Loading...
HomeMy WebLinkAboutProject InformationProject Summary Job: Wrightsoftc, Date: OCT 15, 2020 Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466.6799 Fax 772-466.6796 Email: QUICKCALCS@AOL.COM For: KEVIN AND TERRI MURPHY OAK DRIVE, PORT ST LUCIE, FL Notes: Design • • Weather: Fort Pierce, FL, US Winter Design Conditions Summer Design Conditions Outside db 42 OF Outside db 90 OF Inside db 70 OF Inside db 75 OF Design TD 28 OF Design TD 15 OF Daily range Relative humidity M 50 % Moisture difference 61 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 26150 Btuh Structure 24126 Btuh Ducts 8180 Btuh Ducts 11679 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh none (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 34330 Btuh Use manufacturer's data n Rate/swing multiplier 0.95 Infiltration Equipmenf sensible load 34014 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 3933 Btuh Ducts 3246 Btuh Central vent (0 cfm) 0 Btuh Heating Coolingg (none) Area ft 22 Equipment latent load 7180 Btuh Volume2(ft3) 222322 218442232 Air changes/hour 0.32 0.16 Equipment Total Load (Sen+Lat) 41194 Btuh Equiv. AVF (cfm) 117 58 Req. total capacity at 0.70 SHR 4.0 ton Heating Equipment Summary Cooling Equipment Summary Make Make Rheem Trade Trade RHEEM Model Cond RA1648AJ1NA AHRI ref Coil RH1T4821MTANJA AH R I ref 8080956 Efficiency 100 EFF Efficiency 13.0 EER, 16 SEER Heating input 9.8 kW Sensible cooling 32550 Btuh Heating output 33374 Btuh Latent cooling 13950 Btuh Temperature rise 20 OF Total cooling 46500 Btuh Actual air flow 1550 cfm Actual air flow 1550 cfm Air flow factor 0.045 cfm/Btuh Air flow factor 0.043 cfm/Btuh Static pressure 1.00 in H2O Static pressure 1.00 in H2O Space thermostat Load sensible heat ratio 0.83 Calculations approved byACCA to meet all requirements of ManEtLE OPY -4- =rIghtsoft- 2020.Oct-15 10:38:17 •�°� I— Right -Suite® Universal 2019 19.0.08 RSU08101 Page 1 .4CCA ...Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Cale = MJ8 Front Door faces: E -- wrightsoft' Right-J® Worksheet Job: Entire House Date: OCT 15,2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466.6799 Fax 772-466.6796 Email: QUICKCALCS@AOL.COM 1 Room name Entire House MASTER BEDROOM 2 Exposed wall 212.0 It 43.0 ft 3 Room height 10.0 ft 10.3 ft heat/cool 4 Room dimensions 1.0 x 311.0 ft 5 Room area 2176.0 ft2 311.0 ft2 Ty Construction U value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross NIP/S Heat Cool 6 13A-5ocs 2 glazing, clr low-e 0.125 0.660 n n 3.50 18.48 1.91 15.14 584 8 556 0 1947 148 1064 121 '175 0 155 0 543 0 297 0 ---G �---G 2 glazing, clr low-e. 0.660 n, 18.48 15.14 20 0. 370 303 20 '- 0 370 303 13A-5ocs 0.125 a 3.50 1.91 254 160 560 306 0 0 0 0 11 2 glazing, clr low-e 0.660 a 18.48 33.92 16 0 296 543 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 25.54 54 0 998 1379 0 0 0 0 11 DO 0,390 a 10.92 10.34 24 24 262 248 0 0 0 0 Vjl 13A-5ocs 0.125 s 3.50 1.91 754 703 2461 1344 103 103 361 197 2 glazing, clr low-e 0.660 s. 18.48 15.14 12 24 222 182 .0 0 0 0 2 glazing, cir low e 0.660 s 18.48 15.14 9 - 18 ' 166 138 0 '. 0 - 0 0 L��-((C;; - 2 glazing, clr low-e 0.660 a 18.48 15.14 30 60 .554 454 . 