HomeMy WebLinkAboutDrainage ReportDRAINAGE REPORT.
For
United Pentecostal Fire
Ministries Trinity International
Church
In
St. Lucie County
Prepared for
=County,2Permitting
0
United Pentecostal Fire Ministries Trinity International, Inc.
6817 Heritage Drive
Port St. Lucie, Florida 34982
954-261-8765
Prepared By
Richard M. Ladyko, P.E.
Fla. Registration #34288
Ladyko Design Group, LLC
Engineers, Planners, Construction Managers
4400 Belle Grove Drive
Ft. Pierce, FL 34981
Phone: 772-530-8261
Certificate of Authorization #28610
January 2019
TABLE OF CONTENTS
Cover............................................................................................ Page 1
Table of Contents.............................................................................. Page 2
Drainage Summary.......................................................................
Section I
Drainage Calculations..................................................................
Section II
10 Year, 24 Hour Routing...........................................................
Section III
10 Year, 72 Hour Routing..........................................................
Section IV
25 Year, 72 hour Routing................................................................
Section
Applicable Codes the Design is Intended to Meet:
St. Lucie County Land Development Code.
South Florida Water Management District Water Quality and Quantity
Standards for Environmental Resource Permits (Volume IV).
Computer Programs used for -the specifications- and/or calculations:
S.F.W.M.D. Cascade.
Prepared by:
Z- 8- Zo/'9g
M: Lady , P: .
R
SECTION "I"
Drainage Summary
0
United Pentecostal Fire Ministries Trinity International Church
Midway Road Campus
Drainage SummM
The proposed development is located approx. 0.50 miles east of U.S. Highway #1 on the north side of
Midway Road in St. Lucie County, Florida. The intent is to develop a 0.92 acre site with a 3,931 s.f.
religious facility and 0.31 Acres of additional impervious surface. Water Quality and Storm
Attenuation will be provided by a dry detention system with overflow discharge to North St. Lucie
River Water Control District (N.S.L.R.W.C.D.) Canal #22.
Stormwater management will be provided by an on -site dry retention system -meeting all of the _
requirements of the St. Lucie County Land Development Code and the South Florida Water
Management District, Environmental Resource Permit Handbook Volume II. Road crown elevations
will based upon the stages produced by a 10 year, 1 day storm event and the Minimum Finished Floor
Elevation will be set above the 100 year, 3 day, 0 discharge stage. Discharge from the project to the
receiving canal will be based upon N.S.L.R.W.C.D. criteria of the volume of runoff of 2.0 inches per
acre in the 10 year, 3 day storm event.
m
SECTION "II"
Drainage Calculations
V
dyko
lslgn
roup, LLC
4400 BELLE GROVE DRIVE JOB
Fi. PIERCE, FL 34981
PHONE 772-530-8261
FAX: 772-464-1383 SHEET NO. OF
enginpod225@aol.com CALCULATED BY DATE 2-0JP
ENGINEERS, PLANNERS &c CONSTRUCTION MANAGERS
STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS AUTHORIZATION #25610
CHECKED BY
SCALE
DATE
�
■■■■N■■
■■■■■■■■■■■■■■■■■
■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■
.■■■■■,■■■■■....
■m■■■
MEN
MINE
■■■■■■■■■
MMMNM
Imomm■■■■■
MEN
■MEN
m■■■■■■■■■■■■■■■■■■■
MEN
MEN-
■■■■■■■
■■■
- -
�.
- -
y
---
m
--
-
-�■■■■
■■■■■■
■■■■■■■
■■■■■■
■�
MEN
�
■
■
■■
�—
m■m■■■■■■■■
•
■■
■
■■■mn■■
■■■
■■■
___■�.
dyko
4400 BELLE GROVE DRIVE
FI_. PIERCE, FL 34981
'
Varoup,
PHONE 772-530-8261
digit
FAX 772-464-1383
LLC
enginpod225@aoLcom
ENGINEERS, PLANNERS & CONSTRUCTION MANAGERS
STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS AUTHORIZAHONff=o
JOB (JW1rE.D P0VrEC_G %4 Z, 0-1012C,0
SHEET NO. OF
001
CALCULATED BY DATE ®� ,L%/
CHECKED BY DATE
SCALE
_ _
_--
--
_
_
-
■■■■
-
-
■■■■■■■
NEON
■
/
J
MIR
■■
■�■■■■■E■■E■■NE■NMEN
EEN
No
■■■■■E■■■■
ON
ME
■
�Zlir��yJ♦
i
-
No
MEN
.,
o
-
■E■■O■ENE
N■■E
■■■■
■NE■E■E■E■■ENE
■O
'
.�
O■E■■OE■ENON
■E■OEE■■■M■E
OOO■NOO■ENOMO■EE
■O■NEE■OONNENNNNENNENN■E■■■■E
MAIN
EMIMMMIM
NEEDINESS
KW
MEMO
M
SEEMS
NEE■E■E■EEE■E
■■E■EE■E■EN■
NEON
mmmm
MEN
NONONE
OO
,.
/
/
ON
d 75--1
rOAEEC
MEN
EE■EN
.
A■
o
rONO
■■■■ONEEOO
■
OON
■MEN
OO■■■■OO■OENOON■OO■O■■O■■E■E■
E■EENO■E■■EENO■E■■■E■■■E
MEN
NE
n■■■■■■■■■■■■■■■
■■■■■■■■■
OEM
E■■■
■E■■■■N■E■
EN
■ENO■■■■■■E■■■■O■E■■
dyko
"00 BELLE GROVE DRIVE
FT. PIERCE. FL 34981
PHONE 772-530-8261
es1Qn
-464.1383
FAX' MVaroup,
U
LLC
enginpod225CAaoLrnm
ENGINEERS, PLANNERS & CONSTRUCTION MANAGERS
SCALE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS AUTHORIZATION#I6610
SHEET NO. 3 Op
CALCULATED BY DATE to .ZOIf
CHECKED BY DATE
SCALE
MEMO
ME
M
mom
NONE
OMENMENEM
om
-
SOME
ME
mom
MEMO
E■
M�
��
_
1
,
MEMO
■
y
a -
to=M!
WE
OMENS
-
,
,Na
..
IOMn
MEN
Now
MnEM
a
-
mom
MOMMENRIE
'
■
J
i ,'
■�
MIME
■■■
■mm=N�SEE
MnEM
NONE
,�
:/
0
l�n
ENO
Mnn
-
�MEMEMEMEv
mom
IMMENSE
MEMEMEMEMEMEME
ONE
ME
ON
ME
ME
0
ME
mmEEMEMENE
n0�nn�m
M�nnn�
0
dyko
4400 BELLE GROVE DRIVE
Fr- PIERCE, FL- 34981
PHONE 772-530.8261
esig
464 1383
FAX 772-Varoup,
��
LLC
enginpod225@aoLmm
ENGINEERS, PIANNERS & CONSTRUCTION MANAGERS
STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEQLS AUTHORIZAPON #28WO
SHEET NO_ _
CALCULATED BY,
CHECKED BY_
SCALE
OF
DATE
cjRr�
PA
"ll,
K A.
