Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Inspection results-Slab
:,a ®UNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection DatePermit No -207/ _ O!/-9 Project C F?2C Y S rdlt Address. 3330 T2r u.T4 C.k 10-T V I l -Check one. - 11 • Regular Inspection. ❑ Remspectiun Date of Initial Inspection: Inspection Type Requested (check). SUIIDING STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footm Undentround Underground Duct Rou h-In Stab Floor Rough -in Rough -in Steam Piping & Test Mason Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceien Ceiling Rough -In Water Piping &Test CHW Piping &Test Gramm Panel/feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roohn Lighting Protection Equipment Equipment Remspectron Reins ection '--in ett'on Re -Ins ection Final Bmidr Final Electoral Fnal PlumDm Final Mechanical Other Inspection Type: // � Area Inspected/Code. /4W 54AI,& d Inspection Results: tit AP -Approved ❑ AE-Approved with Eueptlons ❑ DA-0Wflowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: $TZ�4 f4s G�. a--4 CZ&A tic.—.C. 4 i 2 3 4 5 6 7 - Inspector's Name' s V F"'L4-' ticif 6y OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Pon St. Lucie, Florida 34986 - 1772) 924-3575 • (772) 924-3580 (fax) tAW LA USAI teen