Loading...
HomeMy WebLinkAboutX Energy conservation checklist-VCC-Performance R405-2017FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 1...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential Simulated Performance method shall include: This Checklist A FORM 405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, e-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report (one page). An input summary checklist that can be used for field verification (usually 4 pages/may be greater). Energy Performance Level (EPL) Display Card (one page) HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 Mandatory Requirements (five pages) Required prior to CO for the Performance method: Air Barrier and Insulation Inspection Component Criteria checklist (Table 402.4.1.1 - one page) A completed Form 2017 Envelope Leakage Test Report (usually one page). Section R402.4 or R402.4.1.2 exceptions may apply. If FORM R405 duct leakage type indicates anything other than "default leakage", then a completed FORM R405 Duct Leakage Test Report (usually one page). FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-Energy® Florida 2017Right-Suite® Universal 2021 21.0.03 RSU27054 Page 2...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Villadelta Construction CorBuilder Name:Pereira ResidenceProject Name: Permit Office:TBD Noble Oaks LnStreet: Permit Number:Port St Lucie, FL 34952City, State, Zip: St LucieJurisdiction:Pereira ResidenceOwner: St Lucie (Florida Climate Zone 2)County:FL, St Lucie Co IntlDesign Location: 1. New construction or existing New (From Plans)Area (ft²)Insulation (R)9. Wall types (3712 ft²) 2. Single family or multiple family Single-Family 3526.954.1Blk Wall, Stucco Ext, R-4.1 Exta. 185.1813.0Frm Wall, 1/2" Gyp Bd Ext, R-13b.3. Number of units, if multiple family 1 N/Ac. 4. Number of bedrooms N/Ad.4 Area (ft²)Insulation (R)10. Ceiling types (3712 ft²)5. Is this a worst case?No 3712.380.0Attic, Metal Roof, R-20 Roof Deca. 6. Conditioned floor area above grade (ft²)3712.38 N/Ab. N/Ac.0Conditioned floor area below grade (ft²) Area (ft²)R11. Ducts7. Windows (676 ft²)Description Area (ft²)663.566.0Sup: A/H 1 Attic, Ret: A/H 1 Attic, AH: Uncond Gara. 289.936.0Sup: A/H 2 Attic, Ret: A/H 2 Attic, AH: Uncond Garb.200.00Dbl Impact, 0.640a. U-Factor: 0.21SHGC: EfficiencykBtu/hr12. Cooling systems267.50Dbl Impact, 0.400b. U-Factor: SEER: 16.047.0Split air conditionera.0.25SHGC: SEER: 14.018.0Split air conditionerb.88.08Dbl Impact, 0.790c. U-Factor: EfficiencykBtu/hr13. Heating systems0.31SHGC:AFUE: 100.036.4Electric stripa.120.00Dbl Impact, 0.810d. U-Factor:AFUE: 100.015.5Electric stripb.0.37SHGC: 14. Hot water systemsft7.223Area Weighted Average Overhang Depth: Cap: 0 galPropane instantaneous (0 gal)a.0.267Area Weighted Average SHGC: EF: 1.00 8. Floor types (3712.38 ft²)Insulation (R)Area (ft²)Conservation featuresb. (None)3712.380.0On Grade Depth, Tile Flr Fnsha. N/Ab. None15. CreditsN/Ac. 108.88Total Proposed Modified Loads:Glass/Floor area:0.182 PASS125.40Total Baseline Loads: Review of the plans and specificationsI hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code. covered by this calculation indicates compliance with the Florida Energy Code. Before construction is completed, this building will be inspected forPREPARED BY:____________________________compliance with Section 553.908 Florida Statutes.DATE:____________________________________ I hereby certify that this building, as designed, is in compliance with the Florida Energy Code. BUILDING OFFICIAL:______________________OWNER/AGENT:___________________________ DATE:__________________________________DATE:____________________________________ - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.0 ACH50 (R402.4.1.2). 02/12/2021 FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 3...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S Building Input Summary Report PROJECT Street addressAddress type:4Bedrooms:Pereira ResidenceTitle:Lot#:3Bathrooms:FLAsBuiltBuilding Type:Block/Subdivision:3712Conditioned Area:Pereira ResidenceOwner:Platbook:1Total Stories:1# of Units:TBD Noble Oaks LnStreet:NoWorst Case:Villadelta Construction CorBuilder Name:St LucieCounty:0Rotate Angle:Permit Office:Port St Lucie, FL 34952City, State, Zip:NoCross Ventilation:St LucieJurisdiction:NoWhole House Fan:Single-FamilyFamily Type:Ocean/LakeTerrain:New (From Plans)New/Existing:SuburbanShielding:Year Construct:Comment: CLIMATE Daily TempDesignHeatingInt Design TempDesign TempIECC RangeMoistureDegree DaysSummerWinter2.5 %97.5 %ZoneTMY SiteDesign Location Low57486757090412FL_Fort_PierceFL, St Lucie Co Intl BLOCKS VolumeAreaName# f t³30858.57ft²2660.63A/H 11 f t³11372.11ft²1051.75A/H 22 SPACES HeatedCooledFinishedInfil IDBedroomsOccupantsKitchenVolumeArea# YesYesYes100Noft³1383.88ft²138.25Laundry1 YesYesYes100Noft³157.66ft²15.75Storage2 YesYesYes100Noft³70.07ft²7.00Lin3 YesYesYes100Noft³633.13ft²63.25Guest Bath4 YesYesYes100Noft³748.25ft²74.75Back Hall5 YesYesYes110Noft³2511.00ft²209.25Bed 26 YesYesYes100Noft³1692.00ft²141.00Hallway7 YesYesYes100Noft³817.07ft²81.63Pantry8 