Loading...
HomeMy WebLinkAboutcompaction test resubmitHeadquarters Mailing 11345 U.S. Highway 1 tl C- 1 t ENGINEERING PO Box 78-1377 Oando Sebastian, FL. 32958 � 17 LVL AND TESTING Phoae: 772589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineenng.net DATE TESTED: July 21, 2020 KSM JOB #: 203348-1d/MH/ct PERMIT #: 2005-0394 NUC # 630 CONTRACTOR: Wynne Development Nuc Model: MC-IDR-P JOB LOCATION: 14440 Dalia Avenue Nuc Serial #: 30630 Spanish Lakes Fairways Ft. Pierce, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. N.W. 0" - 12" 50 110.3 111.7 98.7% 2. N.E. 50 109.4 " 97.9% 3. Center 50 108.6 " 97.2% 4. S.W. 50 108.3 " 97.0% 5. S.E. 50 109.1 " 97.7% Soil Description: 113.0 1 1 1 1 1 1 Brown Sand with E E I I I I I I Shell Fragments I In Place Moisture: G 112.0 I — I — —I — — I I I I I 9'0% H I I I I I I T Proctor Optimum Moisture: 111.0 �•-1—•—1 —�— ••—•a—- 11.0% P I I I I I Proctor Max. Dry Density: P.C.F. C I I I I I I 111.7 110.0..—.�— .—�.—..�..—..�.. .1—..—. F @ Test Locations the Density & I I I I Penetrometer readings indicate the g D 109.0 I I I I I I Degree of Compaction Meets R Minimum Requirement Y I I I I I I for Staked Foundation 108.0 — I——1--..-4..--—••—•;—••—, R`\pRytlfl.4NPup mitted: 8 9 10 11 12 13 14 PE.DA ���.,� Digitally "GENS ti Moisture - % of Dry Weight mQ' �� F ''?� signed by Disclaimer: Contractor is responsible to maintain Na.81439 _ Bryan E the tested area in the condition that KSM = * 1 * �nngryan[.-1 PE FL 311s 0 1` M Dahlke completed the indicated passed compaction test. iA0 STATE OF •• ((��-"��",�..NR"�= KSM is not responsible if the tested area has been Date: '•F�ORIDp.•• �.� =w� altered from the approved inspected condition. `(���� 2020.07.22 r101VAI. ,`�� 13:33:25 Bryan i`ke, P.E. 04 00 V.P. of Engineering PE # 81439 7/22/2020 Email to: St Lucie Building Department Proudly Serving Florida since 1990