HomeMy WebLinkAboutProduct Review; Premium Plus Skirting0l//2812014 ":Z= 1;w463 F1,004tDOIB
71
Solid', Pane .04011�:
�i Centir.-Ven Panel .04011`
• Top Front im .050
0 59,
.11:
• Top gack Tim
,059
i
0. Rnttoiv. Tdri .047
Ventilation: I
Center Vent 8.4 sq. in./ft. f panel
Available Colo s
White
Grey
Tan
Clay
Sand
V nfilation:
Cent Vent,4.9 sq. in./ft. of
panel
,ei
Vinyl Skirting M
A vai able Colo*,
§olid Panel 35
White
Grey
• Vented Panel -.3.35
II
'Front
Tan
TIP TOM p 350"
Clay
T 3p Back Trim. 348
Sand
•Boftom Trim j40`
Trim k1i Coparlsion:
PremIUM Plus Eagle
Fro Rail I
'050d NOTE: T�p Back trim fief
Top Back
Back ail
Bolto Charm
.05w
.04711
04W Premium P and Eagle
m P it's ar t
.04W Trim Kite.ar the Same
io
Top FroinfTrim, idth
4.725"
s
4 .360. dimsnsions
Upper Lag
.590,
.6501,
ft 4 HEAVIER;
The rei is6n ma Installers use Premium Plqs Trim Kitswitli Eagl9 Panel Is because
and, in areas where Now-wi is a- Problem, Premium Piuis offers more rigid protection ag n8t blow-out.
9w/Z0 39Vd
10d3a 3WOH 3-II80W
0849LSVE19
:r,Qp /1-0
S
STEP A:
ATTACH BACK RAIL
1. Determine a place for mounting. Place bottom edge of back rail
just below bottom edge of the home,, Taus location must offer solid
support for attaching and wind load pressure for pastels and rails.
2. Keep the back rail straight and level, Snap a chant be around the
home to guide the top edge of the back rail.
3. Correct screwing or nailing method for back rail: Start on the back
side of the home. Position screws or nails in the center of the slot.
Serewfn-A to allow for a clearance of 1116" from the bark rail
surface. Now. avoid tightly screwing or nailing back rail. A 1/16"
clearance allows for normal expansion and contraction with
temperature change. Place a screw or nail in every other slot.
4. Provide a 1/2" gap between each back rail section for normal
thermal expansion.
To install around comer, refer to Step E.
PASO A:
INSTALL EL RIEL DE APOYO
1. Aetermine un lugau pars el montaje. Coloque el horde inferior del
riel de apoyo justo abajo del horde inferior de 1a casa. Esta
ubicaci6n debe ofrecer un apoyo fame que perrnita rlavar Los rielcs
y soportar la presi6a por cargas de viento en los paneles.
2. Mantenga dexedw el riel de soporte y a nivel. Marque una Linea
con el cordel enthado alrededor de la casa pars guise el horde
superior del riel de spoyo.
3. Mctodo c:orrecto pars clavar el rid de apoyo: Comience en la parte
posterior de la casa. Coloque los clavos en e1 centro de. Is ranee,
para clavos. Introduzca los clavos y deje una holgura de 1/16" dude
la superftcie 61 del de apoyo. Nota: No clave muy ajustadarnente
el riel. de apoyo. Una holgura de 11W' con la cabeza del claw
perrtaitir6 el espacio Suliciente pats absorber, la expansi& y
aoatracci6n normales resultantes de los cambios de tcmperatura.
Coloque los clavos on ranums alternas.
4. Dqc un espacio de la' entre cada secci6n de riel de apoyo pars
terser en cuenta la expansion termite normal.
Pua instalar el producto alrededor de las esquinas, consulte cl piso i .
STEP Be
MOUNT BOOM RML
1. Ground preparation. Prepare the ground so that it is smooth, free
of loose clumps, clods or protruding obstacles. GuW against
uneven settling of newly excavated ground by mounting the
bottom rail on treated (2"x2") lumber.
2. Mark the ground location directly below the outside, bottom edge
of the home. Use a level or plumb bob to determine this location
at each cornex
3. Snap a chalk line or stretch a nylon string between each Mmcr to
guide the bottom rail.
4. Position the bottom rail with the back leg toward the inside of the
chalk line perimeter.
