Loading...
HomeMy WebLinkAboutScope of workScope of work for the 3 upstairs bathrooms Master bath- Existing tub to shower using Schluter system- new shower valve, install shower trim Guest bath 1- Existing tub to shower —using Schluter system- install new shower vale and shower trim Guest bath 3- existlng tub to tub , install new tub, new tub valve and tun trim NI electric to be done the some In all 3 bathrooms Install a new &I man bath exhaust fan In each bathroom In existlng location In each bathroom Install new 1M volt 20 amp circuit for new bathroom outlet In each bathroom Install new GFCI outlet and cover In each bathroom