HomeMy WebLinkAboutStegeman Guest Contract_000073 Contract
Guest Bathroom January 29,2021
George&Linda Stegeman #001
248-762-1626 - linda6gr@aol.com
9550 S.Ocean Drive,Unit 1108,Jensen Beach,FL 34957
Project#: 21007-Islandia I- 1108-Stegeman
LABOR AND MATERIAL REQUIREMENTS LABOR MATERIAL
Permit Cost-notice of commencement,building permit,NOC termination and IKB time-pricing varies and can
1 not be determined until after all paperwork is filed TBD
Engineer Cost/Fees-Upon review of the permit application the building department may require that we submit
new plans signed off by an Engineer before they can approve the permit;the Engineer fee varies based on the
2 scope of the project TBD
3 Purchase all general rebuild material * $250.00
4 Disconnect bathroom faucet,sink,and toilet-Dispose
p ---
5 Remove existing bathroom countertop and cabinetry Dispose
6 Remove existing bathroom doors-Dispose ' {
7 Chip out bathroom dry floor '
8 Remove all above material and dispose at dump '
Inspect all exposed plumbing/electrical within the walls-Due to updated building codes,if your unit is not
updated/current to code,IKB is required to bring it up to code-These costs are to be covered by the
9 homeowner.
10 Install DensShield in bathroom
11 Mud,finish and prime all walls and ceilings
12 Install underlayment for the dry floor-approx 40 sgft @$2.25 Tile $90.00
Install dry-floor--approx.40 sgfL(includes 10%waste)
Material-IWT.•Modres Series-Perla Matte-24"x 24"@$3.50 per sgft
Layout-Straight
13 Grout Color-Mapei:Alabaster#01 Tile $140.00
14 Mud shower pan Tile $80.00
Install shower wall tile approx.90 sgfL(includes 10%waste)
-Material-IWT:Madras Series-Perla Polished-12"x 24"@$3.65 per sgft
Layout-Vertical stacked
15 Grout-Mapei:Alabaster#01 Tile $329.00
Install shower floor tle approx.20 sglk(includes 10%waste)
Material-IWT.•Madras Series-Perla 3"x 3"Mosaic
-Layout-Straight
16 -Grout-Mapei:Alabaster#01 Tile $300.00
Install decorative tile
-Material-Akua.Kappa Series-Emperador-CAY-KAEM
17 -Layout-Waterfall Tile $240.00
Install bullnose
18 -Material-Schluter-Chrome to match the plumbing fixtures Tile $150.00
Install baseboard approx.llLft
19 -Material-Will be fabricated out of the floor tile Tile $88.00
Install niche
20 -Location-Centered on right wall Tile $80.00
21 Install master threshold-Travertine Tile $80.00
22 Install shower pan with slope kit Plum $80.00
Initials - Island Kitchen and Bath Pg. 1
Install shower valve
-Material-Moen Posi-Temp valve-2520
23 -Location-Right wall Plum $170.00
Install shower valve trim
24 -Material-Moen Voss Posi-Temp valve trim in Chrome-T2691 Plum $215.00
Install handshower w/slidebar
-Material-Moen single function handshower w/slidebar in Chrome-386BEP-requires a drop elbow-A725
25 -Location-Left side Plum $310.00
Install bathroom toilet
-Material-Kohler Highline Comfort Height Elongated Bowl in White-K-3658-00-with coordinating soft-close
26 lid-K4636-0 Plum $350.00
Install four(4)LED recessed lights-two(2)above the vanity and toilet and two(2)in the shower-@$125
27 each-Natural White Elect $500.00
Install medicine cabinet
28 -Material-SBO supplied by the homeowner * SBO
Install vanity mirror
29 Material-SBO supplied by the homeowner * SBO
Frameless shower door
30 -Material-One(1)swing door-One(1)fixed panel with Chrome hardware to match the plumbing fixtures $1,450.00
31
32 IKB Labor(*) $2,500.00
Tile labor(Tile)
33 -Dry Floor:$180-Shower Walls:$1950 $2,100.00
34 Plumbing labor allowance(Plum) $1,850.00
35 Electrical labor allowance(Elect) $250.00
Painter(labor&material)-
-Ceilings and trim-Ceilings:Flat White-Trim:Semi-gloss white
36 -Walls-Cozy Cottage(Same as the master bath) $350.00
37 Construction Clean Up $200.00
TOTAL LABOR/MATERIAL ALLOWANCE $7,250.00 $4,902.00
GRAND PROJECT ALLOWANCE $12,152.00
Deposits:$4,050
Draw#1 due once rough inspections are completed:$4,050
Draw#2 due once tile is completed: $2,030
Draw#3 due once counter is templated: $1,330
Final Payment due upon completion: Remaining balance
Commencement:
Completion:
PAYMENT TERMS AND CONDITIONS
1.)Deposit of cabinetry paid in full plus 25%of the project.A deposit check,payable to Island Kitchen and Bath,is required for a project to be scheduled.
Credit Cards are NOT accepted.Deposit checks will not be cashed until the project is about to commence.
2.)Draws will be collected as needed to complete the project.If the client refuses to pay a draw,the project will be halted until payment is collected.
3.)Full payment of open balance within 3 days of completion of the project.
TERMS AND CONDITIONS
--The prices represented are based on project and product average costs.Prices may vary once project and product measurements,details,and selections
are made by client.
ISLAND KITCHEN AND BATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good standing.
Time spent by the owners on the project is not a billable item.All work will be accordance with the scope of work detailed within the contract.
Due to unforeseeable conditions inside walls,behind cabinets,etc..,additional cost may occur during construction for issues such as mold,and existing
plumbing/electrical not being safe or code compliant.These additional costs are NOT included in any contract pricing and will be dealt with as needed.
This contract does NOT account for product defects or product backorder.These issues may affect the project timeline and will be dealt with as needed.
Initials- Island Kitchen and Bath pg. 2
Any changes requested by the client,after the original contract is signed,will result in a change order.Change orders will affect the project timeline and
are an additional cost to the original contract pricing.A change order will result in a separate fee of$100 per change order,in addition to the total cost of
the Change Order.Change Orders must be signed,and paid immediately and separately from the original contract pricing.
All selections must be made at the time of the contract,unless otherwise stated,such as,To Be Decided(TBD)or Supplied by Owner(SBO).If there is not
a selection stated,TBD,or SBO then we cannot promise the price written within the contract.
It is the client's responsibility to provide all additional information that may be needed for the project.Such as,appliance specifications,all SBO material,
etc..If any incorrect information is provided by the client,Island Kitchen and Bath is NOT responsible for any additional cost or time that may occur from
this error.
Insurance Agent:4 Corners Insurance-Stuart---License Holder:Justin Thiery----License Number:CBC 1259508
THANK YOU FOR YOUR BUSINESS!
Client Signature 5IKBSignatur
Date 2q ?/ Date
Initials- Island Kitchen and Bath pg. 3