Loading...
HomeMy WebLinkAboutReport of Foundation Pad CompactionA. M. ENGINEERING AND TESTING9 INC. 450 SOUTH OLD DIXIE HIGHWAY, SUITE 2 JUPITER, FLORIDA 33458 LOCAL OFFICE: (561) 745-1060 FAX: (561) 745-8880 REPORT OF FOUNDATION PAD COMPACTION �l �f �W1C�5 ® COrnST �M. Client: R K—-Gentraetmg Site: Bridleww ®dWay St. Lucie County, Florida Foundation Pad Report Date: 5/15/06 Project.No: Report No: 9286 Permit No: Density tests and Hand Cone Penetrometer'(HCP) readings were made at a minimum of three locations in the building pad. Density tests were performed in the upper one foot of fill. HCP readings were taken in hand auger boreholes at one foot intervals from slab grade through the depth of fill. The density tests were performed in general compliance with ASTM D 2922. The HCP test, in conjunction with information about the soil type, is empirically correlated to the relative density of subsurface soils. Density Test No. Date Tested Location Elevation (feet) Dry Densi sf) Percent Compaction In Place Proctor 9286 5/11/06 SE Comer 0-1 108.1 112.0 96.5 Center 0-1 109.5 112.0 97.8 NW Corner 0-1 108.4 112.0 96.8 * All elevations are below slab grade. The depth of the fill was approximately two feet. The fill should extend at least five feet beyond the building perimeter. At the time of our testing no information was available regarding the foundation pad setbacks. In the locations and depths that were tested, the fill has been compacted to a minimum of 95 percent of the modified Proctor maximum dry density (ASTM D 1557). No soil borings were performed below the recently placed fill. Distribution: Client - 2 RECEIVED JIJN 0 12006 BY: P I � S"T E D Submitted by: . M. ENGINEERING AN6 TESTING, INC. 44 Rebecca ` r Asco_Ii; P.E. Florida Registration No. 51863 \\ S: (Fort Pierce OJftceWeMppsUTTLE LOG BOOKWouse JobslMisc. House Jobs lSaint Lucie CounrylRK Contracting(.doc