YesYesYes100Noft³926.25ft²71.25Foyer9 YesYesYes110Noft³2511.00ft²209.25Office10 YesYesYes102Noft³8337.88ft²641.38Great Room11 YesYesYes111Noft³4752.00ft²432.00Master Bedroom12 YesYesYes100Noft³700.70ft²70.00His13 YesYesYes100Noft³770.77ft²77.00Hers14 YesYesYes100Noft³112.61ft²11.25M Lin15 YesYesYes100Noft³405.41ft²40.50Wtr Clst16 YesYesYes100Noft³2119.62ft²211.75Master Bath17 YesYesYes110Noft³2266.01ft²226.38Bed 318 YesYesYes100Noft³3026.38ft²275.13Rec Room19 YesYesYes100Noft³690.69ft²69.00Cabana Bath20 YesYesYes100Noft³810.81ft²81.00Vestibule21 YesYesYes102Yesft³6787.50ft²565.63Kit/Dining22 (Total Exposed Area = 3712 sq.ft.)FLOORS CarpetWoodTileU-FactorAreaR-ValuePerimeterSpaceFloor Type# 001.00.989ft²138.250ft26LaundryOn Grade Depth, Tile Flr Fnsh1 001.00.989ft²15.750ft0StorageOn Grade Depth, Tile Flr Fnsh2 001.00.989ft²7.000ft0LinOn Grade Depth, Tile Flr Fnsh3 001.00.989ft²63.250ft6Guest BathOn Grade Depth, Tile Flr Fnsh4 001.00.989ft²74.750ft10Back HallOn Grade Depth, Tile Flr Fnsh5 001.00.989ft²209.250ft22Bed 2On Grade Depth, Tile Flr Fnsh6 001.00.989ft²141.000ft0HallwayOn Grade Depth, Tile Flr Fnsh7 001.00.989ft²81.630ft0PantryOn Grade Depth, Tile Flr Fnsh8 001.00.989ft²71.250ft10FoyerOn Grade Depth, Tile Flr Fnsh9 001.00.989ft²209.250ft19OfficeOn Grade Depth, Tile Flr Fnsh10 001.00.989ft²641.380ft21Great RoomOn Grade Depth, Tile Flr Fnsh11 001.00.989ft²432.000ft52Master BedroomOn Grade Depth, Tile Flr Fnsh12 001.00.989ft²70.000ft0HisOn Grade Depth, Tile Flr Fnsh13 001.00.989ft²77.000ft11HersOn Grade Depth, Tile Flr Fnsh14 001.00.989ft²11.250ft0M LinOn Grade Depth, Tile Flr Fnsh15 001.00.989ft²40.500ft7Wtr ClstOn Grade Depth, Tile Flr Fnsh16 001.00.989ft²211.750ft30Master BathOn Grade Depth, Tile Flr Fnsh17 001.00.989ft²226.380ft22Bed 3On Grade Depth, Tile Flr Fnsh18 001.00.989ft²275.130ft49Rec RoomOn Grade Depth, Tile Flr Fnsh19 001.00.989ft²69.000ft14Cabana BathOn Grade Depth, Tile Flr Fnsh20 001.00.989ft²81.000ft11VestibuleOn Grade Depth, Tile Flr Fnsh21 001.00.989ft²565.630ft32Kit/DiningOn Grade Depth, Tile Flr Fnsh22 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 4...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S FORM R405-2017 ROOF PitchDeckEmittEmittSASolarRoofGableRoof (deg)Insul.TestedTestedAbsor.ColorAreaAreaMaterialsType# 2520No0.90No0.75Medium2936 f t²RoofMetalHip1 2520No0.90No0.75Medium1070 f t²RoofMetalHip2 2520No0.90No0.75Medium1161 f t²RoofMetalHip3 ATTIC IRCCRBSAreaVent Ratio (1 in)VentilationType# NNft²2660.630UnventedFull attic1 NNft²969.250UnventedFull attic2 NNft²1051.750UnventedFull attic3 (Total Exposed Area = 3712 sq.ft.)CEILING Truss TypeFraming FractionAreaU-FactorR-ValueSpaceCeiling Type# Wood0.10ft²138.250.4050LaundryAttic, Metal Roof, R-20 Roof Deck In1 Wood0.10ft²15.750.4050StorageAttic, Metal Roof, R-20 Roof Deck In2 Wood0.10ft²7.000.4050LinAttic, Metal Roof, R-20 Roof Deck In3 Wood0.10ft²63.250.4050Guest BathAttic, Metal Roof, R-20 Roof Deck In4 Wood0.10ft²74.750.4050Back HallAttic, Metal Roof, R-20 Roof Deck In5 Wood0.10ft²209.250.4050Bed 2Attic, Metal Roof, R-20 Roof Deck In6 Wood0.10ft²141.000.4050HallwayAttic, Metal Roof, R-20 Roof Deck In7 Wood0.10ft²81.630.4050PantryAttic, Metal Roof, R-20 Roof Deck In8 Wood0.10ft²71.250.4050FoyerAttic, Metal Roof, R-20 Roof Deck In9 Wood0.10ft²209.250.4050OfficeAttic, Metal Roof, R-20 Roof Deck In10 Wood0.10ft²641.380.4050Great RoomAttic, Metal Roof, R-20 Roof Deck In11 Wood0.10ft²432.000.4050Master BedroomAttic, Metal Roof, R-20 Roof Deck In12 Wood0.10ft²70.000.4050HisAttic, Metal Roof, R-20 Roof Deck In13 Wood0.10ft²77.000.4050HersAttic, Metal Roof, R-20 Roof Deck In14 Wood0.10ft²11.250.4050M LinAttic, Metal Roof, R-20 Roof Deck In15 Wood0.10ft²40.500.4050Wtr ClstAttic, Metal Roof, R-20 Roof Deck In16 Wood0.10ft²211.750.4050Master BathAttic, Metal Roof, R-20 Roof Deck In17 Wood0.10ft²226.380.4050Bed 3Attic, Metal Roof, R-20 Roof Deck In18 Wood0.10ft²275.130.4050Rec RoomAttic, Metal Roof, R-20 Roof Deck In19 Wood0.10ft²69.000.4050Cabana BathAttic, Metal Roof, R-20 Roof Deck In20 Wood0.10ft²81.000.4050VestibuleAttic, Metal Roof, R-20 Roof Deck In21 Wood0.10ft²565.630.4050Kit/DiningAttic, Metal Roof, R-20 Roof Deck In22 (Total Exposed Area = 3712 sq.ft.)WALLS Below Grade% Solar Absor. Frm.U-Sheathing R-Value HeightWidthCavityAdjacent To Frac.FactorAreaInFtInFtR-ValueSpaceWall TypeOrnt# 00.600.220.1094ft²115.10106110LaundryBlk Wall, StuccoExteriorW1 00.750.250.0800ft²140.101001413LaundryFrm Wall, 1/2" GyPartition-2 00.600.220.1094ft²55.1010650Guest BathBlk Wall, StuccoExteriorW3 00.600.220.1094ft²35.0010630Back HallBlk Wall, StuccoExteriorE4 00.600.220.1094ft²20.0010020Back HallBlk Wall, StuccoExteriorS5 00.750.250.0800ft²45.00106413Back HallFrm Wall, 1/2" GyPartition-6 00.600.220.1094ft²96.0012080Bed 2Blk Wall, StuccoExteriorE7 00.600.220.1094ft²162.00126130Bed 2Blk Wall, StuccoExteriorS8 00.600.220.1094ft²123.5013690FoyerBlk Wall, StuccoExteriorS9 00.600.220.1094ft²162.00126130OfficeBlk Wall, StuccoExteriorS10 00.600.220.1094ft²66.0012650OfficeBlk Wall, StuccoExteriorW11 00.600.220.1094ft²273.00130210Great RoomBlk Wall, StuccoExteriorN12 