Loading...
HomeMy WebLinkAboutCertificate of Termite TreatmentSt Lucie County InspecLlons 2300 Virginia Avenue Ft Pierce, FL- 34982 (772) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT # 06o V _ o Z o 7 JOB ADDRESS - ➢- O Z BUILDER C AUG 0 7 2006 PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE # JB 94495 We,, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 4Rz/ Percentage of solution: Date of treatment: 2"Footingy l� 1st Treatment Re -treat — 0Jiab -. �Kist Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other Chemicals used: �ru,'fal 7-6 Total gallons used: �2 Time of Treatment: 8=00 FBC104.2.6 Certificate of Protective Treatmentforprevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates. as.each required protective. treatment is . completed, providing a copy for the person the permit is issued to and another copy for -the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment .If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. , . ❑ 1st Treatment ❑ Re -treat El Perimeter for Final Inspection Signature of exterminator NOTE. - There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re4nspection fee charged. Revised 6/I3/02 dmg f