Loading...
HomeMy WebLinkAboutProduct Review; Premium Plus Skirting0l//2812014 ":Z= 1;w463 F1,004tDOIB 71 Solid', Pane .04011�: �i Centir.-Ven Panel .04011` • Top Front im .050 0 59, .11: • Top gack Tim ,059 i 0. Rnttoiv. Tdri .047 Ventilation: I Center Vent 8.4 sq. in./ft. f panel Available Colo s White Grey Tan Clay Sand V nfilation: Cent Vent,4.9 sq. in./ft. of panel ,ei Vinyl Skirting M A vai able Colo*, §olid Panel 35 White Grey • Vented Panel -.3.35 II 'Front Tan TIP TOM p 350" Clay T 3p Back Trim. 348 Sand •Boftom Trim j40` Trim k1i Coparlsion: PremIUM Plus Eagle Fro Rail I '050d NOTE: T�p Back trim fief Top Back Back ail Bolto Charm .05w .04711 04W Premium P and Eagle m P it's ar t .04W Trim Kite.ar the Same io Top FroinfTrim, idth 4.725" s 4 .360. dimsnsions Upper Lag .590, .6501, ft 4 HEAVIER; The rei is6n ma Installers use Premium Plqs Trim Kitswitli Eagl9 Panel Is because and, in areas where Now-wi is a- Problem, Premium Piuis offers more rigid protection ag n8t blow-out. 9w/Z0 39Vd 10d3a 3WOH 3-II80W 0849LSVE19 :r,Qp /1-0 S STEP A: ATTACH BACK RAIL 1. Determine a place for mounting. Place bottom edge of back rail just below bottom edge of the home,, Taus location must offer solid support for attaching and wind load pressure for pastels and rails. 2. Keep the back rail straight and level, Snap a chant be around the home to guide the top edge of the back rail. 3. Correct screwing or nailing method for back rail: Start on the back side of the home. Position screws or nails in the center of the slot. Serewfn-A to allow for a clearance of 1116" from the bark rail surface. Now. avoid tightly screwing or nailing back rail. A 1/16" clearance allows for normal expansion and contraction with temperature change. Place a screw or nail in every other slot. 4. Provide a 1/2" gap between each back rail section for normal thermal expansion. To install around comer, refer to Step E. PASO A: INSTALL EL RIEL DE APOYO 1. Aetermine un lugau pars el montaje. Coloque el horde inferior del riel de apoyo justo abajo del horde inferior de 1a casa. Esta ubicaci6n debe ofrecer un apoyo fame que perrnita rlavar Los rielcs y soportar la presi6a por cargas de viento en los paneles. 2. Mantenga dexedw el riel de soporte y a nivel. Marque una Linea con el cordel enthado alrededor de la casa pars guise el horde superior del riel de spoyo. 3. Mctodo c:orrecto pars clavar el rid de apoyo: Comience en la parte posterior de la casa. Coloque los clavos en e1 centro de. Is ranee, para clavos. Introduzca los clavos y deje una holgura de 1/16" dude la superftcie 61 del de apoyo. Nota: No clave muy ajustadarnente el riel. de apoyo. Una holgura de 11W' con la cabeza del claw perrtaitir6 el espacio Suliciente pats absorber, la expansi& y aoatracci6n normales resultantes de los cambios de tcmperatura. Coloque los clavos on ranums alternas. 4. Dqc un espacio de la' entre cada secci6n de riel de apoyo pars terser en cuenta la expansion termite normal. Pua instalar el producto alrededor de las esquinas, consulte cl piso i . STEP Be MOUNT BOOM RML 1. Ground preparation. Prepare the ground so that it is smooth, free of loose clumps, clods or protruding obstacles. GuW against uneven settling of newly excavated ground by mounting the bottom rail on treated (2"x2") lumber. 2. Mark the ground location directly below the outside, bottom edge of the home. Use a level or plumb bob to determine this location at each cornex 3. Snap a chalk line or stretch a nylon string between each Mmcr to guide the bottom rail. 4. Position the bottom rail with the back leg toward the inside of the chalk line perimeter. 