HomeMy WebLinkAboutTermite Treatment (2) From fax5616880909 1.161.688.0909 Wed Feb 10 07:48:14 2021 MST Page 1 of 1
2/9/2021 County PCL Form
G' St Lucie County Inspections
t .c 2300 Virginia Avenue
Ft Pierce, FL 34982
..:,! � (722) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT# ? JOB ADDRESS 9631 Knollwood Ln,Fort Pierce,FL 34951-2918
BUILDER GHO Home
PEST CONTROL CONTRACTOR HomeTearn Pest Defense,Inc.
PEST CONTROL LICENSE# JF0001886
We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 260 Chemicals used: Sentricon Always Active HD
bait
Percentage of solution: .50% Total gallons used:.
Date of treatment: 02/08i21 Time of treatment: AM
FBC104 2.6 Certificate of Protective Treahnentforprevention oftermites.
A weather resistant jobsite posting board shall be provided to receive
®Footing duplicate Treatment Certificates as each required protective treatment is
® 1 st Treatment completed,providing a copy for the person the poermit is issued to and
another copy for the building permit files. The Treatment Certficatc shall
❑Re-treat provide the product used,identity of the applicator; time and date of the
❑ Slab treatment,site location,area treated,chemical used,percent concentration
and number ofgallons used, to establish a verzf able record ofprolective
❑ I st Treatment treatment. If the soil chemical barrier method for termite prevention is used,
❑Re-treat final arterior treatment shall be completed prior to final building approval.
❑Driveway St Lucie County requires for the final inspection for CO,a Permanent
❑ 1st Treatment Sticker to be placed on the electrical panel box cover,listing all the
❑Re-treat treatments and dates of applications.
❑ Pools
❑ 1st Treatments-�—
❑Re-treat Signature of exterminator
❑Other
❑ 1st Treaftnent
❑Re-treat
®Perimeter for Final Inspection
NOTE.-There must be a completed form for each required treatment or re-treatment and this form inust be on the job site
to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection
fee charged.
https:llapp.hometeam.pestpac.com/forms/countypcl_print_plain.asp?FonnlD=1752864&preprint=O&pdf= 1/1