Loading...
HomeMy WebLinkAboutRevision Leonardo, Fred - Wind Loads (2021-02-07) eSEAL Component & Cladding Wind Loads Prepared for White Aluminum Calculations by Seaside Engineers Project: Fred Leonardo Residence Certificate of Authorization No.32048 Location: 9650 S Ocean Dr,Unit 1910 4265 60th Court Jensen Beach,FL 34957 Vero Beach,Florida 32967 Project ID: (722)202-8008 info@seasideengineers.com Date: 2/7/2021 www.seasideengineers.com Design Information Risk Category II Windspeed 170 mph Exposure D Int.Press.Coef.,GCpi(+/-) 0.18 a 7.00 feet Select the appropriate fastener size and spacing using the pre-engineered attachment schedule for the Florida Approved Product(s)or NOA used on this job.The contractor is responsible to ensure the use of the proper material,reinforcement,components,etc.to meet the indicated pressure per the product approval engineering document.The contractor is responsible to verify the component is in the appropriate zone using the"a"dimension shown above and diagrams shown below.The building pressures are calculated using the Allowable Stress Design.Contact Seaside Engineers immediately if the substrate at the attachment locations appears to have deterioration,abnormalities,damage,or other conditions resulting in questionable integrity. Florida Product Area Approval# Building Design Product Design ID Opening Description (sqft) Zone or NOA Manufacturer Model Pressure(PSF) Pressure(PSF) 1.0 Shutter 406.7 5 FL389.2 ASSA Bertha HV Blade Accordi 48.4 -75.1 120.0 -100.0 2.0 Shutter 119.0 5 FL389.2 ASSA Bertha HV Blade Accordi 55.3 -93.7 120.0 -100.0 3.0 IShutter 1 95.0 1 5 1 FL389.2 JASSA I Bertha HV Blade Accordil 56.6 1 -97.1 120.0 -100.0 This item has been elec- bnmwall`i-signed and y�* .K +F: sealed by Edward RDske ,•4ti{,Eks�+; {+ PE using a Digitak Ana- No.72228 tore.Printed copies of this document are not *• * *p considered signed and . STATIE OF sealed and the signature {,c+�4R10 •; must be verified on any �'i�'41' ...... '•• electronic copies /G _ +�r�rr�.r-S tvD I I I ',, �f 3 1 3 3 L?_L3 31 1 3 a�(tvD �1�� RD .Z.''I 2 2 I I I •• 2 2�-1 E� •5 �eke ROOF: I �I I I I I • • 2i 1O 12 2` 1O i2 2 i 1Oi 2 2 i 1Oi 2 * 28.O .i/ 7 I I • � � I' 2 z i i s STATE OF 0 2 2 I I I ► 9 1 3 2 3 3 1 2 1 3 3 1 2 1 3 .,�"�••: ,• ( ate•• t I • f • 2 ...................................... ........................................................ • �'''%SS�aNa E�,•�`'� WALL: h Edward K ROD, E O 9 February 7,2021 � y IO I