0 0 0 0 Ut/ 13A-5ocs 0.125 w 3.50 1.91 484 292 1023 559 165 117 409 223 2 glazing, clr low-e 0.660 w 18.48 33.92 48 0 887 1628 48 0 887 1628 L� __G C 2 plazinq, clr low-e 16B-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 144 2176 0 2176 2661 1950 4885 3482 0 311 0 311 0 279 0 498 F 22A-toh 1.358 . - 38.02 0.00 2176 212 8061 0 311 43 1635 0 6 c) AED excursion 1631 436 Envelope loss/gain 22565 18266 4482 3581 12 a) Infiltration 3585 960 765 205 b) Room ventilation 1 0 0 01 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 4900 0 Subtotal (lines 6 to 13) 26150 24126 5247 3786 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 4 7 14 Subtotal 26150 24126 5251 3793 15 Duct loads 31% 48% 8180 11679 31% 48%1 1642 1836 Total room load 34330 35805 6893 5628 Air required (cfm) 1550 1550 311 244 Calculations aooroved bvACCA to meet all reauirements of Manual J Sth Ed. wrightsoft AC2020.Oct-1510:38:17 CP� ""°" " """" Rlght•Suite® Universal 2018 18.0.08 RSU08101 Page 1 ...\Wrlghtsoft HVACIMURPHY REVISION 10 15 20.rup Cale = MJ8 Front Door faces: E -- wrightsoft- Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466.6796 Email: QUICKCALCS@AOL.COM 1 Room name M BATH M TOILr 2 Exposed wall 6.0 It 4.0 It 3 Room height 9.3 ft heat/cool 9.3 ft heat/cool 4 5 Room dimensions Roam area 1.0 x 102.0 It 102.0 ft2 4.0 x 7.0 ft 28.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V��I---G 13A5ocs. 2 glazing, cir low-e 2 glazing, cir low-e 0.126 0.660 0.666 n n n .3.50 18.48 18.48 1.91 15.14 15.14 56 -8 0 48 .. - 0 0 167 148 0 91 121 - 0 37 - 0 0 37 0 0 130 0 0 71 0 0 ' G 11 VVVVV����� 13A-5ocs 2 glazing, cir low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazing, cir low-e 0.660 a 18.48 25.54 0 0 0 0 0 0 0 0 11D0 13A-5ocs 0.390 0.125 a s 10.92 -9.50 10.34 1.91 0 .0 0 0 0 0,. 0 0 0 0.: 0 0 0 0 0 0 2 glazing, cir low-e 0.660 s- 18.48 16.14 0 0,_ 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 15.14 0 0 0 0 0 0 0 0 2 glazing, clr low-e. 13A-5ocs 2 glazing, ctr low-e 0.660 0.125 0.660 & w w 18.48 3.50 18.48 15.14 1.91 33.92 0 0 0 0. 0 0 0 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Vf/ II--G 2 glazinq, cir low-e 11613-30md 0.660 0.032 w - 18.48 0.90 - 33.92 1.60 0 102 0 102 0 91 0 163 0 28 0 28 0 25 0 46' C F 22A-tph 1.358 - 38.02 0.00 102 6 228 0 28 4 152 0 6 c) AED excursion -47 -33 Envelope losstgain 635 328 307 83 12 a) Infiltration 96 26 64 17 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 500 500 Subtotal (lines 6 to 13) 731 854 372 600 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 8 13 0 0 14 Subtotal 739 867 372 600 15 Duct loads 31% 48% 231 420 31% 48% 116 290 Total room load 970 1287 488 890 Air required (ofm) 44 56 22 39 Calculations aDmoved bvACCA to meet all requirements of Manual J 8th Ed. -Fk" w�i�ghtsvft 2020.Oct-1510:38:17 ,ZC5%, Right-Suiteg Universal 2019 19.0.08 RSU08101 Page 2 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Calc = MJ8 Front Door faces: E -+ wrightsoft• Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466.6796 Email: QUICKCALCS@AOL.COM 1 Room name M W IC 2 POWDER RM 2 Exposed well 0 ft - 0 It 3 Room height 9.3 ft heat/cool 9.3 ft heat/cool 4 5 Room dimensions Room area 9.0 x 5.0 It 45.0 ft2 4.0 x 8.0 ft 32.