HomeMy WebLinkAboutEngineer Report •R 601 N.Congress Avenue ' �CF Unit 106A OC'j CO Delray Beach,FL 33445 A 0� T:561-265-6864 st�jn 1QJ9 www.pennoni.com <UCPOPpd THRESHOLD FIELD REPORT SITE VISIT #05 Project: Courtyard Marriott Balcony Repairs McCarthy Project No. 0CEND18006 Martin County Permit No. SLC-1811-0247 5th Floor Balconies Location: 10978 S. Ocean Blvd. Jensen Beach, FL Date: June 13, 2019 Contractor: Miller Construction Present: Robert J Selinsky P.E., Pennoni Frank, RTI Construction Progress: Unit 506 and 508 Balcony edges excavated with reinforcing in place Comments: Arrived on site, as requested by the contractor to observe the following: 1. Unit 506 and 508 balcony excavation complete. The east, north, and south sides of the balcony have been excavated to expose the ends of two layers of approx. % inch diameter welded wire fabric reinforcing. 2. Supplemental reinforcing has been added at 24" o/c per plan with (2) #5 continuous edge bars 3. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing. 4. Observed work is acceptable. See plan for placement of zinc anodes. 4�'� ��/ 5. OK to pour concrete per plan and specifications after anode installation. ����\0���c'NS S���i 6. Consolidate plastic concrete at time of placement by mechanical means. _ * ' d4952 * = CC: Richard Rohde— North South Const By: �/SS/ONAI I G��\ ( richard.rohde@oplhotels.com) Robert J. Selinsky P.E., 5.1. #11 lI I�t1