Loading...
HomeMy WebLinkAboutBlower DoorPlanning & Development Seryices Building & Code Regulation Division 2300 Virginia Ave, ftm 201 Fort Pierce, FL:l49EZ Phone: 772462-2165 Faxt 772462-6443 BLOWER DOOR TEST FOBM House lnfiltration Test Certification Prescriptive and Performance Method Permit fi:)oo>-o 4 7 Construction-Complete ( ) Existing-AfterAddition be tested and verified as having an air leakage rate of not exceedin g/air changes per air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a inches w. g. (5O Pascals). Testing shall be conducted by either individuals as defined in Statutes or individuals licensed as set forth in Section 489.1.05 {3Xf), (g} or {i} or an report of the results of the test shall be signed by the party conducting the test and shall be performed at any time after creation of all penetrations of the buildinq a dwelling unit is less than 3 air changes per hour when tested with a blower door at a ln accordance with Section R4O2.4.L.2 of the Flaridq Euilding Code, Energy Canservation with whole-house mechanical ventilation in accordance with Section M1507.3. House lnfiltration results demonstrate compliance with FBC Energy conservation Section R4O2.4.1, -Z Climate Zone 2. House lnfiltration Test AcH (s0) = CFM lsol x 60 / Passing results must be & CFM {50} = Volume = Mechsnical Ventilatlon required less than 3 ACH {XPass { }Fail .ds{ (5O) or less SLC Climate Zane2 Test Date: FBC, Energy The building or dwelling unit hour in Climate Zone 1, 2 and blower door at a pressure of Section 553.993{5) or (71, approved third pafi. A provided to the code official. thermol envelope. FBC, Residential Where the air infiltration rate pressure of 0.2 inch w. c. (5O the dwelling unit shall be I hereby certifythat the requirements in accordance LicenselCertification #: lFt Signature: Printed Name: Contractor: Date: Testing Cornpanv Job Address: Construction: I Le,atz ?l-a.,= CompanyName: Address: tO7(. .<W- ?+yr t' :{ FSL Q--^P"f L^ r^,; P- lto-- L ;o