00.600.220.1094ft²176.00110160Master BedroomBlk Wall, StuccoExteriorN13 00.600.220.1094ft²280.50116250Master BedroomBlk Wall, StuccoExteriorE14 00.600.220.1094ft²115.50116100Master BedroomBlk Wall, StuccoExteriorW15 00.600.220.1094ft²110.10100110HersBlk Wall, StuccoExteriorE16 00.600.220.1094ft²20.0010020Wtr ClstBlk Wall, StuccoExteriorN17 00.600.220.1094ft²45.0010640Wtr ClstBlk Wall, StuccoExteriorE18 00.600.220.1094ft²125.10106120Master BathBlk Wall, StuccoExteriorE19 00.600.220.1094ft²155.20106150Master BathBlk Wall, StuccoExteriorS20 00.600.220.1094ft²15.0010610Master BathBlk Wall, StuccoExteriorW21 00.600.220.1094ft²60.1010060Bed 3Blk Wall, StuccoExteriorN22 00.600.220.1094ft²155.20106150Bed 3Blk Wall, StuccoExteriorW23 00.600.220.1094ft²165.00110150Rec RoomBlk Wall, StuccoExteriorN24 00.600.220.1094ft²181.50116160Rec RoomBlk Wall, StuccoExteriorE25 00.600.220.1094ft²187.00110170Rec RoomBlk Wall, StuccoExteriorW26 00.600.220.1094ft²35.0010630Cabana BathBlk Wall, StuccoExteriorS27 00.600.220.1094ft²100.10100100Cabana BathBlk Wall, StuccoExteriorW28 00.600.220.1094ft²63.7010460VestibuleBlk Wall, StuccoExteriorNE29 00.600.220.1094ft²42.5010340VestibuleBlk Wall, StuccoExteriorSW30 00.600.220.1094ft²66.0012650Kit/DiningBlk Wall, StuccoExteriorN31 00.600.220.1094ft²118.80121190Kit/DiningBlk Wall, StuccoExteriorNE32 00.600.220.1094ft²18.0012610Kit/DiningBlk Wall, StuccoExteriorE33 00.600.220.1094ft²150.00126120Kit/DiningBlk Wall, StuccoExteriorW34 00.600.220.1094ft²33.90121020Kit/DiningBlk Wall, StuccoExteriorNW35 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 5...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S FORM R405-2017 (Total Exposed Area = 676 sq.ft.)WINDOWS InteriorOverhangWall ScreeningShadeSeparationDepthAreaImpactSHGCU-FactorNFRCPanesFrameIDOrnt# outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²18.0Yes0.210.640YesLow-E DoubleMetal1W1 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²9.0Yes0.210.640YesLow-E DoubleMetal3W2 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²11.3Yes0.210.640YesLow-E DoubleMetal4E3 NoneNone2 ft 0 in2 ft 0 inft²10.0Yes0.250.400YesLow-E DoubleMetal8S4 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²30.0Yes0.210.640YesLow-E DoubleMetal8S5 NoneNone2 ft 0 in10 ft 0 inft²12.0Yes0.250.400YesLow-E DoubleMetal9S6 NoneNone2 ft 0 in10 ft 0 inft²48.0Yes0.310.790YesLow-E DoubleMetal9S7 NoneNone2 ft 0 in2 ft 0 inft²10.0Yes0.250.400YesLow-E DoubleMetal10S8 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²30.0Yes0.210.640YesLow-E DoubleMetal10S9 NoneNone2 ft 0 in15 ft 0 inft²120Yes0.370.810YesLow-E DoubleMetal12N10 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²33.5Yes0.250.400YesLow-E DoubleMetal13N11 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²31.0Yes0.210.640YesLow-E DoubleMetal13N12 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²25.0Yes0.250.400YesLow-E DoubleMetal14E13 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²10.0Yes0.250.400YesLow-E DoubleMetal16E14 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²11.3Yes0.210.640YesLow-E DoubleMetal18E15 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²10.0Yes0.250.400YesLow-E DoubleMetal19E16 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²27.0Yes0.250.400YesLow-E DoubleMetal20S17 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²36.0Yes0.210.640YesLow-E DoubleMetal23W18 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²20.0Yes0.250.400YesLow-E DoubleMetal24N19 outdoorBlinds 4 5°2 ft 0 in18 ft 0 inft²12.0Yes0.210.640YesLow-E DoubleMetal25E20 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²20.0Yes0.250.400YesLow-E DoubleMetal26W21 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²11.3Yes0.210.640YesLow-E DoubleMetal28W22 NoneNone2 ft 0 in16 ft 7 inft²20.0Yes0.310.790YesLow-E DoubleMetal29NE23 NoneNone2 ft 0 in6 ft 0 inft²20.0Yes0.310.790YesLow-E DoubleMetal30SW24 outdoorBlinds 4 5°2 ft 0 in20 ft 0 inft²24.0Yes0.250.400YesLow-E DoubleMetal31N25 outdoorBlinds 4 5°2 ft 0 in14 ft 0 inft²41.0Yes0.250.400YesLow-E DoubleMetal32NE26 outdoorBlinds 4 5°2 ft 0 in2 ft 0 inft²25.0Yes0.250.400YesLow-E DoubleMetal34W27 GARAGE Exposed Wall InsulationAvg. Wall HeightExposed Wall PerimeterCeiling AreaFloor Area# 01 INFILTRATION ACH 50ACHEqLAELACFM 50SLAMethodScope# 7.000.53508.9271.049270.000507Blower DoorWholehouse1 HEATING SYSTEM DuctsBlockCapacityEfficiencySubtypeSystem Type# sys#1136.4 kBtu/hrAFUE: 100.0Electric strip1 sys#2215.5 kBtu/hrAFUE: 100.0Electric strip2 COOLING SYSTEM DuctsBlockSHRAir FlowCapacityEfficiencySubtypeSystem Type# sys#110.701567 cfm47.0 kBtu/hrSEER: 16.0Split air conditioner1 sys#220.70600 cfm18.0 kBtu/hrSEER: 14.0Split air conditioner2 HOT WATER SYSTEM ConservationSetPntUseCapEFLocationSubtypeSystem Type# None120 °F70 gal0 gal1.00Propane instantaneous1 DUCTS HVAC #PercentCFM 25AirReturn------------------Supply ------------------ CoolHeatRLFQNLeakageOutHandlerLeakage TypeAreaLocationAreaR-ValueLocation# 116.00(Default)Uncond GarDefault Leakage338 f t²A/H 1 Attic664 f t²6.0A/H 1 Attic1 226.00(Default)Uncond GarDefault Leakage238 f t²A/H 2 Attic290 f t²6.0A/H 2 Attic2 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 6...