Florida Power&Light Company
� F
FPL
February 16 2021
i
i
Evans Residence
109 NE Charleston Oaks Dr
Port St Lucie FL 34983
Re: 109 NE Charleston Oaks Dr
Dear Evans:
Thank you for contacting FPL early in your planning process. At the present time FPL has sufficient capacity
to provide electric service to your property. We have overhead and underground facilities currently available
at this location.
Please advise me early in the planning process once the final plans have been approved. This information
will help us to provide you with the best service in accordance with applicable rates, rules and regulations.
You may also respond to us through www.fpl.com. Please contact me if you have any questions.
i
I
Sincerely,
April Parker
Associate Engineer
i
I
A NEXTera ENERGY Company
I
I
CITY OF PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT
NEW RESIDENTIAL SERVICE APPLICATION
NEW CONSTRUCTION 0837832 -832068
Customer-Account
WATER Capacity:(One ERC): $ 1,423.00
Account Name: HOMECRETE HOMES INC NON SAD/USA Line Fee: $
Service Address: 109 NE CHARLESTON OAKS DRIVE SAD/USA%"Meter Fee: $ 640.00
NON SAD/USA%"Meter Fee: $
City: PORT ST LUCIE State: FL Zip'. 34983 TOTAL WATER: $ 2,063.00
Mailing Address: 2162 NW RESERVE PARK TRACE PORT ST LUCIE FL 34986- SEWER Capacity:(One ERC): $2,177.00
3223 NON SAD/USA Line Fee: $
Grinder Installation: $3,120.00
Primary Phone#: (772)370-1202 Secondary Phone#: (772)873-6707 LPS Installation Fee: $
I.D.#
**** 4601 Septic Service: $
Gravity Sewer:
TOTAL SEWER: $5,297.00
Security Deposit Water: $50.00
Security Deposit Sewer: $90.00
Legal Description: LOT 4 PHASE TWO CHARLESTON OAKS Recording Fee: $
Cvc1e: 02 Book: 500 LESS DEPOSIT&RECORDING $
Zone: NON TOTAL AMOUNT DUE: $7,500.00
Cash E iCreditCard Check#
Plant: GP r _
RECEIPT#: DATE PAID: 02/16/2021 BY: MBYRD
UTILITY will provide water and/or sewer service upon payment of the applicable connection charges and compliance with the Terms and Conditions listed on the back of this Service Application.The Utility policies provide for a water
and/or wastewater plant capacity allocation of two hundred and fifty(250)gallons per day equivalent residential connection(ERC).The Utility will not be obligated to provide capacity of service in excess of the allocation and may
require consumer to curtail use which exceeds such allocated capacity.I have read and acknowledge receipt of this Service Agreement by signature below.
,C
Customer Signature Date--- -------
cr
y 6%t
CITY OF PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT
GRIN®ER SYSTEM APPLICATION
ACCT# 832068 COST# 0837832 FILE # LOT 4 BLOCK SEC 48
STiREET ADDRESS 109 NE CHARLESTON OAKS DRIVE X-STREET
BUILDER'S NAME HOMECRETE HOMES INC PHONE (772) 370-1202
i
CONDITIONS -
Applicant understands the following instructions and responsibility before the grinder system
installation. All scheduled installations are subject to change due to weather and other Utility
emergencies. For additional questions and/or clarification, please email us at
utilitysewer@cityofpsl.com.
1'. Instructed as to location of: Sewer Main: Front between lots
j The sewer lateral must be stubbed out in the front corner, opposite
i .
of the garage, no more than five feet from the corner of the home
iWater Service: Front between lots
2. Lot must be clear of all construction debris, lot rough graded and house stucco completed. Final
grade and sod cannot be done until tank set is completed.
3. If sewer stub-out is on the same side as the water meter, a 3" PVC sleeve 20' back from garage
door is required 18" under driveway to install the Utility's 11/2" service line.
4. The power must be supplied to the home's main panel. The power supply for the control panel,
i from the house service, must be a double-pole 20-amp breaker with four (4) #12 conductors,
i which will Include ground wire. The wire shall be 18" above finished floor and located on the side
of the home within five feet of the front corner (same corner as sewer lateral). Height of panel
shall be a minimum of 31/2 feet or 42 inches and a maximum of 41/2 feet or 54 inches.
5. Accepts responsibility to email City of Port St. Lucie Utility Systems Department at
utilitysewer@cityofpsi.com when the pre-inspection items are ready. If inspection fails, there will
be a $25.00 fee for re-inspect. Contractor is required to call back for 2"d Pre-Inspection when the
deficiency has been resolved.
6. Acknowledges the responsibility to correct all deficiencies at applicant's expense and eliminate
any conflicts in the way of Utility tank lines.
7. Acknowledges responsibility for inspection fee of $25.00 for each follow-up pre-inspection visit
required to satisfy non-compliance items.
i
i
Builder/Owner Date
Utility Systems Department Representative MARIA B Date 02/16/21