Loading...
HomeMy WebLinkAboutTermite Treatment (2) From fax5616880909 1.161.688.0909 Wed Feb 10 07:48:14 2021 MST Page 1 of 1 2/9/2021 County PCL Form G' St Lucie County Inspections t .c 2300 Virginia Avenue Ft Pierce, FL 34982 ..:,! � (722) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# ? JOB ADDRESS 9631 Knollwood Ln,Fort Pierce,FL 34951-2918 BUILDER GHO Home PEST CONTROL CONTRACTOR HomeTearn Pest Defense,Inc. PEST CONTROL LICENSE# JF0001886 We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 260 Chemicals used: Sentricon Always Active HD bait Percentage of solution: .50% Total gallons used:. Date of treatment: 02/08i21 Time of treatment: AM FBC104 2.6 Certificate of Protective Treahnentforprevention oftermites. A weather resistant jobsite posting board shall be provided to receive ®Footing duplicate Treatment Certificates as each required protective treatment is ® 1 st Treatment completed,providing a copy for the person the poermit is issued to and another copy for the building permit files. The Treatment Certficatc shall ❑Re-treat provide the product used,identity of the applicator; time and date of the ❑ Slab treatment,site location,area treated,chemical used,percent concentration and number ofgallons used, to establish a verzf able record ofprolective ❑ I st Treatment treatment. If the soil chemical barrier method for termite prevention is used, ❑Re-treat final arterior treatment shall be completed prior to final building approval. ❑Driveway St Lucie County requires for the final inspection for CO,a Permanent ❑ 1st Treatment Sticker to be placed on the electrical panel box cover,listing all the ❑Re-treat treatments and dates of applications. ❑ Pools ❑ 1st Treatments-�— ❑Re-treat Signature of exterminator ❑Other ❑ 1st Treaftnent ❑Re-treat ®Perimeter for Final Inspection NOTE.-There must be a completed form for each required treatment or re-treatment and this form inust be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection fee charged. https:llapp.hometeam.pestpac.com/forms/countypcl_print_plain.asp?FonnlD=1752864&preprint=O&pdf= 1/1