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S FORM R405-2017 TEMPERATURES Ceiling Fans:YProgrammable Thermostat: Dec]X[Nov]X[Oct]X[Sep]X[Aug]X[Jul]X[Jun]X[May]X[Apr]X[Mar]X[Feb]X[Jan]X[Cooling Dec]X[Nov]X[Oct]X[Sep]X[Aug]X[Jul]X[Jun]X[May]X[Apr]X[Mar]X[Feb]X[Jan]X[Heating Dec]X[Nov]X[Oct]X[Sep]X[Aug]X[Jul]X[Jun]X[May]X[Apr]X[Mar]X[Feb]X[Jan]X[Venting HoursFlorida Building Code, 6th Edition (2017) Thermostat Schedule: 121110987654321Schedule Type 757575757575757575757575AMCooling (WD) 757575757575757575757575PM 757575757575757575757575AMCooling (WEH) 757575757575757575757575PM 727272727272727272727272AMHeating (WD) 727272727272727272727272PM 727272727272727272727272AMHeating (WEH) 727272727272727272727272PM FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 7...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX = 87 The lower the EnergyPerformance Index, the more efficient the home. 1. New home or addition 12. Ducts, location & insulation levelNew (From Plans)1. _______________ 6.0R______________a. Supply ducts: 2. Single-family or multiple-family Single-Family2. _______________6.0R______________b. Return ducts: Uncond Gar,Uncond Gar______________c. AHU location: 3. Number of units, if multiple-family 13. _______________ 65.0Capacity_______________13. Cooling systems 4. Number of bedrooms 14.00SEER______________a. Split system:44. _______________ SEER______________b. Single package: 5. Is this a worst case? (yes/no)No5. _______________SEER/COP______________c. Ground/water source: EER______________d. Room unit/PTAC: 6. Con dition ed floor area (ft²)3712.386. _____________________________e. Other: 7. Windows, type and area*51.9Capacity____________14. Heating systems HSPF______________a. Split system heat pump:Dbl Impact(Avg), 0.5957a. ______________a. U-Factor: HSPF______________b. Single package heat pump:0.277b. ______________b. Solar Heat Gain Coefficient (SHGC): 100.00COP_______________c. Electric resistance:6767c. ______________c. Area (ft²) AFUE______________d. Gas furnace, natural gas: 8. Skylights AFUE______________e. Gas furnace, LPG: ______________f. Other:8a. ______________a. U-Factor: 8b. ______________b. Solar Heat Gain Coefficient (SHGC): 15. Water heating systems 9. Floor type, insulation level EF______________a. Electric resistance: EF______________b. Gas fired, natrual gas:0.09a. ______________a. Slab-on-grade (R-value): 0.999EF______________c. Gas fired, LPG:9b. ______________b. Wood, raised (R-value): EF______________d. Solar system with tank:9c. ______________c. Concrete, raised (R-value) EF______________e. Dedicated heat pump with tank: 10 Wall type and insulation:______________HeatRec%f. Heat recovery unit: ______________g. Other:a. Exterior: 10a1. ____________1. Wood frame (Insulation R-value): 16. HVAC credits claimed (Performance Method)410a2. ____________2. Masonry (Insulation R-value): ______________a. Ceiling fans:b. Adjacent: ______________b. Cross ventilation:1310b1. ____________1. Wood frame (Insulation R-value): ______________c. Whole house fan:10b2. ____________2. Masonry (Insulation R-value): Yes______________d. Multizone cooling credit: 11. Ceiling type and insulation level Yes______________e. Multizone heating credit: Yes______________f. Programmable thermostat:0.011a. _____________a. Under attic (R-value): 11b. _____________b. Single assembly (R-value): 11c. _____________c. Knee walls/skylight walls (R-value) 11d. _____________d. Radiant barrier installed *Label required by Section 303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code compliant features. Builder Signature: _________________________Date: ______________________ Address of New Home: _____________________TBD Noble Oaks Ln Port St Lucie, FL 34952City/FL Zip: _________________ 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 8...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S FORM R405-2017 Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods PERMIT #:TBD Noble Oaks LnADDRESS: Port St Lucie, FL 34952 MANDATORY REQUIREMENTS - See individual code sections for full details. SECTION R401 GENERAL The building official shall require that an energy performance level (EPL)R401.3 Energy Performance Level (EPL) display card (Mandatory). display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law (Section 553.9085, Florida Statues) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit. completed and signed by the builder The building official shall verify that the EPL display card accurately reflects the plans and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix RD. The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements ofR402.4 Air leakage (Mandatory). Sections R402.4.1 through R402.4.5. Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted toException:comply with Section C402.5. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealingR402.4.1 Building thermal envelope. methods between dissimilar materials shall allow for differential expansion and contraction. