THRESHOLD FIELD REPORT SITE VISIT #05
Project: Courtyard Marriott Balcony Repairs
McCarthy Project No. 0CEND18006
Martin County Permit No. SLC-1811-0247 5th Floor Balconies
Location: 10978 S. Ocean Blvd.
Jensen Beach, FL
Date: June 13, 2019
Contractor: Miller Construction
Present: Robert J Selinsky P.E., Pennoni
Frank, RTI Construction
Progress: Unit 506 and 508 Balcony edges excavated with reinforcing in place
Comments:
Arrived on site, as requested by the contractor to observe the following:
1. Unit 506 and 508 balcony excavation complete. The east, north, and south sides of the
balcony have been excavated to expose the ends of two layers of approx. % inch diameter
welded wire fabric reinforcing.
2. Supplemental reinforcing has been added at 24" o/c per plan with (2) #5 continuous edge
bars
3. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing.
4. Observed work is acceptable. See plan for placement of zinc anodes.
4�'�
��/
5. OK to pour concrete per plan and specifications after anode installation. ����\0���c'NS S���i
6. Consolidate plastic concrete at time of placement by mechanical means. _ * ' d4952 * =
CC: Richard Rohde— North South Const By: �/SS/ONAI I G��\
( richard.rohde@oplhotels.com) Robert J. Selinsky P.E., 5.1. #11 lI I�t1