HomeMy WebLinkAboutRevision Leonardo, Fred - Wind Loads (2021-02-07) eSEAL Component & Cladding Wind Loads
Prepared for White Aluminum Calculations by Seaside Engineers
Project: Fred Leonardo Residence Certificate of Authorization No.32048
Location: 9650 S Ocean Dr,Unit 1910 4265 60th Court
Jensen Beach,FL 34957 Vero Beach,Florida 32967
Project ID: (722)202-8008 info@seasideengineers.com
Date: 2/7/2021 www.seasideengineers.com
Design Information
Risk Category II
Windspeed 170 mph
Exposure D
Int.Press.Coef.,GCpi(+/-) 0.18
a 7.00 feet
Select the appropriate fastener size and spacing using the pre-engineered attachment schedule for the Florida Approved Product(s)or NOA used on this job.The
contractor is responsible to ensure the use of the proper material,reinforcement,components,etc.to meet the indicated pressure per the product approval
engineering document.The contractor is responsible to verify the component is in the appropriate zone using the"a"dimension shown above and diagrams
shown below.The building pressures are calculated using the Allowable Stress Design.Contact Seaside Engineers immediately if the substrate at the attachment
locations appears to have deterioration,abnormalities,damage,or other conditions resulting in questionable integrity.
Florida
Product
Area Approval# Building Design Product Design
ID Opening Description (sqft) Zone or NOA Manufacturer Model Pressure(PSF) Pressure(PSF)
1.0 Shutter 406.7 5 FL389.2 ASSA Bertha HV Blade Accordi 48.4 -75.1 120.0 -100.0
2.0 Shutter 119.0 5 FL389.2 ASSA Bertha HV Blade Accordi 55.3 -93.7 120.0 -100.0
3.0 IShutter 1 95.0 1 5 1 FL389.2 JASSA I Bertha HV Blade Accordil 56.6 1 -97.1 120.0 -100.0
This item has been elec-
bnmwall`i-signed and y�* .K +F:
sealed by Edward RDske ,•4ti{,Eks�+; {+
PE using a Digitak Ana- No.72228
tore.Printed copies of
this document are not *• * *p
considered signed and . STATIE OF
sealed and the signature {,c+�4R10 •;
must be verified on any �'i�'41' ...... '••
electronic copies /G
_ +�r�rr�.r-S
tvD I I I ',, �f
3 1 3 3 L?_L3 31 1 3 a�(tvD �1�� RD .Z.''I
2 2 I I I ••
2 2�-1
E� •5 �eke
ROOF: I �I I I I I • •
2i 1O 12 2` 1O i2 2 i 1Oi 2 2 i 1Oi 2 * 28.O .i/ 7
I I
• � �
I' 2 z i i s STATE OF 0
2 2 I I I ► 9
1
3 2 3 3 1 2 1 3 3 1 2 1 3 .,�"�••: ,• ( ate•• t
I • f • 2
......................................
........................................................
•
�'''%SS�aNa E�,•�`'�
WALL: h Edward K ROD, E O
9
February 7,2021
�
y IO
I