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Stuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13A-5ocs 0.125 n" 3.50 1.91 . 0 0 0 0 0 0 0 0 Tj 2 glazing, cirlow-e 2 glazing, clr low-e 0.660 0.660 n n 18.48 18.48 15.14 15.14 0 0 0 0 0 '0 0 0 0 0 0_ 0 0. 0 0 0 UUU���JJJ 11 13A-5ocs 2 glazing, clr low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazing, cir low-e 0.660 a 18.48 25.54 0 0 0 0 0 0 0 0 11D0 13A-5ocs 0.390 0.125 a 6 10.92 3.50 10.34 1.91 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 15.14 0 0 0 0 0- 0 0 0 2 glazing; cir low-e . , 0.660 s 16.48 15.14 0 0 0 -'0 0 0• 0 0 2 glazing, clriow e' 13A-5ocs 2 glazing, clr low-e 0.660 0.125 0.660 s w w 18.48 3.50 18.48 15.14 1.91 33.92 0 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I�----G 2 plazinq, cir low-e 11613-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 0 45 0. .45 0 40 0 72 0 32 0 32 0 29 0 51 C F 22A-tph 1.358 - 38.02 0.00 45 0 0 0 32 0 0 0 6 c) AED excursion -4 .29 Envelope loss/gain 40 68 29 22 12 a) Infiltration 0 0 0 0 b) Room ventilation 0 0 0 0 '13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 500 Subtotal (lines 6 to 13) 40 68 29 522 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 6 11 8 13 14 Subtotal 47 79 36 535 15 Duct loads 31% 48% 15 38 31% 48% 11 259 Total room load 61 117 48 794 Air required (cfm) 31 5 2 34 Calculations approved bvACCA to meet all reauirements of Manual J 8th Ed. -FP- 2020-Oct-15 10:38:17 Right -Suite® Universal 2019 19.0.08 RSUD8101ACCA Page 3 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20,rup Caic = MJ8 Front Door faces: E -�- wrightsoft' Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name M HALL FOYER 2 Exposed well 0 ft 8.0 ft 3 Room height 9.3 ft heat/cool 12.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x 47.0 ft 47.0 ft2 1.0 x 164.0 ft 164.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Stuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 G 13A-5= 2 glazing,'clr low-e 0.125 0.660 n n 3.50 18.48 -1.91 15.14 0 0 ' - 0 0 - 0. 0 .. 0 0 '0 0 0 0 0 0 0 0 -- L-=G- 2 glazing; cir low-e 0.660 n 18.48 15.14 0 0 '0 :. 0 10 0 - 0 0 11 13A-5ocs 2 glazing, cir low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 96 16 56 0 196 296 107 543 2 glazing, cir low-e 11 DO 2g 5oes 0.660 0.390 0.660 a a s 18.48 10.92 3.48 25.54 10.34 1.14 0 0 0 0 0 0 0 0 0 0 0 0 0 24 0 0 24 0 0 262 0 0 248 0 V+1 2 glazing, clr low;e 2 glazing, cir low-e 0.660 0.660 . s 6 18.48 18.48 15.14 15:14 0 0 0 0 0 0- 0 0 0 0 0 0 0 0 0 0 2,glazing, cir low=e 13A-5ocs 2 glazing, clr low-e 0:660 0.125 0.660 s- w w 18,48 3.50 18.48 15.14 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 yJ I��-(; 2 glazinq, cir low-e 1613-30md 0.660 0.032 w - 18.48 -0.90 33.92 1.60 0 47 0 47 0 42 0 75 0 164. 0 164 0 147 0 262 C F 22A-tph 1.358 - 38.02 0.00 47 0 0 0 164 8 304 0 6 c) AED excursion -4 -50 Envelope loss/gain 42 71 1205 1110 12 a) Infiltration 0 0 166 44 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 200 Subtotal (lines 6 to 13) 42 71 1371 1355 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution -42 -71 147 60 14 Subtotal 0 0 1518 1415 15 Duct loads 31% 48% 0 0 31% 48% 475 685 Total room load Air required (cfm) 0 0 0 0 1992 90 2100 91 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. _ wrigF�tsoit� ACCA Right•Suite® Universal 2019 19.0.08 ASU08101 2020-Oct-1510:38:17 Page 4 ...