HomeMy WebLinkAboutReport of Foundation Pad CompactionA. M. ENGINEERING AND TESTING9 INC.
450 SOUTH OLD DIXIE HIGHWAY, SUITE 2
JUPITER, FLORIDA 33458
LOCAL OFFICE: (561) 745-1060 FAX: (561) 745-8880
REPORT OF FOUNDATION PAD COMPACTION
�l �f �W1C�5 ® COrnST �M.
Client: R K—-Gentraetmg
Site: Bridleww ®dWay
St. Lucie County, Florida
Foundation Pad
Report Date: 5/15/06
Project.No:
Report No: 9286
Permit No:
Density tests and Hand Cone Penetrometer'(HCP) readings were made at a minimum of three locations in
the building pad. Density tests were performed in the upper one foot of fill. HCP readings were taken in
hand auger boreholes at one foot intervals from slab grade through the depth of fill. The density tests were
performed in general compliance with ASTM D 2922. The HCP test, in conjunction with information about
the soil type, is empirically correlated to the relative density of subsurface soils.
Density
Test No.
Date
Tested
Location
Elevation
(feet)
Dry Densi sf)
Percent
Compaction
In Place
Proctor
9286
5/11/06
SE Comer
0-1
108.1
112.0
96.5
Center
0-1
109.5
112.0
97.8
NW Corner
0-1
108.4
112.0
96.8
* All elevations are below slab grade.
The depth of the fill was approximately two feet. The fill should extend at least five feet beyond the
building perimeter. At the time of our testing no information was available regarding the foundation pad
setbacks.
In the locations and depths that were tested, the fill has been compacted to a minimum of 95 percent of the
modified Proctor maximum dry density (ASTM D 1557). No soil borings were performed below the
recently placed fill.
Distribution:
Client - 2
RECEIVED
JIJN 0 12006
BY:
P I � S"T E D
Submitted by:
. M. ENGINEERING AN6 TESTING, INC.
44
Rebecca ` r Asco_Ii; P.E.
Florida Registration No. 51863