Loading...
HomeMy WebLinkAboutBischoff - Wind Loads eSEALProject: Location: Project ID: Date:  Design Information Risk Category II Windspeed 170 mph Exposure D Int. Press. Coef., GCpi(+/‐)0.18 a 13.00 feet ID Area  (sqft) Zone Florida  Product  Approval #  or NOA Manufacturer Model 1.0 94.2 5 20‐0429.07 PGT SGD670 56.0 ‐95.5 90.0 ‐140.0 2.0 94.2 5 20‐0429.07 PGT SGD670 56.0 ‐95.5 90.0 ‐140.0 3.0 103.3 5 20‐0401.09 PGT PW7620A 55.5 ‐94.1 100.0 ‐145.8 4.0 55.7 5 20‐0429.07 PGT SGD670 59.0 ‐103.3 90.0 ‐140.0 5.0 33.3 5 20‐0429.07 PGT SGD670 61.8 ‐111.0 90.0 ‐140.0 6.0 87.5 5 20‐0429.07 PGT SGD670 56.4 ‐96.6 90.0 ‐140.0 3a 1.3 5 20‐0406.03 PGT 2x4x0.25 64.7 ‐118.6 170.0 ‐170.0 ROOF: WALL:Edward K Roske, PE Bischoff Residence Certificate of Authorization No. 32048 Component & Cladding Wind Loads Prepared for White Aluminum Calculations by Seaside Engineers 8750 S Ocean Drive, PH48 4265 60th Court Jensen Beach, FL Vero Beach, Florida 32967 186714 (722) 202‐8008            info@seasideengineers.com SGD 2/7/2021 www.seasideengineers.com Select the appropriate fastener size and spacing using the pre‐engineered attachment schedule for the Florida Approved Product(s) or NOA used on this job. The  contractor is responsible to ensure the use of the proper material, reinforcement, components, etc. to meet the indicated pressure per the product approval  engineering document. The contractor is responsible to verify the component is in the appropriate zone using the "a" dimension shown above and diagrams  shown below. The building pressures are calculated using the Allowable Stress Design. Contact Seaside Engineers immediately if the substrate at the attachment  locations appears to have deterioration, abnormalities, damage, or other conditions resulting in questionable integrity. Opening Description Building Design  Pressure (PSF) Product Design  Pressure (PSF) SGD SGD PW SGD SGD Mullion February 7, 2021 4 4 5 5 5 5 a aa a  h 3 2 3 323 2 1 2 212 3 2 3 323 a (typ 3 3 3 3 1 2 2 2 1 2 2 2 2 1 2 212 2 2 2 2 a (typ