\Wrightsoft HVACWURPHY REVISION 10 15 20.rup Cale = M,18 Front Door faces: E -�- wr"rghtsoft' Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772.466-6799 Fax 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name WIC 2 HALLWAY 2 Fposed wall 0 ft 6.0 ft 3 Room height 9.3 ft heat/cool 9.3 ft heat/cool 4 5 Room dimensions Room area 6.0 x 4.0 ft 24.0 ft2 13.0 x 4.0 ft 52.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13A-50cs 2 glazing, ciclow-e 2 glazing; clr low-e . 0.125 0.660 0.660 n n n 3.50 18.48 18.48 .. 1.91 15:14 . 15.14 0 0 -0 -0 0 0 0 •0 0 0 0 0, 56 0 . ' 0 56 0 0 195 0 0 107 0 0 I_C 11 13A-5ocs 2 glazing, clr low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazing, cir low-e 0.660 a 18.48 25.54 0 0 0 0 0 0 0 0 11 DO . 13A-5ocs 0.390 0.125 a s 10.92 3.50 10.34 1.91 0 0 0 0 0 0, 0 0 0 0_ 0 0 0 0 0 0 2glazing; cirlow-e- 0.660 s 18.48 15.14 0 0 0 '0 0 0 0 0 2 glazing; cir low-6, 0.660 s 18.48 15.14 0 0 0 0 0 0 0 0 2 glazing, cir low-e 13A-5ocs 2 glazing, cir low-e 0.660 0.125 0.660 s w w 18.48 3.50 18.48 15:14 1.91 33.92 - 0 0 0 0 0 0 .-0 0 0 0 0 0 .- 0 0 0 0 0 0 0 0 0 0 0 0 G I�---- 2 glazinq, clr low-e 1613-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 0 " 24 0 24 0 22 0 38 0 52 0 . , 52 0 47 0 83 C F 22A-tph 1.358 - 38.02 0.00 24 0 0 0 52 6 228 0 6 c) AED excursion -2 -11 Envelope loss/gain 22 36 470 179 12 a) Infiltration 0 0 96 26 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines a to 13) 22 35 555 204 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 82 32 -566 -204 14 Subtotal 104 68 0 0. 15 Ductloads 31% 48% 33 33 31% 48% 0 0 Total room load Air required (cfm) 136 6 101 4 1 1 0 0 0 0 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. -rk- 2020.Oct-15 10:38;17 Right-SuiteD Universal 2019 19.0.08 RSU08101 Page 6 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Cale = MJ8 Front Door faces: E - wrightsof - Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 QUICK CALCS, INC. By: 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax 772-466.6796 Email: QUICKCALCS@AOL,COM 1 Room name BEDROOM 3 CLST 3 2 E)posed wall 34.0 It 16.0 ft 3 Room height 9.3 It heat/cool 9.3 ft heat/cool 4 5 Room dimensions Room area 1.0 x 230.0 ft 230.0 ft2 14.0 x 2.0 ft 28.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13A-5ocs 2 glazing, clr low-e 2 glazing, clr low-e 0.125 0.660 0.660 n n n 3.50 18:48 18.48 . 1;91 15.14 15.14 ; 177 0 ` 0 177 0 0 - 618. 0 0 336 ' .. 0 0 0 01 0" 0 0 0 0 0 0 0 0 0 11 13A-5ocs 2 glazing, clr low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 140 0 86 0 299 0 164 0 19 0 19 0 65 0 36 0 2 glazing, clr low-e 11DO 13A-5ocs - 0.660 0.390 0.125 a a s 18.48 10.92 3.60 25.54 10.34 1.91 54 ,, 0 0 0 0 0 998 0 0 1379 0 0 0 0 130 0 0 130 0 0 456 0 0 249 2 glazing, olr low;e 2 glazing, clr low-e 0.660 0,660 . s ' s 18.48 18.48 15.14 15.14 0 . 0 .0 0 0 0 0 0 0 0 0 0 0 0_ 0 0 2 glazing, clr low-e 13A-5ocs 2 glazing, clr low-e 0,660 0.125 0.660 s: w w 18,48 3.50 18.48 15.14 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 yJ 2 glazinq, clr low-e 16B-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 0 , -230 0 .. , 230 0 M 0 368 0 28 0 28 0 25 0 45 C F 22A-tph 1.358 38.02 . 