 14-11-14 8" L 12" Circular Horizontal % Allow %" Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Hanger 2" x 2-5/16" 758 Ibs 65.9% 59.8% ITS2.37/16 B2 Wall/Plate 3-1/2" x 2-5/16" 758 Ibs 10.7% 48.9% Unspecified BC FloorValue@ Summary BC FloorValue®: - - Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-11-08 Cautions Header for the hanger ITS2.37/16 at B1 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page-71 -of 83 _s 613olse Cascade Single 16" BCI® 6000s-1.8 P�EI 1st Flooffloor JoistslJ7(i773) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611L&R.mmdl Address: Description: 1st Floor\Floor Joists\J7(i773) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALL® analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMERO , AJS- ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA-LAMO, VERSA -RIM PLUS@ , Page 72 of 83. = =__ Single 16" BCIO 6000s-1.8 OBoise Cascade FiffM BC CALC® Member Report Build 7239 Job name: Address: 1st FloorTloor JoistslJB(i753) (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J8(i753) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: ........................ O e® B1 19-01-00 Total Horizontal Product Length = 19-01-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live ' B1, 3-1/2" 611 / 0 153 / 0 B2, 2" 614/0 154/0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 65 16 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 3559 ft-Ibs 64.8% 100% 1 09-06-15 End Reaction 768 Ibs 60.5% 100% 1 19-01-00 End Shear 754 Ibs 34.7% 100% 1 00-03-08 Hole #1 Shear 209 lbs 34.6% 100% 3 08-05-11 Total Load Deflection U741 (0.304") 48.6% n\a 1 09-06-15 Live Load Deflection U926 (0.243") 51.8% n\a 4 09-06-15 Max Defl. 0.304" 30.4% n\a 1 09-06-15 Span / Depth 14.1 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 3-1/2" x 2-5/16" 764 Ibs 10.8% 49.3% Unspecified B2 Hanger 2" x 2-5/16" 768 Ibs 66.8% 60.5% ITS2.37/16 BC FloorValue@ Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-07-04 Cautions Header for the hanger ITS2.37/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 73 of 83 Single 16" BCI® 6000s-1.8 !! SSED Boise Cascade 1st Floor\Floor JoistslJ8(i753) (Floor Joist) BC CALCO Member Report Dry 1 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 File name: N358611 L&R.mmdl Job name: Description: 1st Floor\Floor Joists\J8(i753) Address: Specifier: City, State, Zip: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 / before installation. BC CALCO, BC FRAMERO , AJS7' ALLJOISTO , BC RIM BOARDW BOISE GLULAM-, BC Floor` VERSA -LAM@, VERSA -RI' Page 74 of 83> 813olse Cascade = Single 16" BCI® 6000s-1.8 SE 1st FloorlFloor JoistslJ9(1751) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J9(i751) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: 131 O 19-01-00 Total Horizontal Product Length = 19-01-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B 1, 4" 787 / 0 196 / 0 B2, 2" 748 / 0 187 / 0 Load Summary Live Dead Snow Wind Roof ocs Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 40 10 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 00-04-00 03-08-00 Top 15 4 n\a 3 FC1 Floor Material Unf. Lin. (lb/ft) L 03-09-01 19-01-00 Top 37 9 n\a 4 J6(i742) Conc. Pt. (Ibs) L 03-09-01 03-09-01 Top 166 41 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4472 ft-Ibs 81.4% 100% 1 09-03-08 End Reaction 935Ibs 73.7% 100% 1 19-01-00 End Shear 975 lbs 44.8% 100% 1 00-04-00 Hole #1 Shear 242 Ibs 40.1 % 100% 3 08-05-11 Hole #2 Shear 542 Ibs 89.7% 100% 4 14-06-11 Total Load Deflection L/587 (0.382") 61.3% n\a 1 09-06-05 Live Load Deflection U734 (0.306") 65.4% n\a 6 09-06-05 Max Defl. 0.382" 38.2% n\a 1 09-06-05 Span / Depth 14.0 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 4" x 2-5/16" 983 Ibs 12.1 % 63.4% Unspecified B2 Hanger 2" x 2-5/16" 935 Ibs 81.3% 73.7% ITS2.37/16 BC FloorValue® Summary BC FloorValue®: pffl Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-07-08 Cautions Header for the hanger ITS2.37/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 75-of 83_ I Boise Cascade 99 Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7239 Job name: Address: 1st Flooffloor JoistslA(iM) (Floor Joist) Dry 