OEM
■I
■��■�
MEN
ON
ME
■■ONEE■■ENENEME
■■EE■■EE■■■
NE■EE■EE■■■E■■
■■■■■■nlso
=
ME■NON■■■■■■■■
■■NNE■■■■■
a
■■
■■■■■■■■■■%-
■
NOON
■■NONE
■■■■■■■■■■■■E■■■■■■■■■■■■■■E■
■E■■
E■E■■■■■E■■■■■■■■■■■■■■■
E
■E■EE
'
y
■ENE■
■E■N■N
■E■NN
■
■
■E
NONE
E■■E■■■■■r�v
■
■NE■■■■■■■II/
E
NEEEEEEEE■NE
■■■■■■■■■■■■■
.m
=asON
v
1
NEE
■EN■■■■■■■
■E■E■E■E■EmEE
■EE■E■E■ENNNN■■■E
■■■■■■■■■
OEM■■■■■■■■■■
E■■NNE
INN
;
■NNN■■■
■■■■■■■■■■■■■■NNE
■N■■■■■NN■
ENENNENNE'
-.
ONE
NE■■NNNNN
-
-
■■■
MONSOON
-
■■■
■EEEEEEEE■�■
E■■■■■■■E■EEE■E=
-
�;E
d
■■ENE■
EE
■mom
m■nn■■EnEE■■■■■■■■■■
NNEN
■■
dyko
44M BELLE GROVE DRIVE
Fr. PIERCE, FL 34981
PHONE M-530-8261
b��
.sig
LLC
L-464-1383
oL
enginpod225@acom
FAX: 7TVairoup)
ENGINEERS, PLANNERS & CONSTRUCTION MANAGERS
STATE OF FLORIDA BOARD OF PROFFSSIOPAL ENGINEERS AUMORIZAMNB28610
SHEET NO. OF 2
CALCULATED By DATE ✓ .Z01
CHECKED BY
SCALE
DATE
NOON
■�/
■■
■En
MEN
ENN■WOMEN
E■■■■■■■OE■■■E■
MINE=
No
■■NONE
■■■■■�■■■■■■■■■■■■
■E■■■■E
I
ME
MEMO
■O■■E■E■
NONEO■■■E
mEE■■EOE
■■E■E■E■E■■E■■O■■■O
MINES
MEN
0
EE
EE
EEEEEmNEOEEEEME
EEENE
■ENE■
aNE■E
EEmENN■
MEN
ENGINE
v■■N■
EPEE
-
,
•
.MOMEMEMEME
En■nEEO
■ENE■EEEONEENEON
M
MEMO"
NNEN■EN
■
EE
■
■Ml
IMME
ME
IN
■EEnnEEE
..
O
_
■■■EEE
EEEEEEEE
NE■EE
4400 BEI T E GROVEDRLVE
Fr. PIERCE, FL 34981
Va,4y*o
PHONE: 772-530-8261
eSl Q j
roujp�, LLC
FAX 7T2-464-1383
enginPod225@aoLrnm
ENGINEERS, PLANNERS & CONSTRUCTION MANAGERS
STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS AUTHORIZATION#2W0
JOB
SHEET NO.— OF
CALCULATED BY DATE 20
CHECKED BY
SCALE
DATE
-
-_■■���i■i■■■i■■■■■0■■■■
■■r
ON
ON
■
ONNI
■■■
■■■m■■■■■■■
i■
SENSE
ONE
■
■■E,,■
■
No
■■■■■■■■■
■■■■■■■■EMINE
■■■■■■
■■■■■■■■r■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■
■■■
■■■■■■■■■■
■■■■■■■E
■
■■■
■,■
■■■■■■
■■■■■
■■■■
■■■®■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■ONE
■■■■■■■■■■■■■■■■■■■■■■
■■■MEN
■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■
MINE
■■■■■■
■■■
■■■■■
■■■■■■■■■■■■■■
■■
■■■■■■■■■
■■■■■■■■■■■■■■
■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■■■■■■■N■■■■■■■■■■■■■■■■■■■■
■■■
SOMEONE
■■■■■■■
■■■■■■■■■■■
OEM
■■■■■■■■
■■
■■■■■■
■■
■■■
SESSION!
nn■■■■■■■■■■■
n■
■■■■■
OEM
■■■■■■■
SOMEONE
MIN
■■■■■■
■■■■■■■■■OEM
■■■EM■■■■■■
■■■■
SECTION "III"
10 Year, 24 Hour Routing
Cascade 2001 Version 1.0
'File: 10YEAR, 1 DAY Date: March 15, 2017 Page 1
Project Name: United Pentecostal Church
Reviewer: R. Ladyko
Project Number: 17-010
Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr
Time Step: 0.2 hr, Iterations: 10
Basin 1: On -Site
Method: Santa Barbara Unit Hydrograph
Rainfall Distribution: SFOMD - 24 hr
Design Frequency: 10 year
1 Day Rainfall: 5.5 inches
Area: 0.92 acres
Ground Storage: 3.73 inches
Time of Concentration: 0.5 hours
Initial Stage: 15 ft NGVD
Stage
Storage
(ft NGVD)
(acre-ft)
15.00
0.00
15.50
0.01
16.00
0.02
16.50
0.03
17.00
0.04
17.50
0.11
18.00
0.27
18.50
0.53
19.00
0.89
19.50
1.32
20.00
1.74
Offsite Receiving Body: Offsite - Canal #22
Time
Stage
(hr)
(ft NGVD)
---------
---------
0.00
0.00
1000.00
0.00
Structure: 1
From Basin: On -Site
To Basin: Offsite - Canal #22
Structure Type: Gravity
Weir: Sharp Crested,
Crest Elev =
17.5 ft NGVD,
Length
= 3 ft
Bleeder: Circular, Invert Elev.=
15 ft NGVD,
Diameter =
0.25
ft
Default Coefs: Weir
Coef = 0.6,
Orifice Coef
= 0.6
Pipe: Diameter = 1.5
ft, Manning's
n = 0.024,
Length =
75 ft
US Invert Elev = 12
ft NGVD, DS
Invert Elev
= 12 ft NGVD, no flap
gate
Cumulative
Instant
Current
Cumulative
Head
Water
Tail Water
Time Rainfall
Runoff
Discharge
Discharge
Stage
• Stage
(hr) (in)
(cfs)
(cfs)
(acre-ft)
(ft
NGVD)
(ft NGVD)
0.00 0.00
0.00
0.00
0.00
15.00
0.00
1.00 0.05
0.00
0:00
0.00
15.00
0.00
2.00 0.11
0.00
0.00
0.00
15.00
0.00
3.00 0.18
0.00
0.00
0.00
15.00
0.00
4.00 0.25
0.00
0.00
0.00
15.00
0.00
5.00 0.34
0.00
0.00
0.00
15.00
0.00
6.00 0.46
0.00
0.00
0.00
15.00
0.00
7.00 0.59
0.00
0.00
0.00
15.00
0.00
8.00 0.75
0.00
0.00
0.00
15.00
0.00
9.00 0.94
0.01
0.00
0.00
15.02
0.00
10.00 1.17
0.03
0.01
0.00
15.08
0.00
11.00 1.48
0.07
0.05
0.00
15.18
0.00
12.00 3.61
1.29
0.27
0.01
16.43
0.00
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017 Page 2
Time
(hr)
Cumulative
Rainfall
(in)
Instant
Runoff
(cfs)
Current
Discharge
(cfs)
Cumulative
Discharge
(acre-ft)
Head Water
Stage
(ft NGVD)
Tail Water
Stage
(ft NGVD)
