HomeMy WebLinkAboutPile Installation Inspectionr�t �
a. Tip CP IL f
KELLER, SCHLEICHER & MacWILLIAM ENGINEERINMG-�AN-D- TE-S-I ING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
March 22, 2016
Brevard Grouting
David Ricks
1620 Tangerine Street
Melbourne, FL. 32901
Re: Pile Installation Inspection
Montes Residence
4920 Watersong Way
St. Lucie, Florida
KSM Project #: 160699-pile
Dear Mr. Ricks:
As requested, we were present during the installation of the fifty six (56) auger -
cast -piles for the proposed structure at the referenced site. Pile layout by others.
The pile installation inspection was generally performed in accordance to the
"Inspector Guide to the Auger Cast -In -Place Piles", published by the Auger Cast -
In -Place Pile Committee of The Deep Foundation Institute.
Based on this inspection, it is our professional opinion, that the piles constructed
for the referenced project were installed as specified on the construction
drawings. The pile documentation and Location Plan are attached.
•�'eaal e�i to be of assistance to you on this phase of your project. If you
;=_t Inns, please feel free to contact the office.
Respectful ;
e2e4®r0�
JEK:! J1 w
E-mail. to: - david@brevardgrouting.com
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
Z%GoD AW
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693Pile Installation Inspection FAX (772) 589-6469
Montes Residence
4920 Watersong Way
St. Lucie County, Florida
KSM Project #: 160699-pile1 Date Installed: March 15th & 16th. 2016
Pile Location
(see Location
Plan)
Pile
Diameter
Pile
Length
Pile
Reinforcement
Pump
Strokes
Truck No.
Time
Installed
Tuesday March 15, 2016
1
14"
25'
5 #5 Bars x 15' w/
#3 Hoops at 10"
O.C. w/ #7 cent.
Bar cont.
39
156
2:15
2
tt
t�
t�
�F _
2:35
3
35
156
2:48
4
99
If36
156 -
3:08
5
It
If39
156
3:18
6
If
1935
156/166
3:30
7
36
166
3:42
8
If
If38
166
3:52
9
cc
1148
166
4:13
10
Ittt
41
166
4:24
11
99t`
36
166
4:38
12
99It
37
166/152
4:49
13
99It
40
152
4:59
14
At
19If
36
152
5:11
15
19
IfIt
34
152
5:30
16
tt
41
152
5:50
17
39
152
6:06
Wednesday March 16,2016
18
14"
25'
34
407
9:00
19
It
It36
407
9:11
u _ _
_
._- �-
407
9:2.3
21
If
35
407
9:45
22
it
35
'407
9:55
23
Itis
36
407/183
10:05
24
9939
183
10:17
25
"
36
183
10:28
26
If
36
183
10:37
27
Itit
At
35
183
10:46
28
33
183
10:56
29
A,
If36
150
11:08
30
If36
150
11:16
31
99
ItIt
37
150
11:29
Page 1 of 2
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366
A% 54 AVI
KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC.
MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712
PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093
C.A.: 5693 FAX (772) 589-6469
Pile Installation Inspection
Montes Residence
4920 Watersong Way
St. Lucie County, Florida
KSM Project #: 160699-pilel Date Installed: March 15th & lath_ 2019
Pile Location
(See
Location
Plan)
Pile
Diameter
Pile
Length
Pile
Reinforcement
Pump
Strokes
Truck No.
----
Time
Installed
32
14"
25'
5 #5 Bars x 15' w/
#3 Hoops at 10"
O.C. w/ #7 cent_.
Bar cont
35
150
11:39
33
9136
150
11:49
34
It
34
150
12:02
35
1937
1501176
12:16
36
Is40
176
12:28
37
9131
176
12:41
38
Is
Is34
176
12:54
39
Is
it34
176
1:03
40
36
176
1:13
41
41
176
1:25
42
38
183
2:20
43
27
183
2:32
44
is
99
Is
32
183
2:43
45
is
It
11
34
183
2:57
46
99
Is
It35
183
3:12
47
91
If
1434
183
3:21
48
Is
is
Is
35
183/171
3:31
49
cc
it
is37
171
3:43
50
Is
-.
it
cc
36
171
3:53
51---,- _
«. .. _
_ _ «--
- -
-- - -3&-
171
- 4:07
52
Is
It
36
171
4:17
53
99
"
"
31
171
4:27
54
" -R
91
36
171 /180
4:38
55 1
99 1
It 1
99
38
171/180
4:52
5619
1
11 1
It
37
180
5:02
Page 2 of 2
Note: 1. Grout 28 Days Compressive Strength — 4,000 psi
2. 1 Pump Stroke = 1.07 cu. ft of Grout
Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366