0.00 230 34 1293 0 28 16 608 0 6 c) AED excursion 89 -21 Envelope loss/gain 3415 2337 1154 308 12 a) Infiltration 546 146 257 69 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 39M 2483 1411 377 14 Less external load Less transfer Redistribution Subtotal 0 0 1316 5276 0 0 359 2843 0 0 -1411 0 0 0 -377 0 15 Duct loads 31% 48% 1650 1376 31% 48% 0 0 Total room load Air required (cfm) T7 6926 313 4219 183 0 0 0 0 Calculations armroved bvACCA to meet all requirements of Manual J 8th Ed. -PW wrightsolFtM 2020.Oct-1510:38:17 .4C A Right -Suite® Universal 2019 19,0,08 RSU09101 Page 6 \Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Calc = MJ8 Front Door faces: E - wrightsoft` Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name BATH 3 BATH 2 2 Exposed wall 5.0 ft 5.0 ft 3 Room height 9.3 ft heat/cool 9.3 ft heat/cool 4 5 Room dimensions Room area 5.0 x 13.0 ft 65.0 ft2 5.0 x 13.0 ft 65.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vl/ 13A.5ocs 2 glazing, cir low-e 2 glazing, cir low-e 0.125 0.660 .- 0.660 n n n 3.50 18.48 18.48 1.91 . 15.14 15.14 0 0 0 0 0 '. 0 0 0 0 0 0 .,• 0 0 0 0 0 0 0 0 0 0 0 0 0 I�---(C 11 yyyyyyJJJJJJ 13A-5ocs 2 glazing, cir low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazing, cir low-e 0.660 a 18.48 25.54 0 0 0 0 0 0 0 0 11 DO 13A-5ocs 0.390 0.125 a s 10.92 3.50 10.34 1.91 0 47 0 4.1 0 142 0 77 0 47 0 41 0 142 0 77 2 glazing, clr low-e 2 glazing; cir low-e. ` 0.660 0.660 s s 18.48 18.48 15.14 15.14 6 0 6 0 ,111 0 91 0 6 0 6 0 111 0 91 0 2 glazing, cir low-e 13A-5ocs 2 glazing, cir low-e 0.660 0.125 0.660 s w w 18.48 3.50 18.48 15.14 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 VI/ tl----(G; 2 giazinq, clr low-e 16&30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 0 65 0 65 0 58 0 104 0 65 0 65 0 58 0 104 .0 F 22A-tph 1.358 - 38.02 0.00 65 5 190 0 65 5 190 0 6 c) AED excursion .37 -37 Envelope loss/gain 501 236 501 236 12 a) Infiltration 80 22 80 22 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 400 400 Subtotal (lines 6 to 13) 581 657 581 657 Less external load 0 0 0 0 Less transfer 0 0 0 0 14 Redistribution Subtotal 176 758 47 704 101 682 36 694 15 Ductloads 31% 48% 237 341 31% 48% 213 336 Total room load Air required (cfm) 995 45 1045 45 896 40 1030 45 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -*- "' wrightsoTt^ 2020-Oct-1510:38:17 ACZ5K Right -Suite® Universal 2019 19.0.08 RSU08101 Page 7 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Cale = M,18 Front Door faces: E - Wrightsoft- Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 QUICK CALCS, INC. By: 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466.6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name BEDROOM 2 LINEN 2 Exposed wall 14.0 ft 0 ft 3 Room height 9.3 ft heat/cool 9.3 It heat/cool 4 Room dimensions 14.0 x 13.0 ft 2.0 x 3.0 ft 5 Room area 182.0 ft2 6.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13A-5ocs 0.125 n '3.50 1:91 0 0 0 0 0 0 0 0 2 glazing; clrlow=e 0.660 . n 18.48 .15.14 . 0 "" 0 0 0. 0 0 0 1G 2 glazing, cir low-e 0.660 n 18.48 15.14 0 0 0 6 6 0 0 0 yy!1 13A-5ocs 0.125 a 3.50 1.91 0 0 0 0 0 0 0 0 11 2 glazing, cir low-e 0.660 a 18.48 33.92 0 0 0 0 0 0 0 0 2 glazing, cir low-e 0.660 a 18.48 25.54 0 0 0 0 0 0 0 0 11 DO 13A--rocs 0.390 0.125 a s 10.92 3.50 10.34 1.91 0 130 0 100 0 351 0 192 0 0 0 0 0 0 0 0 2 glazing, clrlow-e 0.660 s 18.48 16.14 0 0 0 0 -0 0 0 0 2 glazing, cir low-e." 0.660 s 18.48 15.14 0 -0 0 0 0 0 0 0 2 glazing, clrlow-6 0.660 s • 18.48 " -15.14 30 30 554 454 0 0 0 0 V+! 13A-5ocs 2 glazing, cir low-e 0.125 0.660 w w 3.60 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -G 2 glazing, cir low-e 16B-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 0 182 0 182 0 163 0 291 0 6 0 6 0 5 0 10 C F 22A-tph 1.358 38.02 0.00 182 14 532 0 6 0 0 0 6 c) AED excursion -95 -1 Envelope loss/gain 1601 842 5 9 12 a) Infiltration 225 60 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 800 0 Subtotal (lines 6 to 13) 1825 1703 5 9 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 163 60 -5 -9 14 Subtotal 1988 1762 0 0 15 Duct loads 31% 48% 622 653 31% 48% 0 0 Total room load 2610 2615 0 0 Air required (cfm) 118 113 0 0 Calculations approved byACCA to meet all reauirements of Manual J 8th Ed. wrightsoft- 2020.Oct-1510:38:17 Right -Suite® Universal 2019 19.0.08 RSUD8101 Page 8 \Wrightsoft HVACIMURPHY REVISION 10 15 20.rup Calc = MJ8 Front Door faces: E - Wreghtsoft" Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466.6799 Fax: 772-466.6796 Email: QUICKCALCS@AOL.COM 1 Room name HALL LAUNDRYRM 2 Exposed wall 0 ft 6.0 ft 3 Room height 9.3 ft heat/cool 9.3 ft heat/cool 4 5 Room dimensions Room area 4.0 x 3.0 ft 12.0 ft2 6.0 x 12.0 ft 72.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Stuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross NIP/S Heat Cool 6 y/ 13A-5ocs 2 glazing; cir'low=e . 2 glazing, clr low=e 0.125 0.660 0.660 n "n n 3.50 - 18.48 18.48 : 1.91 15:14 15:14 0 0 0 0. 0 0 0 .0 0 '' 0 0 0 0- 0 0 0 0 0 0 0 0 0 0 0 11 13A-5ocs 2 glazing, clr low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazing, clr low-e 11 D0 13A-5ocs 0.660 0.390 0.125 a a s 18.48 10.92 3.50 25.54 10.34 1.91 0 0 0. 0 0 0 0 0 0 0 0 0 0 0 56 0 0 47 0 0 164 0 0 90 2 glazing, clr low-e 2 glazing, clr low-e 0.660 0.660 s s 18.48 18'48 15.14 15.14 0 0 0 0 0 0 0 0 0 9 0 9 0 166 0 136 V�! 2 glazing, clr low-e ' 13A-5ocs 2 glazing, clr low-e o.660 0.125 0.660 s w w 18.48 3.50 18.48 : 15.14 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazinq, clr low-e 1613-30md ' 0.660 0.032 w - 18.48 . 0.90 33.92 " 1.60 0 . 12 0 12 0, 11 0 19 0 72, 0 72 0 65 0 115 C F 22A-tph 1.358 - 38.02 0.00 12 0 0 0 72 6 228 0 6 c) AED excursion -1 -46 Envelope loss/gain 11 18 623 295 12 a) Infiltration 0 0 96 26 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 500 Subtotal (lines 6 to 13) 11 18 719 821 Less external load 0 0 0 0 14 Less transfer Redistribution Subtotal 0 -11 0 0 -18 0 0 5 725 0 9 830 15 Duct loads 31% 48% 0 0 31% 48% 227 402 Total room load Air required (cfm) 0 0 0 0 951 43 1232 53 Calculations aDDroved byACCA to meet all requirements of Manual J 8th Ed. _ -rp- 2020-Oct-1510:38:17 ACCA Right-Suite@)Universal 2019 19.0,08 RSU08101 Page 9 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Calc = MJ8 Front Door faces: E - - Wrightsoft' Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466.6799 Fax 772-466.6796 Email: QUICKCALCS@AOL.COM 1 Room name PANTRY KITCHEN/DINING 2 Exposed wall 4.0 ft 37.0 ft 3 Room height 9.3 ft heat/cool 9.3 ft heat/cool 4 5 Room dimensions Room area 4.0 x 5.0 ft 20.0 ft2 22.0 x 15.0 ft 330.