13.00
4.22
0.48
0.34
0.04
17.21
0.00
14.00
4.50
0.22
0.34
0.07
17.19
0.00
15.00
4.68
0.13
0.33
0.10
17.09
0.00
16.00
4.84
0.12
0.31
0.13
16.84
0.00
17.00
4.94
0.08
0.23
0.15
16.10
0.00
18.00
5.04
0.07
0.16
0.16
15.59
0.00
19.00
5.14
0.07
0.11
0.17
15.34
0.00
20.00
5.24
0.07
0.08
0.18
15.25
0.00
21.00
5.30
0.05
0.06
0.19
15.21
0.00
22.00
5.37
0.05
0.05
0.19
15.19
0.00
23.00
5.43
0.05
0.05
0.19
15.18
0.00
24.00
5.50
0.05
0.05
0.20
15.18
0.00
25.00
5.50
0.01
0.02
0.20
15.12
0.00
26.00
5.50
0.00
0.01
0.20
15.07
0.00
27.00
5.50
0.00
0.00
0.20
15.05
0.00
28.00
5.50
0.00
0.00
0.20
15.03
0.00
29.00
5.50
0.00
.0.00
0.20
15.03
0.00
30.00
5.50
0.00
0.00
0.20
15.02
0.00
31.00
5.50
0.00
0.00
0.20
15.02
0.00
32.00
5.50
0.00
0.00
0.20
15.62
0.00
33.00
5.50
0.00
0.00
0.20
15.02
0.00
34.00
5.50
0.00
0.00
0.20
15.01
0.00
35.00
5.50
0.00
0.00
0.20
15.01
0.00
36.00
5.50
0.00
0.00
0.20
15.01
0.00
37.00
5.50
0.00
0.00
0.20
15.01
0.00
38.00
5.50
0.00
0.00
0.20
15.01
0.00
39.00
5.50
0.00
0.00
0.20
15.01
0.00
40.00
5.50
0.00
0.00
0.20
15.01
0.00
41.00
5.50
0.00
0.00
0.20
15.01
0.00
42.00
5.50
0.00
0.00
0.20
15.01
0•.00
43.00
5.50
0.00
0.00
0.20
15.01
0.00
44.00
5.50
0.00
0.00
0.20
15.01
0.00
45.00
5.50
0.00
0.00
0.20
15.01
0.00
46.00
5.50
0.00
0.00
0.20
15.01
0.00
47.00
5.50
0.00
0.00
0.20
15.01
0.00
48.00
5.50
0.00
0.00
0.20
15.01
0.00
49.00
5.50
0.00
0.00
0.20
15.01
0.00
50.00
5.50
0.00
0.00
0.20
15.00
0.00
51.00
5.50
0.00
0.00
0.20
15.00
0.00
52.00
5.50
0.00
0.00
0.20
15.00
0.00
53.00
5.50
0.00
0.00
0.20
15.00
0.00
54.00
5.50
0.00
0.00
0.20
15.00
0.00
55.00
5.50
0.00
0.00
0.20
15.00
0.00
56.00
5.50
0.00
0.00
0.20
15.00
0.00
57.00
5.50
0.00
0.00
0.20
15.00
0.00
58.00
5.50
0.00
0.00
0.20
15.00
0.00
59.00
5.50
0.00
0.00
0.20
15.00
0.00
60.00
5.50
0.00
0.00
0.20
15.00
0.00
61.00
5.50
0.00
0.00
0.20
15.00
0.00
62.00
5.50
0.00
0.00
0.20
15.00
0.00
63.00
5.50
0.00
0.00
0.20
15.00
0.00
64.00
5.50
0.00
0.00
0.20
15.00
0.00
65.00
5.50
0.00
0.00
0.20
15.00
0.00
66.00
5.50
0.00
0.00
0.20
15.00
0.00
67.00
5.50
0.00
0.00
0.20
15.00
0.00
68.00
5.50
0.00
0.00
0.20
15.00
0.00
69.00
5.50
0.00
0.00
0.20
15.00
0.00
70.00
5.50
0.00
0.00
0.20
15.00
0.00
71.00
5.50
0.00
0.00
0.20
15.00
0.00
72.00
5.50
0.00
0.00
0.20
15.00
0.00
STRUCTURE MAXIMUM AND MINIMUM DISCHARGES
Struc Max (cfs) Time (hr) Min (cfs) Time (hr)
0.34 13.40 0.00 0.00
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017 Page 3
BASIN MAXIMUM AND MINIMUM STAGES
Basin Max (ft) Time (hr) Min (ft) Time (hr)
On -Site 17.22 13.40 15.00 0.00
BASIN WATER BUDGETS (all units in acre-ft)
Total Structure Structure Initial Final
Basin Runoff Inflow Outflow Storage Storage Residual
On -Site 0.20 0.00 0.20 0.00 0.00 0.00
SECTION "IV"
10 Year, 72 Hour Routing
Cascade 2001 Versiori.1.0
,File: 10YEAR, 1 DAY Date: March 15, 2017
Page 1
Project Name: United Pentecostal Church
Reviewer: R. Ladyko
Project Number: 17-010
Period Begin: Jan 01, 2000;0000 hr End: Jan 05, 2000;0000 hr Duration: 96 hr
Time Step: 0.2 hr, Iterations: 10
Basin 1: On -Site
Method: Santa Barbara Unit Hydrograph
Rainfall Distribution: SFWMD - 3day
Design Frequency: 10 year
3 Day Rainfall: 7.48 inches
Area: 0.92 acres
Ground Storage: 3.73 inches
Time of Concentration: 0.5 hours
Initial Stage: 15 ft NGVD
Stage
Storage
(ft. NGVD)
(acre-ft)
15.00
0.00
15.50
0.01
16.00
0.02
16.50
0.03
17.00
0.04
17.50
0.11
18.00
0.27
18.50
0.53
19.00
0.89
19.50
1:32
20.00
1.74
Offsite Receiving Body: NSLRWCD Canal #22
Time
Stage
(hr)
(ft NGVD)
---------
---------
0.00
9.00
1000.00
11.00
Structure: 1
From Basin: On -Site
To Basin: NSLRWCD Canal
#22
Structure Type: Gravity
Weir: Sharp Crested,
Crest Elev =
17.5 ft NGVD,
Length
= 0 ft
Bleeder: Circular, Invert Elev =
15 ft NGVD,
Diameter =
0.25 ft
Default Coefs: Weir
Coef = 0.6,
Orifice Coef
= 0.6
Pipe: Diameter = 1.5
ft, Manning's
n = 0.024,
Length =
55 ft
US Invert Elev = 12
ft NGVD, DS
Invert Elev
= 12 ft NGVD, no flap
gate
Cumulative
Instant
Current
Cumulative
Head Water
Tail Water
Time Rainfall
Runoff
Discharge
Discharge
Stage
Stage
(hr) (in)
(cfs)
(cfs)
(acre-ft)
(ft NGVD)
(ft NGVD)
-------------
0.00 0.00
---------
0.00
-
0.00
0.00
15.00
9.00
1.00 0.03
0.00
0.00
0.00
15.00
9.00
2.00 0.07
0.00
0.00
0.00
15.00
9.00
3.00 0.10
0.00
0.00
0.00
15.00
9.01
4.00 0.13
0.00
0.00
0.00
15.00
9.01
5.00 0.17