5. Drive ground spikes every 19 inches. Two sets ofholw are provided in the bottom rail. They are located inside the channel, and on the back leg. Ground spikes may be driven in either hole at intervals of 19 inches. 6. installation on concrete. Use a 3/4" masonry hall. You may also drill a hole for a 3/16" molly screw and plastic sleeve. (Nail and screw Materials are available at Most hardware stores.) To install around comer, refer to Step E. PASO Y: MONTAJE DEL RIEL INFERIOR 1. Neparac'i6n del piso de tierra. Prepare el piso de mantra que est6 uniforme, sin rotas sueltas, torrones ni obstaculos que sobresalgan clef piso. Proteja la instalaci6n contra el asentamiento no uniforme enpisos reci6n excavados, montando el del itnfalor en una pieta de madera tratada (2" x 2'). 2. Marque la ubicaci6n en el piso directamentr abajo del bottle inferior externo de la casa. Use un nivel o una plowada pars detertnitiar esta ubicaddn en cada esquina. 3. Marque una linea con el cordel enf,zado o coloque una cuerds de a6n entrc cads esquina pare oar el reel de apoyo. 4. Coloque el riel de apoyo con la pata de respaldo hacia el interior del perirnetxo maicado put la lines de tiza. S. Zntroduzca los clavos gruesos en el piso a calla 19 pulgadw. En el 0E0-9 V000Jti000d L81-1 60LE-698-008-1 risk inferior se proporcionen dos conjuntos de agujeros. l stos se encuentran deotm del canal, en la pats. de soporte. Los clmvm gruesos para el piso se pueden clavar a traves de cudquicra de los agujeros a una distancia de 19 pulgadas entre si. 6. Irtstalacidn ea pesos de concreto. Use un claw de 3/4" para mamposterta. ,Asi mismo se puede taladrar un agujero Para un tomilio de 3/16" tipo Molly con ancla plistica. (Los materiales de elavos y los tomillos estan disponibles en la mayoria de las fetrctmfias}, Pam lnstalar el producto a(eededot de las esquinas, consulte el pAa E. STEP C: FMAL INSTALLAMN 1. Beginning 24'away front the lowest.coracr of the home, measure ;tout the ground up to 1-1/2" above the bottom edge of the back rail. (If the temperature is below 407, with frozen ground, measure to 3" above the back tad edge.) . 2 Measurements on doping ground should betaken every 16" (width of pand). .> 3. Cut the bottom of each panel to angle with the ground. Each cut panel section should align, 9(r to the bottom edge of the home. Use aviation snips or a power saw (with a fine toothed saw blade turned back,Wds) for Cutting. 4. Punch lock tabs every 4" alorig the top and bottom edge of cut panel sections (or outside portion; of each panel face for 13" VariBest). A, Malco (SL-8) Snap Lock Punch tool is recommended. Consult your skirting supplier for obtaining dais tool. Tabs are to be positioned outward to catch on the hooked edge of the rails. 5. Interlock panels and insert into the bottom rail. Begin with the first panel inserted into the bottom; tail, Lock tabs should snap past the hooked edge of the bottom rail. Insert next panel section into the interlock hooks along the vertical edge of the panels. Seat each panel securely into the bottom rail. Repeat interlocking panels, forming about a 12-foot section. Itesutne panel cut and interlocks method, To install around corner, refer to Step E. PASO Q wstiu- Aa6N DE LOS PANELES 1. Comwmdo a 2e de la esquim inferior mas baja de la can, muds desdtlasaperficie delpiso hasra 1112" arriba del horde iufexiordel rlel de apoyo. (Si la temperatura arnbiente durante la instakadbn es inferior a los 40T y el piso estd congelado, mida hasty 3" arriba del borde dd M de apoyo). 2. Las medidones en pism con desnivel deben, hacerse a cad& 16" (ancho del panel). 