HomeMy WebLinkAboutSLC Building PermitCode Compliance Division
2300 Virginia Avenue
Ft Pierce, FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
http://stiucieco.gov/ce
Issued: , 03/10/2008
'&BUILDING PERMIT
Conf #: 678
Permit #: SLC- 0802-0274
Job Location: 7685 WEXFORD WAY City: PORT ST LUCIE
Permit Type: Pool Enclosure
Job Description: REBUILD POOL ENCLOSURE ON EXISTING CONCRETE
Subdiv: Reserve Plantation Phase 1
Lot: 21
Block:
Parcel: 3321-801-0021-000/7
Page 1
Contractor NEWMAN MICHAEL J PIONEER SCREEN COMPANY INC II (772) 340-4393
1682 SW BILTMORE ST PORT ST LUCIE, FL 34984
Property Owner BRIAN C DEUSCHLE (954) 563-1072
7685 WEXFORD WAY PORT ST LUCIE, FL 34986-3006
Setbacks Left: 120.00 Right: 106.00 Front: Rear: 29.69 Zoning: RS-2
Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 0.00
Minimum Floor Elevation: Flood Map: 275F Flood Zone: X Elev:
Job Value: $ 81,608.01
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Christopher Lestrange
Building Official Date
For Automated Inspections, Call (772) 462-126.1
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work
is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of
issuance of the Building Permit.