0.00
0.00
0.00
15.00
9.01
6.00 0.20
0.00
0.00
0.00
15.00
9.01
7.00 0.23
0.00
0.00
0.00
15.00
9.01
8.00 0.27
0.00
0.00
0.00
15.00
9.02
9.00 0.30
0.00
0.00
0.00
15.00
9.02
10.00 0.33
0.00
0.00
0.00
15.00
9.02
11.00 0.37
0.00
0.00
0.00
15.00
9.02
12.00 0.40
0.00
0.00
0.00
15.00
9.02
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017 Page 2
Time
(hr)
Cumulative
Rainfall
(in)
Instant
Runoff
(cfs)
Current
Discharge
(cfs)
Cumulative
Discharge
(acre-ft)
Head Water
Stage
(ft NGVD)
Tail Water
Stage
(ft NGVD)
13.00
0.44
0.00
0.00
0.00
15.00
9.03
14.00
0.47
0.00
0.00
0.00
15.00
9.03
15.00
0.50
0.00
0.00
0.00
15.00
9.03
16.00
0.54
0.00
0.00
0.00
15.00
9.03
17.00
0.57
0.00
0.00
0.00
15.00
9.03
18.00
0.60
0.00
0.00
0.00
15.00
9.04
19.00
0.64
0.00
0.00
0.00
15.00
9.04
20.00
0.67
0.00
0.00
0.00
15.00
9.04
21.00
0.70
0.00
0.00
0.00
15.00
9.04
22.00
0.74
0.00
0.00
0.00
15.00
9.04
23.00
0.77
0.00
0.00
0.00
15.00
9.05
24.00
0.80
0.00
0.00
0.00
15.00
9.05
25.00
0.85
0.00
0.00
0.00
15.01
9.05
26.00
0.90
0.00
0.00
0.00
15.02
9.05
27.00
0.95
0.00
0.00
0.00
15.03
9.05
28.00
1.00
0.01
0.00
0.00
15.04
9.06
29.00
1.05
0.01
0.00
0.00
15.05
9.06
30.00
1.10
0.01
0.01
0.00
15.05
9.06
31.00
1.15
0.01
0.01
0.00
15.06
9.06
32.00
1.19
0.01
0.01
0.00
15.07
9.06
33.00
1.24
0.01
0.01
0.00
15.07
9.07
34.00
1.29
0.01
0.01
0.00
15.07
9.07
35.00
1.34
0.01
0.01
0.00
15.08
9.07
36.00
1.39
0.01,
0.01
0.01
15.08
9.07
37.00
1.44
0.01
0.01
0.01
15.08
9.07
38.00
1.49
0.01
0.01
0.01
15.09
9.08
39.00
1.54
0.01
0.01
0.01
15.09
9.08
40.00
1.59
0.01
0.01
0.01
15.09
9.08
41.00
1.63
0.02
0.01
0.01
15.09
9.08
42.00
1.68
0.02
0.02
0.01
15.10
9.08
43.00
1.73
0.02
0.02
0.01
15.10
9.09
44.00
1.78
0.02
0.02
0.01
15.10
9.09
45.00
1.83
0.02
0.02
0.02
15.10
9.09
46.00
1.88
0.02
0.02
0.02
15.10
9.09
47.00
1.93
0.02
0.02
0.02
15.11
9.09
48.00
1.98
0.02
0.02
0.02
15.11
9.10
49.00
2.03
0.02
0.02
0.02
15.11
9.10
50.00
2.09
0.02
0.02
0.02
15.12
9.10
51.00
2.15
0.03
0.03
0.03
15.13
9.10
52.00
2.22
0.03
0.03
0.03
15.13
9.10
53.00
2.32
0.04
0_04
0.03
15.15
9.11
54.00
2.43
0.05
0.05
0.03
15.18
9.11
55.00
2.57
0.07
0.06
0.04
15.21
9.11
56.00
2.73
0.08
0.08
0.05
15.24
9.11
57.00
2.92
0.10
0.09
0.05
15.27
9.11
58.00
3.15
0.13
0.11
0.06
15.34
9.12
59.00
3.46
0.19
0.14
0.07
15.48
9.12
60.00
5.59
1.76
0.33
0.09
17.06
9.12
61.00
6.20
0.59
0.36
0.12
17.48
9.12
62.00
6.48
0.26
0.36
0.15
17.49
9.12
63.00
6.65
0.15
0.36
0.18
17.40
9.13
64.00
6.82
0.13
0.35
0.21
17.27
9.13
65.00
6.92
0.09
0.33
0.24
17.13
9.13
66.00
7.02
0.08
0.31
0.26
16.90
9.13
67.00
7.12
0.08
0.23
0.28
16.10
9.13
68.00
7.22
0.08
0.16
0.30
15.61
9.14
69.00
7.28
0.06
0.11
0.31
15.32
9.14
70.00
7.35
0.05
0.06
0.32
15.21
9.14
71.00
7.41
0.05
0.05
0.32
15.19
9.14
72.00
7.48
0.05
0.05
0.33
15.19
9.14
73.00
7.48
0.01
0.02
0.33
15.12
9.15
74.00
7.48
0.00
0.01
0.33
15.07
9.15
75.00
7.48
0.00
0.00
0.33
15.05
9.15
76.00
7.48
0.00
0.00
0.33
15.04
9.15
77.00
7.48
0.00
0.00
0.33
15.03
9.15
78.00
7.48
0.00
0.00
0.33
15.02
9.16
79.00
7.48
0.00
0.00
0.33
15.02
9.16
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017 Page 3
Cumulative
Instant
Current
Cumulative
Head Water
Tail Water
Time
Rainfall
Runoff
Discharge
Discharge
Stage
Stage
(hr)
(in)
(cfs)
(cfs)
(acre-ft)
(ft NGVD)
(ft NGVD)
80.00
7.48
0.00
0.00
0.33
15.02
9.16
81.00
7.48
0.00
0.00
0.33
15.02
9.16
82.00
7.48
0.00
0.00
0.33
15.01
9.16
83.00
7.48
0.00
0.00
0.33
15.01
9.17
84.00
7.48
0.00
0.00
0.33
15.01
9.17
85.00
7.48
0.00
0.00
0.33
15.01
9.17
86.00
7.48
0.00
0.00
0.33
15.01
9.17
87.00
7.48
0.00
0.00
0.33
15.01
9.17
88.00
7.48
0.00
0.00
0.33
15.01
9.18
89.00
7.48
0.00
0.00
0.33
15.01
9.18
90.00
7.48
0.00
0.00
0.33
15.01
9.18
91.00
7.48
0.00
0.00
0.33
15.01
9.18
92.00
7.48
0.00
0.00
0.33
15.01
9.18
93.00
7.48
0.00
0.00
0.33
15.01
9.19
94.00
7.48
0.00
0.00
0.33
15.01
9:19
95.00
7.48
0.00
0.00
0.33
15.01
9.19
96.00
7.48
0.00
0.00
0.33
15.01
9.19
STRUCTURE MAXIMUM AND MINIMUM DISCHARGES
Struc Max (cfs) Time (hr) Min (cfs) Time (hr)
1 0.36 61.60 0.00 0.00
BASIN MAXIMUM AND MINIMUM STAGES
Basin Max (ft) Time (hr) Min (ft) Time (hr)
On -Site 17.50 61.60 15.00 0.00
BASIN WATER BUDGETS (all units in acre-ft)
Total Structure Structure Initial Final
Basin Runoff Inflow Outflow Storage Storage Residual
On -Site 0.33 0.00 0.33 0.00 0.00 0.00
SECTION "V"
25 Year, 72 Hour Routing