3. Corte is pate inferior de cada panel en angulo segn el desnivel del piso. Cada weidn do panel corWo debe estar a escusdra (9T) con el borde inferior de la case. Use tijeras de hojalatero o una stem elkctdca (con una hoja de torte de diente fino colocada ak reuse) Para cortar los panties. 4. Perfore In lengtietas de cierre coda 4" a to largo del borde superior e inferior de las secciones de paaeles cortados. Se recoxnieuda el use de una punzonadom de mama Malco (SL-8) Snap Lock Punch. Cousulte con su prumedor de cenefas sobxu cGmo obtenear esta herramienta. Las leng,etas deben zolocwu Wa of = a Fin de poder engattcbar el borde do ganebo de los rieles. FIDE COPY .rrn roan r Q11IT.111fIT1tILTIW-d,1nW4 79.0 U ,-1®—Z0 j. Engaache Ms panics c introdozesios en el rid inferior. Con ience con el primer panel introducido en el riel inferior. T..as leng,etas de dent deben enganchanc hasty mis alit del horde con gancho del riel de apoyo. Introduzca is siguiente saccidn de panel en los ganchos do enclavarniento a 10 largo del horde vertical de los pantiles. Asiente cads panel fmcments en el riel iofUIM lt*4 al cnciavarJtiento de los pantiles hasty forma una seccion �e apmdmadamente 12 pies. Reumde d torte de los pantiles y el merodo de enclavarrtlento. Para instalar d product+o en las esquinas, consulte el Paso E. STEP D: INTERLOCK. FRONT RAIL WITH BACK RAIL. 1. Stair snapping one end of the front top rail into the back top rail, creating the interlock. Push the front top rail upward, its entire length until the front top rail is completely imetloched with the back rail. 2. Overlap V each top rail see t. To road around comer, refer to Step E, PASO D: F.NCLAYAMIVM DEL MEL ' FROWAL CON EL MEL DE APOYO 1. cornience engaachwWo un era mo del riel frontal superior en d &I superior de apoyo, pate fortttar el mecanistno de enci vamiento. Ernpujs d rid superior de apoyo halo, arriba an soda su Ionotud haste clue el riel f ontsl superior este completarneute enganshado ea el del de apoyo. 2. Traslapo V cada semi6te del riel superior: Para lastdar el pr+oducto en, las empWas, consulte e1 paso E. A 'EP E: INSTALLATION CORNER INSTALL 1. Top back rail — Malta a 1" vertical slit $om the top. Top interlock hook should be complsttiY cut tbxaugh. Notch 45` on bottom curved 149 2. Bottom rail— Notch the back portion vitli snips, as illustrated. Bead around a corner and attach to the ground. I l?amels — Gott panel to proper height. Ntenotine point of corner bend; bead over a table edge, forming $ uniform angle. 4. Top fmat rail — yoteh at both the top and bottom books of the front rail, w illustrated, Bend around the coaster and -fit into the interlock with the top back rail. Rehr to Step D. FOUR pMNOFCHED TOP FRONT RAILS ARE INCLUDSO IN TRIM PAI.> PAEO ' DEL PRODU Ii►ISTALA p4 LAS ESQUINAS u Corte vertical de V desdr: 1. Intl superior de &pop — raga rt la paste superior. El gancho superior de eaclavamieato debC cottatse comtplttamegte, piaga una nmuesm a V ea is pant curvada inferior. 2. fuel inferior — Cone la poreibn pastcriox arnn them de hojahtero segirn se muestm en IQ AustraetBn. Dt'iWCIO alrededor de una esquivay clavelo ai piso. 3. Ptuteles — Corte el panel a 1% altars aproptada. Determine el punto de dobj= doble e1 panel sobrc el borde de una mesa, Para fotMar u» engulo recto. 4. Riel frontd superior — Corte los ganchos a el Ia�i�a rior del rid frontal, n ca �ustta ere la ftgur ; p skrededot de la e*na y eng>£achela ea e1 ettdavamieato con d rid superior de apoyo- Consulte d peso D. IN EL CONJUNTO TRIM PAK INCLUYEN CUATRO MOM SUPERIORES FRONTALLS YA CORTADOS. e2,,,a .T Wh(A(A 10MM(A J t or— T r FILE vop awTJ {3T;LMj .V-WpH3 E9:60 6T,-L0-10