11 span I No cant. 124 OCS I Non -Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J9(i751) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page 76 of 83� *Boise Cascade lip Single 16" BCI® 6000s-1.8 P�SSIi:�9 1st FloorTloor JoistSW9(i765) (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J9(i765) City, State, Zip: Specifier: - Customer: Designer: Code reports: ESR-1336 Company: 0 0 B1 19-01.00 Total Horizontal Product Length = 19-01-00 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1, 5-1/2" 762 / 0 190 / 0 B2, 2" 752 / 0 188 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4318 ft-Ibs 78.6% 100% 1 09-08-04 End Reaction 940 Ibs 74.1% 100% 1 19-01-00 End Shear 923 Ibs 42.4% 100% 1 00-05-08 Hole #1 Shear 262 Ibs 43.4% 100% 3 08-05-11 Hole #2 Shear 529 Ibs 87.5% 100% 4 14-06-11 Total Load Deflection U615 (0.363") 58.5% n\a 1 09-08-04 Live Load Deflection U769 (0.29") 62.4% n\a 6 09-08-04 Max Defl. 0.363" 36.3% n\a 1 09-08-04 Span / Depth 13.9 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 5-1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37/16 BC FloorValue® Summa BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-08-04 Cautions Header for the hanger ITS2.37/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 77.of 83- Boise cascade Single 16" BCI® 6000s-1.8 FAQ 1st Flooffloor JoistsU9(1765) (Floor Joist) BC CALCO Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1st Floor\Floor Joists\J9(1765) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@), VERSA -RIM PLUSO , Page 78 of 83_> ;_ 1 l 61301se , Cascade Single 16" BCI® 6000s-1.8 PBB�I 1st FloorTloor JoistslJ9(i765) - 01 (Floor Joist) BC CALC® Member Report Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 Build 7239 Job name: File name: N358611 L&R.mmdl Address: Description: 1 st Floor\Floor Joists\J9(i765) City, State, Zip: Specifier: Customer: Designer: Code reports: ESR-1336 Company: B1 O 19-01-00 Total Horizontal Product Length=19-01-00 132 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 5-1/2" 762 / 0 190 / 0 B2, 2" 752 / 0 188 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4318 ft-Ibs 78.6% 100% 1 09-08-04 End Reaction 940 Ibs 74.1% 100% 1 19-01-00 End Shear 923 Ibs 42.4% 100% 1 00-05-08 Hole #1 Shear 262 Ibs 43.4% 100% 3 08-05-11 Hole #2 Shear 529 Ibs 87.5% 100% 4 14-06-11 Total Load Deflection U615 (0.363") 58.5% n\a 1 09-08-04 Live Load Deflection U769 (0.29") 62.4% n\a 6 09-08-04 Max Defl. 0.363" 36.3% n\a 1 09-08-04 Span / Depth 13.9 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LxW) Value Support Member Material B1 Wall/Plate 5-1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37/16 BC FloorValue® Summary BC FloorValue®: Subfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-08-04 Cautions Header for the hanger ITS2.37/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 79 of 83.__ Boise`Cascade Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st FloorTloor JoistslJ9(1765) - 01 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Floor Joists\J9(i765) Specifier: Designer: Company: Design meets User specified (1-/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@) , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValueO , VERSA-LAMO, VERSA -RIM PLUS@ , Page 80 of 83 - _w_ - Boise Cascade Single 16" BCIO 6000s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: 1st FloorlFloor Joists\J9(i765) - 02 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611L&R.mmdl Description: 1 st Floor\Floor Joists\J9(i765) Specifier: Designer: Code reports: ESR-1336 Company: Q 0 L L 19-01-00 1311 132 Total Horizontal Product Length=19-01-00 Reaction Summary (Down / Uplift) (Ibs) Bearing Live Dead Snow Wind Roof Live B1, 5-1/2" 762 / 0 190 / 0 B2, 2" 752 / 0 188 / 0 Load Summary Live Dead Snow Wind Roof OCS Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 1 FC1 Floor Material Unf. Lin. (lb/ft) L 00-02-00 19-01-00 Top 80 20 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 4318 ft-Ibs 78.6% 100% 1 09-08-04 End Reaction 940 Ibs 74.1% 100% 1 19-01-00 End Shear 923 Ibs 42.4% 100% 1 00-05-08 Hole #1 Shear 262 Ibs 43.4% 100% 3 08-05-11 Hole #2 