Cascade 2001 Version 1.0
'File: 10YEAR, 1 DAY Date: March 15, 2017
Page 1
Project Name: United Pentecostal Church'
Reviewer: R. Ladyko
Project Number: 17-010
Period Begin: Jan 01, 2000;0000 hr End: Jan 16, 2000;0000 hr Duration: 360 hr
Time Step: 0.2 hr, Iterations: 10
Basin 1: On -Site
Method: Santa Barbara Unit Hydrograph
Rainfall Distribution: SFWMD - 3day
Design Frequency: 25 year
3 Day Rainfall: 10.911 inches
Area: 0.92 acres
Ground Storage: 3.73 inches
Time of Concentration: 0.5 hours
Initial Stage: 15 ft NGVD
Stage
Storage
(ft NGVD)
(acre-ft)
---------
---------
15.00
0.00
15.50
0.01
16.00
0.02
16.50
0.03
17.00
0.04
17.50
0.11
18.00
0.27
18.50
0.53
19.00
0.89
19.50
1.32
20.00
1.74
Offsite Receiving Body: NSLRWCD Canal #22
Time
Stage
(hr)
(ft NGVD)
---------
---------
0.00
9.00
1000.00,
11.00
Structure: 1
From Basin: On -Site
To Basin: NSLRWCD Canal
#22
Structure Type: Gravity
Weir: Sharp Crested,
Crest Elev
= 17.5 ft NGVD,
Length
= 0 ft
Bleeder: Circular, Invert Elev =
15 ft NGVD,
Diameter =
0.25
ft
Default Coefs: Weir
Coef = 0.6,
Orifice Coef
= 0.6
Pipe: Diameter = 1.5
ft, Manning's
n = 0.024,
Length =
55 ft
US Invert Elev = 12
ft NGVD, DS
Invert Elev
= 12 ft NGVD, no flap
gate
Cumulative
Instant
Current
Cumulative
Head
Water
Tail Water
Time Rainfall
Runoff
Discharge
Discharge
Stage
Stage
(hr) (in)
(cfs)
(cfs)
(acre-ft)
(ft
NGVD)
(ft NGVD)
0.00 0.00
0.00
0.00
0.00
15.00
9.00
1.00 0.05
0.00
0.00
0.00
15.00
9.00
2.00 0.10
0.00
0.00
0.00
15.00
9.00
3.00 0.15
0.00
0.00
0.00
15.00
9.01
4.00 0.20
0.00
0.00
0.00
15.00
9.01
5.00 0.24
0.00
0.00
0.00
15.00
9.01
6.00 0.29
0.00
0.00
0.00
15.00
9.01
7.00 0.34
0.00
0.00
0.00
15.00
9.01
8.00 0.39
0.00
0.00
0.00
15.00
9.02
9.00 0.44
0.00
0.00
0.00
15.00
9.02
10.00 0.49
0.00
0.00
0.00
15.00
9.02
11.00 0.54
0.00
0.00
0.00
15.00
9.02
12.00 0.59
0.00
0.00
0.00
15.00
9.02
Cascade 2001 Version 1.0
'File: 10YEAR, 1 DAY Date: March 15, 2017 Page 2
Time
(hr)
Cumulative
Rainfall
(in)
Instant
Runoff
(cfs)
Current
Discharge
(cfs)
Cumulative
Discharge
(acre-ft)
Head Water
Stage
(£t NGVD)
Tail Water
Stage
(ft NGVD)
13.00
0.63
0.00
0.00
0.00
15.00
9.03
14.00
0.68
0.00
0.00
0.00
15.00
9.03
15.00
0.73
0.00
0.00
0.00
15.00
9.03
16.00
0.78
0.00
0.00
0.00
15.00
9.03
17.00
0.83
0.00
0.00
0.00
15.00
9.03
18.00
0.88
0.00
0.00
0.00
15.01
9.04
19.00
0.93
0.00
0.00
0.00
15.02
9.04
20.00
0.98
0.00
0.00
0.00
15.03
9.04
21.00
1.03
0.01
0.00
0.00
15.04
9.04
22.00
1.07
0.01
0.00
0.00
15.05
9.04
23.00
1.12
0.01
0.01
0.00
15.06
9.05
24.00
1.17
0.01
0.01
0.00
15.06
9.05
25.00
1.24
0.01
0.01
0.00
15.08
9.05
26.00
1.31
0.02
0.01
0.00
15.09
9.05
27.00
1.39
0.02
0.02
0.00
15.10
9.05
28.00
1.46
0.02
0.02
0.01
15.10
9.06
29.00
1.53
0.02
0.02
0.01
15.11
9.06
30.00
1.60
0.02
0.02
0.01
15.11
9.06
31.00
1.67
0.02
0.02
0.01
15.12
9.06
32.00
1.74
0.02
0.02
0.01
15.12
9.06
33.00
1.81
0.03
0.02
0.01
15.12
9.07
34.00
1.88
0.03
0.03
0.02
15.13
9.07
35.00
1.96
0.03
0.03
0.02
15.13
9.07
36.00
2.03
0.03
0.03
0.02
15.13
9.07
37.00
2.10
0.03
0.03
0.02
15.14
9.07
38.00
2.17
0.03
0.03
0.03
15.14
9.08
39.00
2.24
0.03
0.03
0.03
15.14
9.08
40.00
2.31
0.03
0.03
0.03
15.14
9.08
41.00
2.38
0.03
0.03
0.03
15.14
9.08
42.00
2.45
0.03
0.03
0.04
15.15
9.08
43.00
2.53
0.04
0.03
0.04
15.15
9.09
44.00
2.60
0.04
0.04
0.04
15.15
9.09
45.00
2.67
0.04
0.04
0.05
15.15
9.09
46.00
2.74
0.04
0.04
0.05
15.15
9.09
47.00
2.81
0.04
0.04
0.05
15.16
9.09
48.00
2.88
0.04
0.04
0.06
15.16
9.10
49.00
2.96
0.04
0.04
0.06
15.17
9.10
50.00
3.04
0.05
0.04
0.06
15.17
9.10
51.00
3.14
0.05
0.05
0.07
15.19
9.10
52.00
3.24
0.06
0.06
0.07
15.20
9.10
53.00
3.38
0.08
0.07
0.08
15.23
9.11
54.00
3.55
0.10
0.09
0.08
15.28
9.11
55.00
3.75
0.13
0.11
0.09
15.34
9.11
56.00
3.98
0.15
0.13
0.10
15.42
9.11
57.00
4.26
0.18
0.15
0.11
15.53
9.11
58.00
4.59
0.23
0.18
0.13
15.71
9.12
59.00
5.04
0.33
0.22
0.14
16.01
9.12
60.00
8.15
2.88
0.35
0.17
17.37
9.12
61.00
9.04
0.94
0.39
0.20
17.79
9.12
62.00
9.45
0.41
0.39
0.23
17.85
9.12
63.00
9.71
0.24
0.39
0.26
17.83
9.13
64.00
9.95
0.21
0.39
0.30
17.78
9.13
65.00
10.09
0.13
0.38
0.33
17.72
9.13
66.00
10.24
0.12,
0.38
0.36
17.66
9.13
67.00
10.38
0.12
0.37
0.39
17.60
9.13
68.00
10.53
0.12
0.37
0.42
17.53
9.14
69.00
10.62
0.09
0.36
0.45
17.42
9.14
70.00
10.72
0.08
0.35
0.48
17.26
9.14
71.00
10.81
0.08
0.33
0.51
17.11
9.14
72.00
10.91
0.08
0.30
0.53
16.77
9.14
73.00
10.91
0.01
0.20
0.55
15.86
9.15
74.00
10.91
0.00
0.09
0.57
15.27
9.15
75.00
10.91
0.00
0.02
0.57
15.10
9.15
76.00
10.91
0.00
0.01
0.57
15.06
9.15
77.00
10.91
0.00
0.00
0.57
15.04
9.15
78.00
10.91
0.00
0.00,
0.57
15.03
9.16
79.00
10.91
0.00
0.00
0.57
15.03
9.16
Cascade 2001 Version 1.0
Tile: 10YEAR, 1 DAY Date: March 15, 2017
Page 3
Cumulative
Instant
Current
Cumulative
Head Water
Tail Water
Time
Rainfall
Runoff
Discharge
Discharge
Stage
Stage
(hr)
(in)
(cfs)
(cfs)
(acre-ft)
(ft NGVD)
(ft NGVD)
80.00
10.91
0.00
0.00
0.57
15.02
9.16
81.00
10.91
0.00
0.00
0.57
15.02
9.16
82.00
10.91
0.00
0.00
0.57
15.02
9.16
83.00
10.91
0.00
0.00
0.57
15.01
9.17
84.00
10.91
0.00
0.00
0.57
15.01
9.17
85.00
10.91
0.00
0.00
0.57
15.01
9.17
86.00
10.91
0.00
0.00
0.57
15.01
9.17
87.00
10.91
Q.00
0.00
0.57
15.01
9.17
88.00
10.91
0.00
0.00
0.57
15.01
9.18
89.00
10.91
0.00
0.00
0.57
15.01
9.18
90.00
10.91
0.00
0.00
0.57
15.01
9.18
91.00
10.91
0.00
0.00
0.57
15.01
9.18
92.00
10.91
0.00
0.00
0.57
15.01
9.18
93.00
10.91
0.00
0.00
0.57
15.01
9.19
94.00
10.91
0.00
0.00
0.57
15.01
9.19
95.00
10.91
0.00
0.00
0.57
15.01
9.19
96.00
10.91
0.00
0.00
0.57
15.01
9.19
97.00
10.91
0.00
0.00
0.57
15.01
9.19
98.00
10.91
0.00
0.00
0.57
15.01
9.20
99.00
10.91
0.00
0.00
0.57
15.01
9.20
100.00
10.91
0.00
0.00
0.57
15.00
9.20
101.00
10.91
0.00
0.00
0.57
15.00
9.20
102.00
10.91
0.00
0.00
0.57
15.00
9.20
103.00
10.91
0.00
0.00
0.57
15.00
9.21
104.00
10.91
0.00
0.00
0.57
15.00
9.21
105.00
10.91
0.00
0.00
0.57
15.00
9.21
106.00
10.91
0.00
0.00
0.57
15.00
9.21
107.00
10.91
0.00
0.00
0.57
15.00
9.21
108.00
10.91
0.00
0.00
0.57
15.00
9.22
109.00
10.91
0.00
0.00
0.57
15.00
9.22
110.00
10.91
0.00
0.00
0.57
15.00
9.22
111.00
10.91
0.00
0.00
0.57
15.00
9.22
112.00
10.91
0.00
0.00
0.57
15.00
9.22
113.00
10.91
0.00
0.00
0.57
15.00
9.23
114.00
10.91
0.00
0.00
0.57
15.00
9.23
115.00
10.91
0.00
0.00
0.57
15.00
9.23
116.00
10.91
0.00
0.00
0.57
15.00
9.23
117.00
10.91
0.00
0.00
0.57
15.00
9.23
118.00
10.91
0.00
0.00
0.57
15.00
9.24
119.00
10.91
0.00
0.00
0.57
15.00
9.24
120.00
10.91
0.00
0.00
0.57
15.00
9.24
121.00
10.91
0.00
0.00
0.57
15.00
9.24
122.00
10.91
0.00
0.00
0.57
15.00
9.24
123.00
10.91
0.00
0.00
0.57
15.00
9.25
124.00
10.91
0.00
0.00
0.57
15.00
9.25
125.00
10.91
0.00
0.00
0.57
15.00
9.25
126.00
10.91
0.00
0.00
0.57
15.00
9.25
127.00
10.91
0.00
0.00
0.57
15.00
9.25
128.00
10.91
0.00
0.00
0.57
15.00
9.26
129.00
10.91
0.00
0.00
0.57
15.00
9.26
130.00
10.91
0.00
0.00
0.57
15.00
9.26
131.00
10.91
0.00
0.00
0.57
15.00
9.26
132.00
10.91
0.00
0.00
0.57
15.00
9.26
133.00
10.91
0.00
0.00
0.57
15.00
9.27
134.00
10.91
0.00
0.00
0.57
15.00
9.27
135.00
10.91
0.00
0.00
0.57
15.00
9.27
136.00
10.91
0.00
0.00
0.57
15.00
9.27
137.00
10.91
0.00
0.00
0.57
15.00
9.27
138.00
10.91
0.00
0.00
0.57
15.00
9.28
139.00
10.91
0.00
0.00
0.57
15.00
9.28
140.00
10.91
0.00
0.00
0.57
15.00
9.28
141.00
10.91
0.00
0.00
0.57
15.00
9.28
142.00
10.91
0.00
0.00
0.57
15.00
9.28
143.00
10.91
0.00
0.00
0.57
15.00
9.29
144.00
10.91
0.00
0.00
0.57
15.00
9.29
145.00
10.91
0.00
0.00
0.57
15.00
9.29
146.00
10.91
0.00
0.00
0.57
15.00
9.29
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017 Page 4
Time
(hr)
Cumulative
Rainfall
(in)
Instant
Runoff
(cfs)
Current
Discharge
(cfs)
Cumulative
Discharge
(acre-ft)
Head Water
Stage
(ft NGVD)
Tail Water
Stage
(ft. NGVD)
147.00
10.91
0.00
0.00
0.57
15.00
9.29
148.00
10.91
0.00
0.00
0.57
15.00
9.30
149.00
10.91
0.00
0.00
0.57
15.00
9.30
150.00
10.91
0.00
0.00
0.57
15.00
9.30
151.00
10.91
0.00
0.00
0.57
15.00
9.30
152.00
10.91
0.00
0.00
0.57
15.00
9.30
153.00
10.91
0.00
0.00
0.57
15:00
9.31
154.00
10.91
0.00
0.00
0.57
15.00
9.31
155.00
10.91
0.00
0.00
0.57
15.00
9.31
156.00
10.91
0.00
0.00
0.57
15.00
9.31
157.00
10.91
0.00
0.00
0.57
15.00
9.31
158.00
10.91
0.00
0.00
0.57
15.00
9.32
159.00
10.91
0.00
0.00
0.57
15.00
9.32
160.00
10.91
0.00
0.00
0.57
15.00
9.32
161.00
10.91
0.00
0.00
0.57
15.00
9.32
162.00
10.91
0.00
0.00
0.57
15.00
9.32
163.00
10.91
0.00
0.00
0.57
15.00
9.33
164.00
10.91
0.00
0.00
0.57
15.00
9.33
165.00
10.91
0.00
0.00
0.57
15.00
9.33
166.00
10.91
0.00
0.00
0.57
15.00
9.33
167.00
10.91
0.00
0.00
0.57
15.00
9.33
168.00
10.91
0.00
0.00
0.57
15.00
9.34
169.00
10.91
0.00
0.00
0.57
15.00
9.34
170.00
10.91
