Loading...
HomeMy WebLinkAboutSLC Building PermitCode Compliance Division 2300 Virginia Avenue Ft Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 http://stiucieco.gov/ce Issued: , 03/10/2008 '&BUILDING PERMIT Conf #: 678 Permit #: SLC- 0802-0274 Job Location: 7685 WEXFORD WAY City: PORT ST LUCIE Permit Type: Pool Enclosure Job Description: REBUILD POOL ENCLOSURE ON EXISTING CONCRETE Subdiv: Reserve Plantation Phase 1 Lot: 21 Block: Parcel: 3321-801-0021-000/7 Page 1 Contractor NEWMAN MICHAEL J PIONEER SCREEN COMPANY INC II (772) 340-4393 1682 SW BILTMORE ST PORT ST LUCIE, FL 34984 Property Owner BRIAN C DEUSCHLE (954) 563-1072 7685 WEXFORD WAY PORT ST LUCIE, FL 34986-3006 Setbacks Left: 120.00 Right: 106.00 Front: Rear: 29.69 Zoning: RS-2 Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 0.00 Minimum Floor Elevation: Flood Map: 275F Flood Zone: X Elev: Job Value: $ 81,608.01 Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S. Christopher Lestrange Building Official Date For Automated Inspections, Call (772) 462-126.1 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and become null and void if work authorized by such Building Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit.