Loading...
HomeMy WebLinkAboutTermite Treatment T Planning &Development Services Building &Code Regulation Division p 2300 Virginia Ave Fort Pierce, FL 34982 - 772-461-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 00 . JOB ADDRESS: BUILDER/CONTRACTOR: C ,, l Bic-A Q i2LLi n& s F54- ®c-7- PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMIT&PEST CONTROL INC. PEST CONTROL LICENSE #:JB175775 We, the undersigned, hereby certify that we Lve pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: o� / Chemicals used: DOMINION 2L Percentage of solution: .05% Total-gallons used: 2 �' Date of Tre Itment: l ` ( _ Time of Treatment: C/` eatment C—l"-Treatment Re-Treat Re-Treat Driveway Pools Ist Treatment Ist Treatment Re-Treat Re-Treat Other) P ter for Final Inspection Ist Treatment /r I Re-Treat Sig ture of Exter at Date Note: There must be a completed form for each required eatment or re-tre meet and this form must be on the job site to be picked up by the inspector at time of each fnsp ion or the sched led inspection will fail and a re inspection fee charged. FBC].04.2.6 I Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate sha#provide the product used,identity of the applicator, time and date of the treatment,site location,area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment ff the soil chemical barrier�ethod for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final in, for CO,a Permanent Sticker to be placed on the electri I panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 '