0.00
0.00
0.57
15.00
9.34
171.00
10.91
0.00
0.00
0.57
15.00
9.34
172.00
10.91
0.00
0.00
0.57
15.00
9.34
173.00
10.91
0.00
0.00
0.57
15.00
9.35
174.00
10.91
0.00
0.00
0.57
15.00
9.35
175.00
10.91
0.00
0.00
0.57
15.00
9.35
176.00
10.91
0.00
0.00
0.57
15.00
9.35
177.00
10.91
0.00
0.00
0.57
15.00
9.35
178.00
10.91
0.00
0.00
0.57
15.00
9.36
179.00
10.91
0.00
0.00
0.57
15.00
9.36
180.00
10.91
0.00
0.00
0.57
15.00
9.36
181.00
10.91
0.00
0.00
0.57
15.00
9.36
182.00
10.91
0.00
0.00
0.57
15.00
9.36
183.00
10.91
0.00
0.00
0.57
15.00
9.37
184.00
10.91
0.00
0.00
0.57
15.00
9.37
185.00
10.91
0.00
0.00
0.57
15.00
9.37
186.00
10.91
0.00
0.00
0.57
15.00
9.37
187.00
10.91
0.00
0.00
0.57
15.00
9.37
188.00
10.91
0.00
0.00
0.57
15.00
9.38
189.00
10.91
0.00
0.00
0.57
15.00
9.38
190.00
10.91
0.00
0.00
0.57
15.00
9.38
191.00
10.91
0.00
0.00
0.57
15.00
9.38
192.00
10.91
0.00
0.00
0.57
15.00
9.38
193.00
10.91
0.00
0.00
0.57
15.00
9.39
194.00
10.91
0.00
0.00
0.57
15.00
9.39
195.00
10.91
0.00
0.00
0.57
15.00
9.39
196.00
10.91
0.00
0.00
0.57
15.00
9.39
197.00
10.91
0.00
0.00
0.57
15.00
9.39
198.00
10.91
0.00
0.00
0.57
15.00
9.40
199.00
10.91
0.00
0.00
0.57
15.00
9.40
200.00
10.91
0.00
0.00
0.57
15.00
9.40
201.00
10.91
0.00
0.00
0.57
15.00
9.40
202.00
10.91
0.00
0.00
0.57
15.00
9.40
203.00
10.91
0.00
0.00
0.57
15.00
9.41
204.00
10.91
0.00
0.00
0.57
15.00
9.41
205.00
10.91
0.00
0.00
0.57
15.00
9.41
206.00
10.91
0.00
0.00
0.57
15.00
9.41
207.00
10.91
0.00
0.00
0.57
15.00
9.41
208.00
10.91
0.00
0.00
0.57
15.00
9.42
209.00
10.91
0.00
0.00
0.57
15.00
9.42
210.00
10.91
0.00
0.00
0.57
15.00
9.42
211.00
10.91
0.00
0.00
0.57
15.00
9.42
212.00
10.91
0.00
0.00
0.57
15.00
9.42
213.00
10.91
0.00
0.00
0.57
15.00
9.43
Cascade 2001 Version 1.0
'File: 10YEAR, 1 DAY Date: March 15, 2017 Page 5
Time
(hr)
Cumulative
Rainfall
(in)
Instant
Runoff
(cfs)
Current
Discharge
(cfs)
Cumulative
Discharge
(acre-ft)
Head Water
Stage
(ft NGVD)
Tail Water
Stage
(ft NGVD)
214.00
10.91
0.00
0.00
0.57
15.00
9.43
215.00
10.91
0.00
0.00
0.57
15.00
9.43
216.00
10.91
0.00
0.00
0.57
15.00
9.43
217.00
10.91
0.00
0.00
0.57
15.00
9.43
218.00
10.91
0.00
0.00
0.57
15.00
9.44
219.00
10.91
0.00
0.00
0.57
15.00
9.44
220.00
10.91
0.00
0.00
0.57
15.00
9.44
221.00
10.91
0.00
0.00
0.57
15.00
9.44
222.00
10.91
0.00
0.00
0.57
15.00
9.44
223.00
10.91
0.00
0.00
0.57
15.00
9.45
224.00
10.91
0.00
0.00
0.57
15.00
9.45
225.00
10.91
0.00
0.00
0.57
15.00
9.45
226.00
10.91
0.00
0.00
0.57
15.00
9.45
227.00
10.91
0.00
0.00
0.57
15.00
9.45
228.00
10.91
0.00
0.00
0.57
15.00
9.46
229.00
10.91
0.00
0.00
0.57
15.00
9.46
230.00
10.91
0.00
0.00
0.57
15.00
9.46
231.00
10.91
0.00
0.00
0.57
15.00
9.46
232.00
10.91
0.00
0.00
0.57
15.00
9.46
233.00
10.91
0.00
0.00
0.57
15.00
9.47
234.00
10.91
0.00
0.00
0.57
15.00
9.47
235.00
10.91
0.00
0.00
0.57
15.00
9.47
236.00
10.91
0.00
0.00
0.57
15.00
9.47
237.00
10.91
0.00
0.00
0.57
15.00
9.47
238.00
10.91
0.00
0.00
0.57
15.00
9.48
239.00
10.91
0.00
0.00
0.57
15.00
9.48
240.00
10.91
0.00
0.00
0.57
15.00
9.48
241.00
10.91
0.00
0.00
0.57
15.00
9.48
242.00
.10.91
0.00
0.00
0.57
15.00
9.48
243.00
10.91
0.00
0.00
0.57
15.00
9.49
244.00
10.91
0.00
0.00
0.57
15.00
9.49
245.00
10.91
0.00
0.00
0.57
15.00
9.49
246.00
10.91
0.00
0.00
0.57
15.00
9.49
247.00
10.91
0.00
0.00
0.57
15.00
9.49
248.00
10.91
0.00
0.00
0.57
15.00
9.50
249.00
10.91
0.00
0.00
0.57
15.00
9.50
250.00
10.91
0.00
0.00
0.57
15.00
9.50
251.00
10.91
0.00
0.00
0.57
15.00
9.50
252.00
10.91
0.00
0.00
0.57
15.00
9.50
253.00
10.91
0.00
0.00
0.57
15.00
9.51
254.00
10.91
0.00
0.00
0.57
15.00
9.51
255.00
10.91
0.00
0.00
0.57
15.00
9.51
256.00
10.91
0.00
0.00
0.57
15.00
9.51
257.00
10.91
0.00
0.00
0.57
15.00
9.51
258.00
10.91
0.00
0.00
0.57
15.00
9.52
259.00
10.91
0.00
0.00
0.57
15.00
9.52
260.00
10.91
0.00
0.00
0.57
15.00
9.52
261.00
10.91
0.00
0.00
0.57
15.00
9.52
262.00
10.91
0.00
0.00
0.57
15.00
9.52
263.00
10.91
0.00
0.00
0.57
15.00
9.53
264.00
10.91
0.00
0.00
0.57
15.00
9.53
265.00
10.91
0.00
0.00
0.57
15.00
9.53
266.00
10.91
0.00
0.00
0.57
15.00
9.53
267.00
10.91
0.00
0.00
0.57
15.00
9.53
268.00
10.91
0.00
0.00
0.57
15.00
9.54
269.00
10.91
0.00
0.00
0.57
15.00
9.54
270.00
10.91
0.00
0.00
0.57
15.00
9.54
271.00
10.91
0.00
0.00
0.57
15.00
9.54
272.00
10.91
0.00
0.00
0.57
15.00
9.54
273.00
10.91
0.00
0.00
0.57
15.00
