HomeMy WebLinkAboutScope of workScope of work for the 3 upstairs bathrooms
Master bath- Existing tub to shower using Schluter system- new shower valve, install shower trim
Guest bath 1- Existing tub to shower —using Schluter system- install new shower vale and shower
trim
Guest bath 3- existlng tub to tub , install new tub, new tub valve and tun trim
NI electric to be done the some In all 3 bathrooms
Install a new &I man bath exhaust fan In each bathroom In existlng location In each bathroom
Install new 1M volt 20 amp circuit for new bathroom outlet In each bathroom
Install new GFCI outlet and cover In each bathroom