5. Drive ground spikes every 19 inches. Two sets ofholw are provided
in the bottom rail. They are located inside the channel, and on the
back leg. Ground spikes may be driven in either hole at intervals of
19 inches.
6. installation on concrete. Use a 3/4" masonry hall. You may also
drill a hole for a 3/16" molly screw and plastic sleeve. (Nail and
screw Materials are available at Most hardware stores.)
To install around comer, refer to Step E.
PASO Y:
MONTAJE DEL RIEL INFERIOR
1. Neparac'i6n del piso de tierra. Prepare el piso de mantra que est6
uniforme, sin rotas sueltas, torrones ni obstaculos que sobresalgan
clef piso. Proteja la instalaci6n contra el asentamiento no uniforme
enpisos reci6n excavados, montando el del itnfalor en una pieta de
madera tratada (2" x 2').
2. Marque la ubicaci6n en el piso directamentr abajo del bottle
inferior externo de la casa. Use un nivel o una plowada pars
detertnitiar esta ubicaddn en cada esquina.
3. Marque una linea con el cordel enf,zado o coloque una cuerds de
a6n entrc cads esquina pare oar el reel de apoyo.
4. Coloque el riel de apoyo con la pata de respaldo hacia el interior del
perirnetxo maicado put la lines de tiza.
S. Zntroduzca los clavos gruesos en el piso a calla 19 pulgadw. En el
0E0-9 V000Jti000d L81-1 60LE-698-008-1
risk inferior se proporcionen dos conjuntos de agujeros. l stos se
encuentran deotm del canal, en la pats. de soporte. Los clmvm
gruesos para el piso se pueden clavar a traves de cudquicra de los
agujeros a una distancia de 19 pulgadas entre si.
6. Irtstalacidn ea pesos de concreto. Use un claw de 3/4" para
mamposterta. ,Asi mismo se puede taladrar un agujero Para un
tomilio de 3/16" tipo Molly con ancla plistica. (Los materiales de
elavos y los tomillos estan disponibles en la mayoria de las
fetrctmfias},
Pam lnstalar el producto a(eededot de las esquinas, consulte el pAa E.
STEP C:
FMAL INSTALLAMN
1. Beginning 24'away front the lowest.coracr of the home, measure
;tout the ground up to 1-1/2" above the bottom edge of the back
rail. (If the temperature is below 407, with frozen ground, measure
to 3" above the back tad edge.) .
2 Measurements on doping ground should betaken every 16" (width
of pand). .>
3. Cut the bottom of each panel to angle with the ground. Each cut
panel section should align, 9(r to the bottom edge of the home. Use
aviation snips or a power saw (with a fine toothed saw blade turned
back,Wds) for Cutting.
4. Punch lock tabs every 4" alorig the top and bottom edge of cut
panel sections (or outside portion; of each panel face for 13"
VariBest). A, Malco (SL-8) Snap Lock Punch tool is
recommended. Consult your skirting supplier for obtaining dais
tool. Tabs are to be positioned outward to catch on the hooked
edge of the rails.
5. Interlock panels and insert into the bottom rail. Begin with the
first panel inserted into the bottom; tail, Lock tabs should snap past
the hooked edge of the bottom rail. Insert next panel section into
the interlock hooks along the vertical edge of the panels. Seat each
panel securely into the bottom rail. Repeat interlocking panels,
forming about a 12-foot section. Itesutne panel cut and interlocks
method,
To install around corner, refer to Step E.
PASO Q
wstiu- Aa6N DE LOS PANELES
1. Comwmdo a 2e de la esquim inferior mas baja de la can, muds
desdtlasaperficie delpiso hasra 1112" arriba del horde iufexiordel
rlel de apoyo. (Si la temperatura arnbiente durante la instakadbn es
inferior a los 40T y el piso estd congelado, mida hasty 3" arriba del
borde dd M de apoyo).
2. Las medidones en pism con desnivel deben, hacerse a cad& 16"
(ancho del panel).
3. Corte is pate inferior de cada panel en angulo segn el desnivel del
piso. Cada weidn do panel corWo debe estar a escusdra (9T) con
el borde inferior de la case. Use tijeras de hojalatero o una stem
elkctdca (con una hoja de torte de diente fino colocada ak reuse)
Para cortar los panties.
