Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBuilding Plansby
-49-0.. 13'-0"
7
Project:
v D E N OVATI O N
480'-0"
FOR
347-0 -
CONTENDED BOATS
LEGEND
GENERAL CON5TRUCTION NOTES
FD
®
FLOOR DRAIN
o
_
FCO
A. ALL CODES HAVING JURISDICTION SHALL DE OBSERVED STRICTLY FOR THE
FLOOR CLEAN OUT
DEMOLITION WORK. INCLUDING ALL STATE, LOCAL, BUILDING AND FIRE CODES.
ZVTR
o
4"VENT THROUGH ROOF
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS OF THE BUILDING PRIOR
TO THE START OF DEMOLITION AND NOTIFY THE OWNER AND ARCHITECT OF ANY
DISCREPANCIES BEFORE STARTING WORK.
\ y.
C. THE ARCHITECT SHALL NOT BE HELD RESPON5I15LE FOR AND NOT HAVE CONTROL OR
\
CHARGE OF THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES AND THE SAFETY PRECAUTIONS IN CONNECTION WITH THE DEMOLITION
—
I \/
WORK.
/ \
D. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATE BRACING AND/OR SHORING OF
-
STRUCTURAL AND NON-5TRUCTURAL ITEMS DURING DEMOLITION.
-
-
E. CONTRACTOR SHALL PROTECT FROM DAMAGE, DURING CON5TRUCTION, ALL EXISTING
WALLS, FLOORING, CEILINGS. DOORS, 5TRUCTURE, ETC. THAT ARE NOT REMOVED OR
o
WAREHOUSE
-
-
,
RENOVATED.
o
-
•-
_.. -_—_
-. __-_
-
_ - -__-
-__--
- --- ---_-----------
-- ----- ___----..___
FCONTKACT-0R-r�HALL4NDICAT€ACCEPTANC€-OF-ALL-SURFACE5 TO RECEIVE NEW WORK
AFTER DEMOLITION OF EXISTING AND PRIOR TO PROCEEDING WITH WORK.
G.ALL EXISTING MATERIAL AND FINISHES TO REMAIN, THAT ARE DAMAGED AS A RESULT
OF THE DEMOLITION WORK, SHALL BE PATCHED, AND REPAIRED TO MATCH EXI5TING
FINISHES OR THOSE AS SPECIFIED BY THE OWNER.
-
H. CONTRACTOR SHALL COORDINATE RECEIVING AND STAGING AREAS WITH THE OWNER
_
ALONG WITH THE PATH OF TRAVEL BEING USED TO BRING IN MATERIALS AND
_
EQUIPMENT FOR THE DEMOLITION AREA.
x
2
4
T
1
I I I I
I I
I
I I l ,I
I I
I
I
___,
SHOP I
I
i\ ✓\
I ��
��
i� I
��
��
�� J I
I
I 1
AREAL
EOMJLLA13 I LOUNGE
DI PATCH
—
ED
FD
4"VTR
VTR
+/- 0'-0"
o
a
— — —I— — —
—I— — —
—I— —
—I—
— — —I—
— —
—I—
— —
—I
— —
—�
—I —
GO
—I— — —1— — —
— H
I
I
I
I
I
I
I
I
I I
GREENING
-
-
- - ROOMS--�-
}k
-_
-
_ r
-T --
-T -T
_r
FRUIT PROCCESING
AREA
FP
®
FD
®
p
w
FCOOMCE
AREA
I
I
f
$
#
\
/
FP
EJ
ED
—'qREA
ME NINE
D
-
O,
,:. _
_
y+
—
—
C
li
40'-8"
199'-O"
501-61
41'-01,
38%511
40,-0' 58'-8"
I I
I
I
I
I
\_
I
EJ
I
I I
13
ELECTRICAL RM
0
0
1 2
3
4
5
6
N 4
7
8
9
10 11 i
I
o
MAINTENANCE
o
AREA
I
o
x
113'-0"
1T-0"
60'-0"
01 EXISTING CONDITIONS - FLOOK FLAN
480'-0" r
5CALE: 1/16" =1'-0"
5701 ENVIRONMENTAL DRIVE
5T LUCIE COUNTY, FLORIDA
Key Plan
55ue5:
No.:
Date:
Description:
A.
11/06/20
CLIENT REVIEW
B.
11/25/20
CLIENT REVIEW
C. 12/06/20 CLIENT REVIEW
D. 01/29/21 DEMO PERMIT
DONADIO
& Associates, Architects P.A.
2001 9[h Aveane, Sums 308
Vero Beach, FL 32960
Te1.772.794.2929
.don2562.8b00
www.dooadio-acchcom
License No. AA0002238
Consultant:
Z/D��8�5 �f�i14
REVIEWED FOR
CODE COMPLIANCE
ST. LUCIE COUNTY
BoC
Drawing Title:
EXI5TING CONDITION5
FLOOR PLAN
Reference North
FILE COPY
Drn: Drawing File:.