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordanceR402.4.1.1 Installation. w ith the man uf ac turer’s ins tructions a nd th e criteria listed in Ta ble 4 02.4.1.1, a s ap plica ble to the metho d of cons truct ion. Where requ ired by the code official, an approved third party shall inspect all components and verify compliance. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven airR402.4.1.2 Testing. changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in accordance with ANSI/RESET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existingException:buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. New wood-burning fireplaces shall have tight-fitting flue dampers or doors, and outdoor combustion air. WhereR402.4.2 Fireplaces. using tight-fitting doors on factory-built fireplaces listed and labeledin accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight-figging doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm perR402.4.3 Fenestration air leakage. square foot (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer. Site-built windows, skylights and doors.Exception: FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 9...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S MANDATORY REQUIREMENTS - (Continued) In Climate Zones 3 through 8, where open combustion air ducts provide combustion air toR402.4.4 Rooms containing fuel-burning appliances open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirementsof Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent apliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakageR402.4.5 Recessed lighting. between conditioned and unconditioned spaces. All recessed luminaires shall be IC-rated and labeled as having an air leakage rate not more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. SECTION R403 SYSTEMS R403.1 Controls At least one thermostat shall be provided for each separate heating and cooling system.R403.1.1 Thermostat provision (Mandatory). Heat pumps having supplementary electric-resistance heat shall have controlsR403.1.3 Heat pump supplementary heat (Mandatory). that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load. All ducts, air handlers, filter boxes and building cavities that form the primary air containment passagewaysR403.3.2 Sealing (Mandatory). for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i), Florida Statutes, to be "substantially leak free" in accordance with Section R403.3.3. A ir hand lers shall have a ma nuf a cture r’s d esign ation f or a n air leaka ge o f no more than 2 pe rcentR403.3.2.1 Sealed air handler. of the design air flow rate when tested in accordance with ASHRAE 193. Ducts shall be pressure tested to determine air leakage by one of the following methods:R403.3.3 Duct testing. 1. Rough-in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test. 2. Post construction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. All registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Building framing cavities shall not be used as ducts or plenums.R403.3.5 Building Cavities (Mandatory). Me chan ical s yste m pip ing c apab le of carry ing f luids abov e 105 °F (4 1°C)R403.4 Mechanical system piping insulation (Mandatory). or below 55°F (13 °C) s hall b e ins ulate d to a min imum of R-3. Piping insulation exposed to weather shall be protected from damage, including thatR403.4.1 Protection of piping insulation. caused by sunlight, moisture, equipment maintenance, and wind, and shall provide shielding from solar radiation that can cause degradation of the material. Adhesive tape shall not be permitted. Heated water circulation systems shall be inR403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). accordance with Section R403.5.1.1. Heat trace termperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible. Heated water circulation systems shall be provided with a circulation pump. The system return pipeR403.5.1.1 Circulation systems. shall be dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for how water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systemsR403.5.1.2 Heat trace systems. shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 10...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S MANDATORY REQUIREMENTS - (Continued) Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heatR403.5.5 Heat traps (Mandatory). traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3 1/2 inches (89 mm) in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies (Mandatory). R403.5.6.1 Storage water heater temperature controls. Service water heating systems shall be equipped with automatic temperature controls capableR403.5.6.1.1 Automatic controls. of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature se tting r ange sha ll be f rom 1 00°F to 1 40°F (38°C to 6 0°C). A separate switch or a clearly marked circuit breaker shall be provided to permit the power suppliedR403.5.6.1.2 shut down. to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of combustion types of service water heating systems to be turned off. Water heating equipment installed in residential units shall meet the minimum efficiencies ofR403.5.6.2 Water heating equipment. Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water heating category. Solar water heaters shall met the criteria of Section R403.5.6.2.1. Solar systems for domestic hot water production are rated by the annual solar energyR403.5.6.2.1 Solar water heating system. factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar water-heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and 2. Be installed at an orientation within 45 degrees of true south. The building shall be provided with ventilation that meets the requirements of the FloridaR403.6 Mechanical ventilation (Mandatory). Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation, including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. When installed to function as a whole-house mechanicalR403.6.1 Whole-house mechanical ventilation system fan efficacy. ventilation system, fans shall meet the efficacy requirements of Table R403.6.1. Where mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered byException:an electronically commutated motor. Residential buildings designed to be operated at a positive indoor pressure of for mechanicalR403.6.2 Ventilation air. ventilation shall meet the following criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed spaces(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum or R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on theR403.7.1 Equipment sizing. equipment loads calculated in accordance with ACCA Manual J or other approved methodologies, heating and cooling calculation based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1 WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY AIRFLOW RATE MAXIMUMMINIMUM EFFICACY (a)AIRFLOW RATE MINIMUMFAN LOCATION CFMCFM/WATTCFM Any2.8 cfm/wattAnyRange hoods Any2.8 cfm/wattAnyIn-line fan < 901.4 cfm/watt10Bathroom, utility room Any2.8 cfm/watt90Bathroom, utility room (a) When tested in accordance HVI Standard 916For SI: 1 cfm - 28.3 L/min. 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 11...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S MANDATORY REQUIREMENTS - (Continued) Cooling only equipment shall be selected so that its total capacity is not lessR403.7.1.1 Cooling equipment capacity. than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Se ction 403.7, or the c loses t ava ilable size prov ided by th e ma nuf ac ture r’s pr oduc t lines . The cor respo ndin g late nt ca pacit y of t he equipment shall not be less than the calculated latent load. Th e pub lishe d value f o r A HRI tota l cap acity is a nominal, r ating-test value and shall not b e us ed f o r equ ipme nt siz ing. Manu f actu rer’s expanded performance data shall be used to select cooling-only equipment. This selection shall be based on the outdoor design dry-bulb temperature for the load calculation (or entering water temperature for water-source equipment), the blower CFM provided by the expanded performance data, the design value for entering wet-bulb temperature and the design value for entering dry-bulb temperature Design values for entering wet-bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space. Exceptions: 1. Attached single- and multiple-family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer, in attached single- and multiple-family units, the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. Heat pump sizing shall be based on the cooling requirements as calculated according to SectionR403.7.1.2.1 Heat pumps R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. Electric resistance furnaces shall be sized within 4 kW of the designR403.7.1.2.2 Electric resistance furnaces. requirements calculated according to the procedure selected in Section R403.7.1 The capacity of fossil fuel heating equipment with natural draft atmospheric burnersR403.7.1.2.3 Fossil fuel heating equipment. shall not be less than the design load calculated in accordance with Section R403.7.1. Residences requiring excess cooling or heating equipment capacity on anR403.7.1.3 Extra capacity required for special occasions. intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. Systems serving multiple dwelling units shall comply with SectionsR403.8 Systems serving multiple dwelling units (Mandatory). C4 03 an d C4 04 of the IECC—Commer cial Provis ions in lieu of S ectio n R40 3. Snow- and ice-melting systems, supplied through energy service to the building,R403.9 Snow melt and ice system controls (Mandatory). sh all inc lude automatic cont rols c apab le of shut ting o f f the sys tem w hen the p avement tempe ratu re is abov e 50°F (10 °C), a nd n o pre cipita tion is f alling a nd an auto matic or manua l con trol t hat w ill allow s hutof f w h en th e out door temp eratu re is abov e 40°F (4.8°C). The energy consumption of pools and permanent spasR403.10 Pools and permanent spa energy consumption (Mandatory). shall be in accordance with Sections R403.10.1 through R403.10.5. The electric power to heaters shall be controlled by a readily accessible on-off switch that is anR403.10.1 Heaters. integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. Gas-fired heaters shall not be equipped with continuously burning ignition pilots. Time switches or other control methods that can automatically turn off and on according to a preset scheduleR403.10.2 Time switches. shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operations. 