Loading...
HomeMy WebLinkAboutInspection results-Eufer GroundJ gp. , ®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: _'R-it? Lf Permit No. Project:_ ('90Ae S Address: 3334:j '/Q, ,Ty C,e Lor 41 �C/heck one: YL Regular Inspection: 0 Relnspectbn Date of Initial Inspection: Inspection Type Requested (check): WILDING/STRUCTURAL ELERRIGL PLUMBING MECRANICAL F^^U^ Underground Underground Duct Rough -lit Slab Floor Rough -In Rough -in Steam Piping& Test Mason Wall Rou h-In Stack Piping& TestHW Piping & Test Wall/Ced Ceiling Rough -in Water Piping & Tert CHW Piping & Test Frami Panel/Feeder Gas Piping & Test Cord. Piping & Test Structural Service/Ground Storm Piping & TestInsulation Sheet Rock pllance/E uirrlent Fixtures Wall & Ceiling Roof, Lighting Protection Equipment Equipment Re -inspection Re -Ins an Re -ins ectbn Re -inspection Final Bw Final Electncel Final Plumtu Final Mechankal Otherlaspecncm Type: Area Inspected/Code.. &13 E4N rrYY k, n- SAz, [i- inspection Resulm KAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP•Disapproved ❑ Not Ready ConGuons/Comments. -e4A, P de•--� t+rr r-t 1. 2 3 4 5 6 7 Inspector's NameUCI, t?v �a e OFFICES THROUGHOUT FLORIDA 607 NW Commodity Ccr, r, Port St. Lucie, Florida 34986 • 1772) 924-3575 • (772) 924-3590 (fax) www teamata. Co.