Loading...
HomeMy WebLinkAboutPile Installation Inspectionr�t � a. Tip CP IL f KELLER, SCHLEICHER & MacWILLIAM ENGINEERINMG-�AN-D- TE-S-I ING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 March 22, 2016 Brevard Grouting David Ricks 1620 Tangerine Street Melbourne, FL. 32901 Re: Pile Installation Inspection Montes Residence 4920 Watersong Way St. Lucie, Florida KSM Project #: 160699-pile Dear Mr. Ricks: As requested, we were present during the installation of the fifty six (56) auger - cast -piles for the proposed structure at the referenced site. Pile layout by others. The pile installation inspection was generally performed in accordance to the "Inspector Guide to the Auger Cast -In -Place Piles", published by the Auger Cast - In -Place Pile Committee of The Deep Foundation Institute. Based on this inspection, it is our professional opinion, that the piles constructed for the referenced project were installed as specified on the construction drawings. The pile documentation and Location Plan are attached. •�'eaal e�i to be of assistance to you on this phase of your project. If you ;=_t Inns, please feel free to contact the office. Respectful ; e2e4®r0� JEK:! J1 w E-mail. to: - david@brevardgrouting.com Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 Z%GoD AW KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693Pile Installation Inspection FAX (772) 589-6469 Montes Residence 4920 Watersong Way St. Lucie County, Florida KSM Project #: 160699-pile1 Date Installed: March 15th & 16th. 2016 Pile Location (see Location Plan) Pile Diameter Pile Length Pile Reinforcement Pump Strokes Truck No. Time Installed Tuesday March 15, 2016 1 14" 25' 5 #5 Bars x 15' w/ #3 Hoops at 10" O.C. w/ #7 cent. Bar cont. 39 156 2:15 2 tt t� t� �F _ 2:35 3 35 156 2:48 4 99 If36 156 - 3:08 5 It If39 156 3:18 6 If 1935 156/166 3:30 7 36 166 3:42 8 If If38 166 3:52 9 cc 1148 166 4:13 10 Ittt 41 166 4:24 11 99t` 36 166 4:38 12 99It 37 166/152 4:49 13 99It 40 152 4:59 14 At 19If 36 152 5:11 15 19 IfIt 34 152 5:30 16 tt 41 152 5:50 17 39 152 6:06 Wednesday March 16,2016 18 14" 25' 34 407 9:00 19 It It36 407 9:11 u _ _ _ ._- �- 407 9:2.3 21 If 35 407 9:45 22 it 35 '407 9:55 23 Itis 36 407/183 10:05 24 9939 183 10:17 25 " 36 183 10:28 26 If 36 183 10:37 27 Itit At 35 183 10:46 28 33 183 10:56 29 A, If36 150 11:08 30 If36 150 11:16 31 99 ItIt 37 150 11:29 Page 1 of 2 Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 A% 54 AVI KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Pile Installation Inspection Montes Residence 4920 Watersong Way St. Lucie County, Florida KSM Project #: 160699-pilel Date Installed: March 15th & lath_ 2019 Pile Location (See Location Plan) Pile Diameter Pile Length Pile Reinforcement Pump Strokes Truck No. ---- Time Installed 32 14" 25' 5 #5 Bars x 15' w/ #3 Hoops at 10" O.C. w/ #7 cent_. Bar cont 35 150 11:39 33 9136 150 11:49 34 It 34 150 12:02 35 1937 1501176 12:16 36 Is40 176 12:28 37 9131 176 12:41 38 Is Is34 176 12:54 39 Is it34 176 1:03 40 36 176 1:13 41 41 176 1:25 42 38 183 2:20 43 27 183 2:32 44 is 99 Is 32 183 2:43 45 is It 11 34 183 2:57 46 99 Is It35 183 3:12 47 91 If 1434 183 3:21 48 Is is Is 35 183/171 3:31 49 cc it is37 171 3:43 50 Is -. it cc 36 171 3:53 51---,- _ «. .. _ _ _ «-- - - -- - -3&- 171 - 4:07 52 Is It 36 171 4:17 53 99 " " 31 171 4:27 54 " -R 91 36 171 /180 4:38 55 1 99 1 It 1 99 38 171/180 4:52 5619 1 11 1 It 37 180 5:02 Page 2 of 2 Note: 1. Grout 28 Days Compressive Strength — 4,000 psi 2. 1 Pump Stroke = 1.07 cu. ft of Grout Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366