Shear 529 Ibs 87.5% 100% 4 14-06-11 Total Load Deflection U615 (0.363") 58.5% n\a 1 09-08-04 Live Load Deflection U769 (0.29") 62.4% n\a 6 09-08-04 Max Defl. 0.363" 36.3% n\a 1 09-08-04 Span / Depth 13.9 Hole Location Valid Hole Summary Center Elevation Ref. Height Width Shape Orientation H01 08-05-11 8" L 12" Circular Horizontal H02 14-06-11 8" L 12" Circular Horizontal % Allow % Allow Bearing Supports Dim. (LXW) Value Support Member Material B1 Wall/Plate 5-1/2" x 2-5/16" 952 Ibs 17.6% 61.4% Unspecified B2 Hanger 2" x 2-5/16" 940 Ibs 81.7% 74.1 % ITS2.37/16 BC FloorValue® Summary BC FloorValue@: NMWFTMIDSubfloor: 3/4" OSB, Glue + Nail Minimum Enhanced Premium Subfloor Rating: Code Minimum Controlling Location: 09-08-04 Cautions Header for the hanger ITS2.37/16 at B2 is a Double 2 x 10 SPF SS. Hanger ITS2.37/16 requires (2) 10d face nails, (4) 10d TF nails, (2) Strong -Grip joist nails. Page 81 of 83 �i Boise Cascade Single 16" BCI® 6000s-1.8 BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1336 Notes 1st FloorlFloor JoistslJ9(i765) - 02 (Floor Joist) Dry 11 span I No cant. 124 OCS I Repetitive I Glued & nailed March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1 st Floor\Floor Joists\J9(i765) Specifier: Designer: Company: Design meets User specified (1-/360) Total load deflection criteria. Design meets User specified (L/480) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Simpson Strong -Tie, Inc. BC CALCO analysis is based on IBC 2009. Composite El value based on 3/4" thick OSB sheathing glued and nailed to member. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALC@, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCI@ , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUS@ , Page_82 of 83_ , Boise LCascade BC CALCO Member Report Build 7239 Job name: Address: City, State, Zip: Customer: Code reports: ESR-1040 B1 Double 1-3/4" x 16" VERSA -LAM® 2.0 3100 SP PASSED 1st Floor\Flush Beams\BM1(i743) (Flush Beam) Dry 11 span I No cant. March 24, 2020 08:14:39 File name: N358611 L&R.mmdl Description: 1st Floor\Flush Beams\BM1(i743) Specifier: Designer: Company: 20-01-02 Total Horizontal Product Length = 20-01-02 B2 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B 1, 7" 3879 / 0 1136 / 0 B2, 2" 3187 / 0 957 / 0 Load Summary Live Dead Snow Wind Roof Tributary Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 0 Self -Weight Unf. Lin. (Ib/ft) L 00-00-00 20-01-02 Top 16 00-00-00 1 Smoothed Load Unf. Lin. (lb/ft) L 00-00-00 17-03-11 Top 320 80 n\a 2 FC1 Floor Material Unf. Lin. (lb/ft) L 03-09-01 20-01-02 Top 39 10 n\a 3 J6(i746) Cone. Pt. (Ibs) L 03-09-15 03-09-15 Top 271 68 n\a 4 J3(i783) Cone. Pt. (Ibs) L 18-03-11 18-03-11 Top 575 144 n\a Controls Summary Value % Allowable Duration Case Location Pos. Moment 21796 ft-Ibs 58.3% 100% 1 10-03-11 End Shear 4199 Ibs - 39.5% 100% 1 01-11-00 Total Load Deflection U377 (0.62") 63.7% n\a 1 10-03-10 Live Load Deflection U488 (0.479") 73.7% n\a 2 10-03-10 Max Defl. 0.62" 62.0% n\a 1 10-03-10 Span / Depth 14.6 % Allow % Allow Bearing Supports Dim. (LxM Value Support Member Material 61 Wall/Plate 7" x 3-1/2" 5015 Ibs 23.4% 27.3% Unspecified B2 Hanger 2" x 3-1/2" 4144 Ibs n\a 78.9% Hanger Cautions Hanger model Hanger was not found. Hanger has not been analyzed for adequate capacity. Notes Design meets Code minimum (L/240) Total load deflection criteria. Design meets Code minimum (L/360) Live load deflection criteria. Design meets arbitrary (1") Maximum Total load deflection criteria. Design meets arbitrary (0.75") Maximum live load deflection criteria. Calculations assume member is fully braced. Hanger Manufacturer: Unassigned BC CALCO analysis is based on IBC 2009. Design based on Dry Service Condition. Disclosure Use of the Boise Cascade Software is subject to the terms of the End User License Agreement (EULA). Completeness and accuracy of input must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy, prior to anyone relying on such output as evidence of suitability for a particular application. The output here is based on building code -accepted design properties and analysis methods. Installation of Boise Cascade