Loading...
HomeMy WebLinkAboutTermite FinalPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: D(o 0-7 &f( JOB ADDRESS: 51 �a ce ooGl BUILDER/CONTRACTOR: y n CuS-1-0;IX orta.es PEST- CONTROL CONTRACTOR: EVIOT-A-BUG TERMIT a PEST CONTROL INC. PEST CONTROL LICENSE #: jBnsne 1 We, the undersigned, hereby certify that we have pretreated the above described construction subterranean termites in accordance with the standards of the National Pest Control Associatio L_� Aeaf DOMINION 2L �r a feet if area treated: 5,15 C) Chemicals used: Percentage of solution:.05"o Date of Treatment: I a Footing 1st Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Total gallons used: Time of Treatment: Slab 15t Treatment Re -Treat Pools 15t Treatment Re -Treat Perimeter for Final Ir SignatLke of .S Note: There must be a completed form for each required treatment or re -treatment and this form must 4e on the job site to be picked up by the inspector at time of each Inspection or the scheduled Inspection will fail and a r -/nspectior fee charged FBC104.2.6CertifcateofProtectiveTreatmentforpreventionoftermites. Aweather resistantjobsitepstingboard shall be provided to receive dupllcate Treatment Certificates as each required protective treatment is com leted, providing a copy for the person the permit Is Issued to and another copy for the bullding permit files. The Treatment Certificate shall provide the product used, Identity of the appllcator, time and date of the treatment, site / cation, area treated, chemical used, percent concentration and number of gallons used, to establish a verlfrable recor of protective treatment. If the soil chemical barrier method for termite prevention Is used, final exterior tie ment shall be completed prior to final bullding approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be pi ced on the electrical panel box cover, listing all the treatments and dates of applicationsm no.doe.4 vnenma