9.55
274.00
10.91
0.00
0.00
0.57
15.00
9.55
275.00
10.91
0.00
0.00
0.57
15.00
9.55
276.00
10.91
0.00
0.00
0.57
15.00
9.55
277.00
10.91
0.00
0.00
0.57
15.00
9.55
278.00
10.91
0.00
0.00
0.57
15.00
9.56
279.00
10.91
0.00
0.00
0.57
15.00
9.56
280.00
10.91
0.00
0.00
0.57
15.00
9.56
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017
Page 6
Cumulative
Instant
Current
Cumulative
Head Water
Tail Water
Time
Rainfall
Runoff
Discharge
Discharge
Stage
Stage
(hr)
(in)
(cfs)
(cfs)
(acre-ft)
(ft NGVD)
(ft NGVD)
281.00
10.91
0.00
0.00
0.57
15.00
9.56
282.00
10.91
0.00
0.00
0.57
15.00
9.56
283.00
10.91
0.00
0.00
0.57
15.00
9.57
284.00
10.91
0.00
0.00
0.57
15.00
9.57
285.00
10.91
0.00
0.00
0.57
15.00
9.57
286.00
10.91
0.00
0.00
0.57
15.00
9.57
287.00
10.91
0.00
0.00
0.57
15.00
9.57
288.00
10.91
0.00
0.00
0.57
15.00
9.58
289.00
10.91
0.00
0.00
0.57
15.00
9.58
290.00
10.91
0.00
0.00
0.57
15.00
9.58
291.00
10.91
0.00
0.00
0.57
15.00
9.58
292.00
10.91
0.00
0.00
0.57
15.00
9.58
293.00
10.91
0.00
0.00
0.57
15.00
9.59
294.00
10.91
0.00
0.00
0.57
15.00
9.59
295.00
10.91
0.00
0.00
0.57
15.00
9.59
296.00
10.91
0.00
0.00
0.57
15.00
9.59
297.00
10.91
0.00
0.00
0.57
15.00
9.59
298.00
10.91
0.00
0.00
0.57
15.00
9.60
299.00
10.91
0.00
0.00
0.57
15.00
9.60
300.00
10.91
0.00
0.00
0.57
15.00
9.60
301.00
10.91
0.00
0.00
0.57
15.00
9.60
302.00
10.91
0.00
0.00
0.57
15.00
9.60
303.00
10.91
0.00
0.00
0.57
15.00
9.61
304.00
10.91
0.00
0.00
0.57
15.00
9.61
305.00
10.91
0.00
0.00
0.57
15.00
9.61
306.00
10.91
0.00
0.00
0.57
15.00
9.61
307.00
10.91
0.00
0.00
0.57
15.00
9.61
308.00
10.91
0.00
0.00
0.57
15.00
9.62
309.00
10.91
0.00
0.00
0.57
-15.00
9.62
310.00
10.91
0.00
0.00
0.57
15.00
9.62
311.00
10.91
0.00
0.00
0.57
15.00
9.62
312.00
10.91
0.00
0.00
0.57
15.00
9.62
313.00
10.91
0.00
0.00
0.57
15.00
9.63
314.00
10.91
0.00
0.00
0.57
15.00
9.63
315.00
10.91
0.00
0.00
0.57
15.00
9.63
316.00
10.91
0.00
0.00
0.57
15.00
9.63
317.00
10.91
0.00
0.00
0.57
15.00
9.63
318.00
10.91
0.00
0.00
0.57
15.00
9.64
319.00
10.91
0.00
0.00
0.57
15.00
9.64
320.00
10.91
0.00
0.00
0.57
15.00
9.64
321.00
10.91
0.00
0.00
0.57
15.00
9.64
322.00
10.91
0.00
0.00
0.57
15.00
9.64
323.00
10.91
0.00
0.00
0.57
15.00
9.65
324.00
10.91
0.00
0.00
0.57
15.00
9.65
325.00
10.91
0.00
0.00
0.57
15.00
9.65
326.00
10.91
0.00
0.00
0.57
15.00
9.65
327.00
10.91
0.00
0.00
0.57
15.00
9.65
328.00
10.91
0.00
0.00
0.57
15.00
9.66
329.00
10.91
0.00
0.00
0.57
15.00
9.66
330.00
10.91
0.00
0.00
0.57
15.00
9.66
331.00
10.91
0.00
0.00
0.57
15.00
9.66
332.00
10.91
0.00
0.00
0.57
15.00
9.66
333.00
10.91
0.00
0.00
0.57
15.00
9.67
334.00
10.91
0.00
0.00
0.57
15.00
9.67
335.00
10.91
0.00
0.00
0.57
15.00
9.67
336.00
10.91
0.00
0.00
0.57
15.00
9.67
337.00
10.91
0.00
0.00
0.57
15.00
9.67
338.00
10.91
0.00
0.00
0.57
15.00
9.68
339.00
10.91
0.00
0.00
0.57
15.00
9.68
340.00
10.91
0.00
0.00
0.57
15.00
9.68
341.00
10.91
0.00
0.00
0.57
15.00
9.68
342.00
10.91
0.00
0.00
0.57
15.00
9'.68
343.00
10.91
0.00
0.00
0.57
15.00
9.69
344.00
10.91
0.00
0.00
0.57
15.00
9.69
345.00
10.91
0.00
0.00
0.57
15.00
9.69
346.00
10.91
0.00
0.00
0.57
15.00
9.69
347.00
10.91
0.00
0.00
0.57
15.00
9.69
Cascade 2001 Version 1.0
File: 10YEAR, 1 DAY Date: March 15, 2017 Page 7
Cumulative
Instant
Current
Cumulative
Head Water
Tail Water
Time
Rainfall
Runoff
Discharge
Discharge
Stage
Stage
(hr)
(in)
(cfs)
(cfs)
(acre-ft)
(ft NGVD)
(ft NGVD)
348.00
10.91
-----------------------------
0.00
0.00
0.57
15.00
------- _==
9.70
349.00
10.91
0.00
0.00
0.57
15.00
9.70
350.00
10.91
0.00
0.00
0.57
15.00
9.70
351.00
10.91
0.00
0.00
0.57
15.00
9.70
352.00
10.91
0.00
0.00
0.57
15.00
9.70
353.00
10.91
0.00
0.00
0.57
15.00
9.71
354.00
10.91
0.00
0.00
0.57
15.00
9.71
355.00
10.91
0.00
0.00
0.57
15.00
9.71
356.00
10.91
0.00
0.00
0.57
15.00
9.71
357.00
10.91
0.00
0.00
0.57
15.00
9.71
358.00
10.91
0.00
0.00
0.57
15.00
9.72
359.00
10.91
0.00
0.00
0.57
15.00
9.72
360.00
10.91
0.00
0.00
0.57
15.00
9.72
STRUCTURE MAXIMUM AND MINIMUM DISCHARGES
Struc Max (cfs) Time (hr) Min (cfs) Time (hr)
1 0.39 62.00 0.00 0.00
BASIN MAXIMUM AND MINIMUM STAGES
Basin Max (ft) Time (hr) Min (ft) Time (hr)
On -Site 17.85 62.00 15.00 0.00
BASIN WATER BUDGETS (all units in acre-ft)
Total
Structure
Structure
Initial
Final
Basin Runoff
Inflow
Outflow
Storage
Storage Residual
On -Site 0.57