engineered wood products must be in accordance with current Installation Guide and applicable building codes. To obtain Installation Guide or ask questions, please call (800)232-0788 before installation. BC CALCO, BC FRAMER@ , AJS-, ALLJOISTO , BC RIM BOARD-, BCIO , BOISE GLULAM-, BC FloorValue@ , VERSA -LAM@, VERSA -RIM PLUSO , Page 83 of 83 Boise Engine Cascade ed Wood Products cuternative t'yower ang nano unven Nailing a Multiple Ply 1 3/4" Wide VERSA -LAM° Beams When using multiple ply 1 3W VERSA -LAM® beams to create a wider member, the connection of the plies is as critical as determining the beam size. When side loaded beams are not connected properly, the inside plies do not support their share of the load and thus -the load carrying capacity of the full member decreases significantly. BC CALC® reports show a connection detail for connecting multiple ply 1 3/4' VERSA -LAM® beams. BC CALC® reports will either show the member having no side loads or the calculated side load. When the nails shown on the connection detail are not readily available on the job site, the following table may be used to substitute power driven nails or hand driven nails. Example: Connection detail on the BC CALC® report shows 16d sinker nails at 12" o.c. As an alternative, 3" x 0.131" power driven nails can be used at 8" o.c. or 16d common nails can be used at 14" o.c. As Shown on BC Power Driven Nails Hand Driven Nails CALCO Report -dam' rM NN ECNO co YT x0M 5 VN 0 17 Nail rn C� xo �C) V- -a= �� V x CO - x _ C'7 - x \ CO \ coy O CO CO CO CAL) r CO Ce) CO 24" 24" 20" 16" 12", 24" 20" 16" 16d Common 12" 12" 10" 8" 6" 12" 10" 8" 3 1/z" x 0.162' 6" 6" N/A N/A N/A 6" N/A N/A 24" 24" 24" 18" 16" 24" 24" 20" 16d Sinker .12" 14" 12" 8" 8" 1 14" 12" 1 10" 31/a " x 0.148" 6" 6" 6" N/A N/A 6" 6" N/A 24" 24" 24" 22" 18" 24" 24" 24" Bo�x -12„ 16" 12„ 10„ 8„ 16„ 12„ „ 12 3 116d 0 135" 611 813 6 N/A N/A 8 6 6 �_ a =. � _ ,_.Imo_ Alternate On -Center Spacing Notes: • For multiple ply 1 3/a" VERSA -LAM® beams with only top load, beam may be fastened at 24" o.c. for all nails shown above (top mounted hangers shall be analyzed as side loads). • Use end distance, edge distance, row spacing and number of rows shown on connection detail found on BC CALC® Report. • Alternate nailing not available for all nail types. • Contact professional of record for connection design of side -loaded point loads beyond what is shown in Boise Cascade Tech Note LVL-4 and LVL-10. • Table is not applicable for 1 1/2' wide VERSA -LAM® beams. Tech Note LVL-17 Page 1 of 1 11/12 C C F Boise Cascade® ENGINEERED WOOD PRODUCTS tion Temporary Storage of Masonry Block on BCI®/ AJS° Joist Floors In areas where concrete masonry block is used in the construction of walls, limited job site space may require the short-term storage of blocks on a BCI®/ AJS® floor. Because of the significate weight, caution should be used in the block stack placement location and size. The following guidelines shall be followed. General Notes • Limits based upon a normal weight concrete masonry unit (8x8xl 6) weight of 37 pounds (Reinforced Masonry Engineering Handbook, Masonry Institute of America). • No more than one masonry block stack shall be placed on any joist. • Limits shown are valid for all series and depths if the specific floor joists are properly sized for the occupancy design loads. • BCI° / AJS° joist shall not be spaced greater than 24" on -center. Floor sheathing shall be designed by the structure's design professional of record and installed properly prior to block storage. • The floor shall not be loaded with concrete masonry block for a period longer than three days. • Avoid allowing the joists or floor sheathing to get wet before or during loading. Wet wood may take a permanent set under load in the deflected shape. No Shoring Required 8" tall masonry block stack maximum 48" x 48" footprint, maximum 2 courses tall BCl/AJS Joists, max 24" o.c.s. Temporary Storage of Masonry Block Page 1 of 2 1`05/2019 Boise Cascade® ENGINEERED WOOD PRODUCTS • Masonry block stack may be placed anywhere along span length with the exception of no closer than 4'-0" from