Loading...
HomeMy WebLinkAboutCompaction TestUES Project No: Workorder No: Report Date: 3360.1800067.0000 224324-1 02/09/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client:D.R. HORTON, INC. EAST FLORIDA DIVISION UES Technician:Sean Hayes 1430 Culver Drive, NE Palm Bay, FL 32907 Date Tested:02/05/2021 Project:CMT CREEKSIDE Various Locations,Vero Beach, County, FL 32967 Type of Test: Area Tested:3330 Trinity Circle, Lot #41 Field:ASTM D-6938 Nuclear Gauge Method Material:Native Laboratory:ASTM D1557 Modified Proctor Reference Datum:0 = Top of Native The tests below meet the 95% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Pass or Fail 1 SW Corner 0-1 ft 118.6 10.8 115.1 11.3 97 Pass 2 NE Corner 0-1 ft 118.6 10.8 116.2 10.9 98 Pass 3 Center 0-1 ft 118.6 10.8 114.7 10.1 97 Pass Remarks:Permit: #2011-0168 Reviewed By GFA International, Inc Certificate of Authorization No. 4930 John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No. 63218 To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1