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz°F) (Btu ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vy, �--C 13A-5ocs 2 glazing, clrlow a 2 glazing, clr low-e 0.125 0.660 0.660 n. ' 6 n• 3.50 18.48 18.48 1.91 1514 .15.14 0 -0 0 0 " 0 0 0 0 0 0 0 0 0 .0 0 0 0 0 0 0 0 0 . 0' 0 �G yy!! 11 13A-5ocs 2 glazing, clr low-e 0.125 0.660 a a 3.50 18.48 1.91 33.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 glazing, cir low-e 11 DO ._ 13A-5ocs 2 lazm , clrlow-e, 2 glazing, clr low-e 2.glazing, clrlow-e 13A-5ocs 2 glazing, clr low-e 0.660 0.390 0.125 0:660 0.660 0.660 0.125 0.660 a a " s s s s w w 18.48 10.92 3.50 18.48 18.48 18.48 3.50 18.48 25.54 10.34 1.91 15.14 - 16.14 15.14 1.91 33.92 0 0 37 0 0 0 0 0 0 0 37 0 0 6 0 0 0 0 180 0 0-. 0 0 0 0 0 71 0 0 .0. 0 0 0 0 205 0 0 0 140 0 0 0 205 0 0 0 68 0 0 0 716 0 0 0 236 0 0 0 391 0 0 0 129 0 Vtl �t--(G 2 alazinq, cir low-e 16B-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 0 20 0 20 0 18 0 32 72 330 0 336 1331 296 2442 528 C F 22A-tph 1.358 - 38.02 0.00 20 4 1M 0 330 37 1407 0 6 c) AED excursion -6 759 Envelope lossigain 300 97 3985 4250 12 a) Infiltration 64 17 594 159 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 600 Subtotal (lines 6 to 13) 364 114 4579 5009 Less external load 0 0 0 0 14 Less transfer Redistribution Subtotal 0 0 364 0 0 114 0 3 4582 0 5 5014 15 Duct loads 31% 48% 114 55 31% 48% 1433 2427 Total room load Air required (cfm) 478 221 169 71 1272 6016 7441 322 Calculations approved by ACCA to meet all requirements of Manual J Sth Ed. AC-Pi- 2020-Oct-15 10:38:17 CPk Right -Suite@ Universal 2019 19.0.08 RSU08101 Page 10 ...\Wrightsoft HVACWURPHY REVISION 10 15 20.rup Calc = MJ8 Front Door faces: E - - Wrightsoft` Right-J® Worksheet Job: Entire House Date: OCT 15, 2020 QUICK CALCS, INC. By: 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name LIVING ROOM M WIC 1 2 Fposedwall 15.0 ft 9.0 ft 3 Room height 12.0 it heat/cool 9.3 ft heat/cool 4 Room dimensions 1.0 x 316.0 ft 9.0 x 5.0 ft 5 Room area 316.0 ft2 45.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (W) Load number (Btuhlft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat I Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vµ 13A-5ocs . 2 glazing, clr low-e 0.125 '0.660 n n _ 3.50 18.48 .. 1:91 15; 14 . , b 0 0 0 - 0 0 0 0 84 -D 84 0 293 0' - 160. 0 L1- 2 glazing, clr low-e ..0.660 n 18.48 15.14 0 0. 0 0 0 0 0 0 V� 13A-50cs 0.125 a 3.50 1.91 0 0 0 0 0 0 0 0 11 2 glazing, cir low-e 0.660 a 18.48 33.92 0 0 0 0 0 0 0 0 2 glazing, cir low-e 0.660 a 18.48 25.54 0 0 0 0 0 0 0 0 11DO 13A-5ocs 0.390 0.125 a s 10.92 3.50 10,34 1.91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 VVV���lll 2 giazutg, cir low-e 0.660 s. 18.48 15.14 0 0 0 0 0 0 0 0 2 glazing; clr low-e 0:660 s 18.48 15.14 0.' 