any intermediate bearing. • . Concrete masonry units (8x8xl 6) shall be stacked no higher than two courses tall by 48 inches wide. • Deviation of preceding provisions voids BCI® / AJS® product warranty. Shoring Required ot'llHJA J01515, max 24" o.c.s. mry block stack t8" x 48" footprint, 3 courses tall ssign by others VcQ1V 1 i „ y others • The design of the shoring members and transfer of load from the shoring is the responsibility of the design professional of record. Inadequate shoring design voids the BCI® / AJS® product warranty. • Concrete masonry units (8x8x16) shall be stacked no higher than six courses tall by 48 inches wide. Temporary Storage of Masonry Block Page 2 of 2 r05/2019 .P Boise Cascade Engineered Wood Products Technical Note Temporary Storage of Gypsum Wallboard o BCI°/AJS° Joists The practice of stacking gypsum wallboard on wood floors prior to the installation is common and necessary to the successful completion of any residential project. Because of the enormous weight, caution should be used in the placement location and size. The following guidelines are recommended -by Boise Cascade EWP Engineering. • Gypsum wallboard shall be stacked no higher than 11 inches (22 sheet limit for 1/2" gypsum board, 17 sheet limit for 5/8" gypsum board). • Placement of wallboard stacks in the middle of a room is not allowed. Loading in the middle of the joist span induces greater deflections compared to loads placed near the joist's supports. • No more than one gypsum stack shall be placed on a single joist. • Wallboard stacks shall be oriented with their long dimension perpendicular to the joist layout direction. In this orientation, more joists are supporting the wallboard. • The floor shall not be loaded with wallboard for a period longer than 4 weeks. • Avoid allowing the joists or floor sheathing to get wet while loaded. Wet wood will take a permanent set, which may be unsightly. Tech Note U-7 Page 1 of 1 r4i10 This product Is preferable to similar connactors because su of(a) easier Installation, (bJhigher loads,(c)lower Installed 73 R coat, or a combination of these features. - Simpson Strong -Tie offers a dedicated range of top -flange I-jolst hangers that meet the unique needs of I joists while offering superior performance and ease of Installation.. ITS The Innovative ITS sets the standard for engineered wood top - flange hangers. The ITS Installs faster and uses fewer nails than any other EWP top -flange hanger. The Strong -Grip' seat and Funnel Flange' features allow standard jolst Installation without requiring joist nails, resulting in the Lowest installed cost. The Strong -Grip seat firmly secures I joists with flange thicknesses from 1 %' to I lb". MIT/HIT — Positive -Angle Nailing (PAN) PAN is specifically designed for I joists when used with the MIT or HIT. With PAN, the nail hole material is not removed, but is formed to channel and confine the path of the nail at approximately 450. PAN minimizes splitting of the flanges while permitting time -saving nailing from a better angle. See top flange tables on pp, 173-182. Refer to joist manufacturer's literature or appropriate Simpson Strong -Tie Connector Selection Guide for actual joist sizes. Material: ITS — 18 gauge; Mrr, HIT — 16 gauge Finish: Galvanized Installation: • Use all specified fasteners. Verify that the header can take the required fasteners specified in the table, • See pp. 95-96 for more installation Information. • ITS — no joist nailing required for standard 1-joist Installation without web stiffeners. When supporting I -joists with web stiffeners or rectangular SCL member.