4. Perfore In lengtietas de cierre coda 4" a to largo del borde superior
e inferior de las secciones de paaeles cortados. Se recoxnieuda el use
de una punzonadom de mama Malco (SL-8) Snap Lock Punch.
Cousulte con su prumedor de cenefas sobxu cGmo obtenear esta
herramienta. Las leng,etas deben zolocwu Wa of = a Fin de
poder engattcbar el borde do ganebo de los rieles.
FIDE COPY
.rrn roan r Q11IT.111fIT1tILTIW-d,1nW4 79.0 U ,-1®—Z0
j. Engaache Ms panics c introdozesios en el rid inferior.
Con ience con el primer panel introducido en el riel
inferior. T..as leng,etas de dent deben enganchanc hasty
mis alit del horde con gancho del riel de apoyo. Introduzca
is siguiente saccidn de panel en los ganchos do
enclavarniento a 10 largo del horde vertical de los pantiles.
Asiente cads panel fmcments en el riel iofUIM lt*4 al
cnciavarJtiento de los pantiles hasty forma una seccion �e
apmdmadamente 12 pies. Reumde d torte de los pantiles y
el merodo de enclavarrtlento.
Para instalar d product+o en las esquinas, consulte el Paso E.
STEP D:
INTERLOCK. FRONT RAIL
WITH BACK RAIL.
1. Stair snapping one end of the front top rail into the back
top rail, creating the interlock. Push the front top rail
upward, its entire length until the front top rail is
completely imetloched with the back rail.
2. Overlap V each top rail see t.
To road around comer, refer to Step E,
PASO D:
F.NCLAYAMIVM DEL MEL '
FROWAL CON EL MEL DE APOYO
1. cornience engaachwWo un era mo del riel frontal superior
en d &I superior de apoyo, pate fortttar el mecanistno de
enci vamiento. Ernpujs d rid superior de apoyo halo,
arriba an soda su Ionotud haste clue el riel f ontsl superior
este completarneute enganshado ea el del de apoyo.
2. Traslapo V cada semi6te del riel superior:
Para lastdar el pr+oducto en, las empWas, consulte e1 paso E.
A
'EP E: INSTALLATION
CORNER INSTALL
1. Top back rail — Malta a 1" vertical slit $om the top. Top
interlock hook should be complsttiY cut tbxaugh. Notch
45` on bottom curved 149
2. Bottom rail— Notch the back portion vitli snips, as
illustrated. Bead around a corner and attach to the ground.
I l?amels — Gott panel to proper height. Ntenotine point of
corner bend; bead over a table edge, forming $ uniform
angle.
4. Top fmat rail — yoteh at both the top and bottom books of
the front rail, w illustrated, Bend around the coaster and -fit
into the interlock with the top back rail. Rehr to Step D.
FOUR pMNOFCHED TOP FRONT
RAILS ARE INCLUDSO IN TRIM PAI.>
PAEO ' DEL PRODU
Ii►ISTALA
p4 LAS ESQUINAS u Corte vertical de V desdr:
1. Intl superior de &pop — raga rt
la paste superior. El gancho superior de eaclavamieato debC
cottatse comtplttamegte, piaga una nmuesm a V ea is pant
curvada inferior.
2. fuel inferior — Cone la poreibn pastcriox arnn them de
hojahtero segirn se muestm en IQ AustraetBn. Dt'iWCIO
alrededor de una esquivay clavelo ai piso.
3. Ptuteles — Corte el panel a 1% altars aproptada. Determine el
punto de dobj= doble e1 panel sobrc el borde de una mesa,
Para fotMar u» engulo recto.
4. Riel frontd superior — Corte los ganchos a el Ia�i�a
rior
del rid frontal, n ca �ustta ere la ftgur ; p
skrededot de la e*na y eng>£achela ea e1 ettdavamieato
con d rid superior de apoyo-
Consulte d peso D.
IN EL CONJUNTO TRIM PAK
INCLUYEN CUATRO MOM
SUPERIORES FRONTALLS YA
CORTADOS.
e2,,,a .T Wh(A(A 10MM(A J t or— T
r
FILE vop
awTJ {3T;LMj .V-WpH3 E9:60 6T,-L0-10