2. Pumps that operate solar- and waste-heat-recovery pool heating systems. 3. Where pumps are powered exclusively from on-site renewable generation. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor- retardant cover on or atR403.10.3 Covers. the water surface or a liquid cover or other means proven to reduce heat loss. Where more than 70 percent of the energy for heating, computed over an operation season, is from site-recoveredException:energy, such as from a heat pump or solar energy source, covers or other vapor-retardant means shall not be required. All gas- and oil-fired pool and spa heaters shall have a minimum thermalR403.10.4 Gas- and oil-fired pool and spa heaters. efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 12...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S MANDATORY REQUIREMENTS - (Continued) Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordanceR403.10.5 Heat pump pool heaters. with AHRI 1160, Table 2, Standard Rating Conditions-Low Air Temperature. A test report from an independent laboratory is required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard. The energy consumption of electric-powered portable spas shall be controlled by theR403.11 Portable spas (Mandatory). requirements of APSP-14. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS Not less than 75 percent of the lamps in permanently installed lighting fixtures shall beR404.1 Lighting equipment (Mandatory). high-efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high-efficacy lamps. Low-voltage lighting.Exception: Fuel gas lighting systems shall not have continuously burning pilot lights.R404.1.1 Lighting equipment (Mandatory). FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 13...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Villadelta Construction CorBuilder NamePereira ResidenceProject Name:Permit Office:TBD Noble Oaks LnStreet:Permit Number:Port St Lucie, FL 34952City, State, Zip:St LucieJurisdiction:Pereira ResidenceOwner:FL, St Lucie Co IntlDesign Location: INSULATION INSTALLATION CRITERIAAIR BARRIER CRITERIACOMPONENT A continuous air barrier shall be installed in theGeneral requirements Air-permeable insulation shall not be used as abuilding envelope. The exterior thermal envelope sealing material.contains a continuous barrier. Breaks or joints in theair barrier shall be sealed. The insulation in any dropped ceiling/soffitThe air barrier in any dropped ceiling/soffitCeiling/attic shall be aligned with the air barrier.shall be aligned with the insulation and any gaps in the air barrier shall be sealed. Access openings, drop down stairs or knee wall doorsto unconditioned attics paces shall be sealed. Cavities with corners and headers of frame wallsThe junction of the foundation and sill plateWalls shall be insulated by completely filling the cavityshall be sealed.The junction of the top plate with a material having a thermal resistance of R-3and the top of exterior walls shall be sealed. per inch minimum.Knee walls shall be sealed. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier The space between window/door jambs and framing,Windows, skylights and skylights and framing shall be sealed.and doors Rim joists shall be insulated.Rim joists are insulated and include an air barrier.Rim joists Floor framing cavity Insulation shall be installedThe air barrier shall be installed at any exposedFloors (including to maintain permanent contact with the undersideedge of insulation.above-garage and of subfloor decking, or floor framing cavitycantilevered floors) insulation shall be permitted to be in contact with the top sideof sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Where provided in lieu of floor insulation,Exposed earth in unvented crawl spaces shall beCrawl space insulation shall be permanently attachedcovered with a Class I vapor retarder withwalls to the crawlspace walls.overlapping joints taped. Duct shafts, utility penetrations, and flue shaftShafts, penetrations openings to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, orNarrow cavities narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Air sealing shall be provided between the garageGarageand conditioned spaces.separation Recessed light fixtures installed in theRecessed light fixtures installed in the buildingRecessed building thermal envelope shall be air tightthermal envelope shall be sealed to the drywall.lighting and IC rated. Batt insulation shall be cut neatly to fit aroundPlumbing and wiring and plumbing in exterior walls, orwiring insulation that on installation readily conforms to available space shall extend behind piping and wiring. Exterior walls adjacent to showers and tubsThe air barrier shall be installed behindShower/tub on shall be insulated.electrical or communication boxes or air-sealedexterior wall boxes shall be installed. The air barrier shall be installed behindElectrical/phone electrical or communication boxes or air-sealedbox on exterior boxes shall be installed.walls HVAC register boots that penetrate buildingHVAC register thermal envelope shall be sealed to the subfloorboots or drywall. When required to be sealed, concealed fireConcealed sprinklers shall only be sealed in a manner thatsprinklers is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or ceilings. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 14...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S FORM R405-2017 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Permit Number:St LucieJurisdiction: Job Information Lot:Community:Villadelta Construction CorBuilder: Unit:TBD Noble Oaks LnAddress: 34952Zip:FLState:Port St LucieCity: Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceedingPRESCRIPTIVE METHOD 7 air changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub-section ACH50. PERFORMANCE or ERI METHOD 7.000ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): Method for calculating building volume:42231_________ x 60 ÷ _______________ = _________ ACH(50)Building VolumeCFM(50)Retrieved from architectural plans PASS Code software calculated Field measured and calculatedWhen ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.R402.4.1.2 Testing. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or and approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping orother infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: ___________________________________ Phone: __________________ I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: ____________________________________ Date of Test: _____________ Printed Name of Tester: __________________________________________________________ License/Certification #: __________________________ Issuing Authority: _________________ FORM R405-2017 2021-Feb-12 13:36:58Section 405.4.1 Compliant SoftwareRight-En ergy ® Florid a 201 7Right-Su ite® U niv er sal 20 21 21 .0.03 RSU2 7054 Page 15...t HVAC\TBD Noble Oaks Ln - Pereira Res -VCC.rup Calc = MJ8 Front Door faces: S Duct Leakage Test Report Residential Perscriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Permit Number:St LucieJurisdiction: Job Information Lot:Community:Villadelta Construction CorBuilder: Unit:TBD Noble Oaks LnAddress: 34952Zip:FLState:Port St LucieCity: Duct Leakage Test Results cfm25 (Total)Prescriptive Method_______ cfm25System 1 To qualify as "substantially leak free" Qn Total must be less than or equal to 0.04 if air handler unit is installed. If air handler unit is not installed, Qn Total must be less than or equal to 0.03. This testing method meets the requirements in accordance with Section R403.3.3. _______ cfm25System 2 _______ cfm25System 3 Is the air handler unit installed_______ cfm25Sum of any (<= 0.04 Qn)YESadditional systems (<= 0.03 Qn)NOduring testing?Total of all _______ cfm25systems cfm25 (Out or Total)Performance / ERI Method To qualify using this method, Qn must be not greater than the proposed duct leakage Qn specified on Form R405-2017 or R406-2017. 3712_________ ÷ _______________ = _________ Qn Total Conditioned Square Footage Total of all systems Qn specified on Form R405-2017Leakage Type selected on Form (Energy Calc) or R406-2017R405-2017 (Energy Calc) or R406-2017FAILPASSDefault Leakage Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statues. Testing Company Company Name: ___________________________________ Phone: __________________ I hereby verify that the above duct leakage test results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: ____________________________________ Date of Test: _____________ Printed Name of Tester: __________________________________________________________ License/Certification #: __________________________ Issuing Authority: _________________ Reference Home Characteristics Pereira Residence Title: TBD Noble Oaks Ln - Pereira Res -VCC TMY City: FL_Fort_PierceTBD Noble Oaks LnPort St Lucie, FL 34952 FLBase2017 0.084Above-grade Walls (Uo) 0.75Above-grade Wall Solar Absorptance 0.90Above-grade Wall Infared Emittance n/aBasement Walls (Uo) n/aAbove-grade Floors (Uo) 0.0Slab Insulation R-Value 0.030Ceilings (Uo) 0.75Roof Solar Absorptance 0.90Roof Infared Emittance 8.87Attic Ve nt Ar ea (ft²) n/aCrawlspace Ven t Are a (ft²) 936.33Exposed Mason ry Fl oor Area (ft²) 2.0Carpet & Pad R-Value 0.00Door Area (ft²) n/aDoor U-Factor 39.44North Wind ow Area (ft²) 139.21South Wind ow Area (ft²) 139.21East Windo w Ar ea (ft²) 139.21West Windo w Area (ft²) 0.400Window U-Factor 0.2169Window SHGC (Heating) 0.2169Window SHGC (Cooling) 7.00ACH50 140571Internal Gains * (Btu/day) 140.00Water heater gallons per day 120.00Water Heater set point temperature 0.47Water heater efficiency rating HSPF = 8.2Labeled Heating System Rating and Efficiency SEER = 14.0Labeled Cooling System Rating and Efficiency 0.88Air Distribution System Efficiency ManualThermostat Type 72.0 (All hours)Heating Thermostat Settings