(2) 0.148" x 1 W nails must be installed into optional triangle joist nail holes for standard installation values. • ITS — optional triangle nail holes may be used for additional load. See allowable load tables. • MIT — optional triangle nail holes may be used for Increased uplift capacity. See Optional Nailing For Increased Uplift table. • HIT — closed PAN nail holes may be used for increased uplift capacity. See Optional Nailing For Increased Uplift table. • For sloped joists up to'Is:12 there is no reduction, between 1/4:12 and up to'h:12, tests show a 10% reduction in ultimate hanger strength. Local crushing of the bottom flange or excessive deflection may be limiting; check with joist manufacturer for specific limitations on bearing of this type. Allowable Loads: • The fTS, MIT and HIT hangers have locations for optional nails if additional uplift is needed. Optional uplift nailing requires the addition of properly -secured web stiffeners. See the load tables for minimum required fasteners and allowable uplift loads. • For attaching 10 mUlti-ply headers, refer to technical bulletin T-C-MPLYHEADR at st:rongtie.corri. Options: • Because these hangers are fully die -formed, they cannot be modified. However these models will normally accommodate a skew of up to 5•. Codes: See p.12 for Code Reference Key Chart Optional lalstna0 oration - tor:uta OrMIT O%HIT Funnel flange Supports 1�/?-to iV thickflanges i The Strong -Grip- seat secures I joists in position withoutjoist nails. Typical MIT Installed. on a Double LVL HIT Installation on a 3x Nailer mounted on a Steel Beam (ITS, MIT similar) rSb'Jfiq-T,e tb/o Ud Y, ,-; r...,, SIMPSON Strong -Tie I -Joist Hangers e 6 This product Is preferable to similar connectors because of (a) easier Installation, (b) higher loads, (c) lower Installed cost, cra combination of these features. The IUS is a hybrid hanger that incorporates the advantages of the face -mount and top -mount hanger. Installation is fast with the i Strong -Grip' seat, easy -to -reach face nails and self jigging locator tabs. C The MIU series hangers are designed for commercial and high -load I joist applications without requiring web stiffeners. The MIU features O g Positive Angle Nailing (PAN), -which minimizes splitting of the flanges y V while permitting time -saving nailing from a better angle. - AMaterial: IUS — 18 gauge;. MIU —16 gauge E 3 Finish: Galvanized �o _3 Uplift Loads: 0aatt • Models have optional triangle joist nail holes for additional uplift. 0 H a Properly attached web stiffeners are required. 2 0 • MIU — add four additional 0.148° x 11hn joist nails fora total V uplift load of 975 lb. • IUS — add web stiffeners and two 0.148° x 11/2'jolst nails In the triangle holes for a total uplift of 365 lb. Installation: • Use all specified fasteners. Verity that the header can take the required fasteners specified in the table. See pp. 95-96 for more installation information. • IUS — fasten hanger to header. Position I joist into hanger and snap into place. No joist nailing required. Some IUS models have triangle and round header nall holes. To achieve max download, fill both round and triangle holes. • IUS — Locator tabs are not structural. They may be bent back to adjust for hanger placement. • IUS — for rimboard applications see technical bulletin T RIMBDHGR at strongtie.com. • IUS — I -joists with web stiffeners or rectangular sections can be used with the installation of (2) 0.1480 x 1 %a nails into the optional triangle joist nails. • IUS — web stiffeners are not required with I joists when the top flange is laterally supported by the sides of the hanger unless required by I joist manufacturer. Options • These hangers cannot be modified. However, these models will normally accommodate a skew of up to 51. For sloped joists up to 1/4:12 there is no reduction; between 1/4:12 and up to 1h;12, tests show a 10% reduction in ultimate hanger strength. Local crushing of the bottom flange or excessive deflection may be limiting; check with joist manufacturer for specific limitations on bearing of this type. Codes: See p.12 for Code Reference Key Chart Funnel 11AN flat tab oIUs (some VS models have triangle holes. in header flanges for min./max. nailing) U.S. Patent 6,523,321 IUS Installation Sequence Step 1 Attach the IUS to the header. The Strong -Grip'" seat secures 1-joists in position without joist nails. . Avoid a Misinstallation Do not make your own holes. Do not -nail the bottom flange. Step 2 Slide the 1-joist downward into the IUS until it rests above the large teardrop. MIU Step 3 Firmly push or snap I joist fully into the seat of the IUS. .MIU with Correct PAN Installation