HomeMy WebLinkAboutBlower Door Test....:,:ti-..
Plannhig Develepr;enz �enriees
Building ` Code RegLsiatiflr: �ivisien
2-300 VIV9in;a Ave, p r., 213,
Foe'c Pierce, FL S4902
't�'horle: 772-4G2_-22.65 Tana 772-462-6443
4ar��5e �€�'il�a�'c0E0CiU �r�5t C�,r�C�Sa'lC�cl`i�%?[�;
Date, I o
C6aklrc�C�!': Cefa�`�dc'� �J_ U
�9
i -0. b A d el re 35. 3 ; -r H�_c �;_ __1 �11_ L �J.') ---I.
It/GNew cans-ruczj 4n ry rn P R-e �L:.e 3tt
. _.'"•••• .:1LI ClLIUFI : eSt laesults
UM (Sol]_ ) 5Lu �iiiila;_ Zcne 2 /
i/olurne ; �( 1 es� mace: Z f 11 ! Z
- (50) = CF-M (50) 7t 60 / Volu;-a r
= f r
Passing resul---s Pitts' be ca".. Ai ri �� Mlle r�rljC J �Pi�%ilGjoi7 r2nj'i;'eci i ss rC� ? Al
Or ie_n
�21ss ) .
( .all
-SC;
'sire building ordweffing unit shall b�` - c Lested and !,eriried as having all airleakage rate Of nOt exceeding 7 air changes oer,
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate %ones 3 through S. Testing shall be conducted Vdjii e
blower door at a pressure o; 0.2 inches �Ar. g. (S0 ?=_scats). 1 estin^shall be conducted by eft
Section 553.993(5) or (7), Florida Statutes or indiaidua her individual_ as defined ir,
approved third art`. Is licensed asset ;or �h in Section ?$a,1 �j (;}(;}, (g) o,- (i) or are
P A written report of the results of the Lest shall be signed by the Party conducting the Lest and
provided to the code official. Testing shall be penormed at any time a; er creation of all penetrations o the building
thermal enveiope.
1f0here the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tasted with a blower door at a
pressure of 0.2 inch w. c. (50 pa) in accordance with Section P,402.4.1.2 of the Florida Buildii7g Code, Energy Conservarion
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section IM1507.3.
?e5`ci:1>; CorniaaiJv
Company Name: PI-O-DUCI SenIICCS
(address: '1910- P"io ?Vista !Drive.; i. Pierce, FL 34,94.0
I hereby certify that the above House Infiltration results demonstrate comp
requirements in accordance with 5ect�n R402.%�.1 2 IlanCc with FBC _her gy Conservation
� Climate _one 2.
Signature:
Printed Name: Marlin l<I�in
License/Certification 506*1633
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
" rj;. -i Fort Pierce, FL 34982
772462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
j Prescriptive and Performance Method
Date: _ u 1 1 Lt Permit #: ] _ V J i ay 6 * 2- Lot #:
Contractor: Y' i 4% J_ Address: '+ S 3 sLt d,, e, p� f �� rrYr(.sA- Y" Y JQ
Construction: -Post Construction Test n Rough -in Test
Test Conditions:
Date: 11 Floor Area (ft2): 03
Time: `•.70 Primary Location of Supply Ductwork
Indoor Temperature (F): 4 Primary Location of Return Ductwork
Outdoor Temperature (F): 3
Total Leakage Test (Outside)
Duct Leakage: Default ❑ Prop. Leak Free ❑ Proposed On =
Test Pressure: 2 i (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ,krFass ❑ Fail
Installed Pa
IL
Total Leakage (cfm):
Total Leakaga per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFMI100 sqft.
Testing Company
Company Name: Pro -Duct Services
Address:
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5t' Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.^�x/
Signature: {,t
Printed Name: Name: Martin Klein
License/Certificate #: 5061633