0' 0 0 0` 0 0 0 2 glazing, cl(low-e 0.660 s: 18.48 15.14 0 0 0 0 0 0 0 0 V)1 13A-5ocs 2 glazing, cir low-e 0.125 0.660 w w 3.50 18.48 1.91 33.92 180 0 108 0 378 0 207 0 0 0 0 0 0 0 0 0 I--�-G 2 glazinq, clr low-e 16B-30md 0.660 0.032 w - 18.48 0.90 33.92 1.60 72 316 0 - -316 1331 283 2442 506 0 45 0 - 45 0 40 0 72 C F 22A-tph 1.358 - 38.02 0.00 316 15 570 0 45 9 342 0 6 c) AED excursion 786 -14 Envelope loss/gain 2562 3940 675 218 12 a) Infiltration 311 83 144 39 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 1 500 1 0 Subtotal (lines 6 to 13) 2873 4524 020 257 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 16 28 0 0 14 Subtotal 2889 4551 820 257 15 Ductloads 31% 48% 904 2203 31% 48% 256 124 Total room load 3793 6755 7 1 1076 381 Air required (cfm) 171 292 49 16 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. -P- 2020-Oct-1510:38:17 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 11 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Cale = MJ8 Front Door faces: E . +'wrightsofr Duct System Summary Job: y y Date: OCT 15, 2020 Entire House By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax 772-466.6796 Email: OUICKCALCSCAOL.COM For: KEVIN AND TERRI MURPHY OAK DRIVE, PORT ST LUCIE, FL External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 1.00 in H2O 0 in H2O 1.00 in H2O 0.500 / 0.500 in H2O 1.000 1n/100ft 1550 cfm Cooling 1.00 in H2O 0 in H2O 1.00 in H2O 0.500 / 0.500 in H2O 1.000 in/100ft 1550 cfm 209 ft Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk BATH 2 c 1030 40 45 1.000 6.0 Ox 0 VI Fx 38.6 135.0 st3 BATH 3 C 1045 45 45 1.000 6.0 Ox 0 VI Fx 38.6 135.0 st3 BEDROOM 2 h 2610 118 113 1.000 7.0 Ox0 VIFx 23.4 115.0 sti BEDROOM 3 h 6926 313 183 1.000 8.0 Ox 0 VIFx 41.1 135.0 st3 FOYER C 2100 90 91 1.000 7.0 Ox0 VIFx 24.5 115.0 st1 KITCHEN/DINING C 3720 136 161 1.000 8.0 Ox0 VIFx 53.9 155.0 st5 KITCHENIDINING-A c 3720 136 161 1.000 8.0 Ox0 VIFx 47.3 155.0 st5 LAUNDRYRM c 1232 43 53 1.000 6.0 Ox0 VIFx 54.1 155.0 st5 LIVING ROOM c 3377 86 146 1.000 8.0 Ox0 VIFx 26.0 135.0 st4 LIVING ROOM -A c 3377 86 146 1.000 8.0 Ox 0 VIFx 27.9 135.0 st4 M BATH C 1287 44 56 1.000 6.0 Ox0 VIFx 13.4 115.0 st2 M TOILET c 890 22 39 1.000 5.0 Ox 0 VIFx 15.3 115.0 st2 M WIC 1 h 1076 49 16 1.000 4.0 Ox 0 VIFx 16.2 115.0 st2 MWIC 2 c 117 3 5 1.000 4.0 Ox0 VIFx 13.2 115.0 st2 MASTER BEDROOM h 3447 156 122 1.000 7.0 Ox0 VIFx 23.3 135.0 st4 MASTER BEDROOM -A h 3447 156 122 1.000 7.0 Ox 0 VIFx 29.6 135.0 st4 PANTRY h 478 22 7 1.000 4.0 Ox0 VIFx 52.9 155.0 st5 POWDER RM C 794 2 34 1.000 5.0 Ox0 VIFx 3.2 95.0 WIC h 136 6 4 1.000 4.0 Ox0 VIFx 24.4 115.0 sti -�- wrightsoft- v^•o Right -Suite® Universal 201919.0.08 RSU08101 ...\Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Calc = MJ8 Front Door faces: 2020.Oct-1610:38:23 Page 1 Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk st5 Peak AVF 336 383 1.000 702 10.0 0 x 0 VinlFlx st4 st3 Peak AVF 398 272 1.000 901 9.0 0 x 0 VinlFix st1 st1 Peak AVF 612 481 1.000 779 12.0 0 x 0 VinlFlx st4 Peak AVF 819 919 1.000 859 14.0 0 x 0 VinlFlx st2 st2 Peak AVF 936 1035 1.000 741 16.0 0 x 0 VinlFlx Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FIR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rb1 Ox0 1550 1550 0 0 0 0 Ox 0 VIFx wrightsoft°' 2020 Oct-1510;38;23 C� ok,�.•+ �_� Right -Suite® Universal 2019 19.0.08 RSU08101 Page 2 \Wrightsoft HVAC\MURPHY REVISION 10 15 20.rup Cale = MJ8 Front Door faces: E