MT
��d• • ,.' Chd: XKEF File:
' 0 Project No.: Plot File:
2020-35
Sheet No.:
z(EC2.10
Copyright p 2020, Donadlo & Associates, Architects, P.A., All Rights Reserved
xg
p
- - y Froject:
RENOVATION
4&0'-0"
FOR
40' 0" 13' 0 &0'-0" 34T 0
S
CONTENDER 13OA15
LEGEND DEMOLITION NOTES:
FD 1t� REMOVE AND DISPOSE OF ALL EXISTING ELECTRICAL CONDUITS, WRING, LIGHT
FLOOR DRAIN FIXTURES, JUNCTION BOXE5, ETC, 15ENEATHEXI5TINGMEZZANINE AREA. SAFE 5701 ENVIKONMENTAL DRIVE
FCCOFF ALL ELECTRICAL CIRCUITS PRIOR TO ELECTRICAL DEMOLITION. jT. LUCIE COUNTY, FLORIDA
FLOOR GLEAN OUT Q REMOVE ENTIRE MEZZANINE STRUCTURE, INCLUDING FLOOR DECKING,
\ i ; COLUMNS, BEAM5, AND RAILINGS. GUT OFF EXISTING MEZZANINE COLUMNS
/ \ VTR o 4" VENT THROUGH ROOF AND ANCHOR VOLTS AS FLUSH A5 P055115LE TO EXISTING CONCRETE 5LA13,
PROTECT AND MAINTAIN EXISTING FLOOR, WALL5, AND RIGID FRAME COLUMNS Key Man
DURING DEMOLITION. CONTRACTOR SHALL PROPERLY DISPOSE OF MEZZANINE
MATERIAL A5 DIRECTED BY THE OWNER.
\ ; PROTECT AND MAINTAIN EXISTING RIGID FRAME STRUCTURE; COLUMNS, GIRT5
i AND SIDING, ADJACENT TO MEZZANINE 5TRUGTURE 15EING DEMOLISHED.
,�. 0 .REMOVE EXISTING MEZZANINE STAIRS AND LANDING. GUT OFF ANY AND ALL
- - CONNECTION A5 FLUSH AS P05515LE TO THE EXISTING FLOOR 5LAB AND ANY
\ / ADJACENT BUILDING STRUCTURE.
\(S) REMOVE AND D15PO5E OF ALL EXISTING VENTILATION EQUIPMENT, DUCTWORK,
s — -- -- - -- - ---
LIGHT FIXTURES, ELECTRICAL CONDUIT/MFZE, JUNGI ION BOXES, ETC, ABOVE 12
EXISTING GREENING ROOMS. SAFE OFF ALL ELECTRICAL CIRCUITS ASSOCIATED
WITH REMOVED VENTILATEON EQUIPMENT, LIGHTING AND ELECTRICAL JUNCTION
oJXES PRIOR TO DEMOLITION OF THE 4 EXISTING GREENING ROOMS AS SHOWN o
ON SHEET D2.10. cv
V ® DEMOLISH 4 EXI5TTNG GREENING ROOM5,12' THICK PRECAST CEILING
' STRUCTURE, MA5ONRY WALL5 AND ANYCONCRETE COLUMNS WITHIN THE
MASONRY WALLS. FIELD VERIFY EXISTING 12" THICK CEILING STRUCTURE 55U e5:
GONNEG110N TO EXISTING MA90NPY WALL5 TO REMAIN. PRIOR TO DEMOLITION - --- - - - - ' - - --
-- n . Datr: Dean ion:
-- -
TO DETERMINE MEANS AND METHOD OF DEMOLITION PROCE55 IN THIS AREA. - -
BRACE EXI5TING GREENING ROOM MA5ONRY WALL5 AND CEILING STRUCTURE A. 11L06/20CLIENT REVIEW
VERIFY WA AND CEILING STRUCTURE
TO REMAIN PRIOR TO DEMOLITION. FIELD WALL g. 11/25/20 CLIENT REVIEW'
TO REMAIN WILL BE SELF-5UPPQRTING ONCE ADJACENT WALLS AND CEILING
ARE REMOVED. NOnFY ARCHITECT OF FINDINGS. C 12/08/20 CLIENT iZEVIEW
CUT EXISTING MA50NRY WALL AT 1'HI5 LOCATION NEAT AND GLEAN. PATCH AND D. 01/29/21 DEMO PERMIT
REPAIR REMAINING MASONRY WALL CORNER, A5 NEEDED, TO MAINTAIN - --
STRUCTURAL INTEGRITY AND FIN151-1.
9Q. MAINTAIN AND PROTECT EXISTING RIGID FRAME COLUMNS ADJACENT TO
- - - -
BE REMOVED. (TOTAL OF 4 LOCATIONS).
GREENING ROOM MA50NKY WALL5 TO
t® EXISTING 4' FLOOR DRAINS TO HAVE FLOOR GRATES REMOVED AND DRAIN _-_--= - -. ._-._- ..-
HOU51NG5 FILLED IN WITH CONCRETE. (TOTAL OF & LOCATION5).
@ 4" FLOOR CLEANOUT5 (TOTAL of 4 LOCATIONS) TO BE ABANDONED. 4' VLR
(TOTAL OF 2 LOCATIONS) TO BE REMOVED. CAP OFF EXISTING MAIN DRAIN LINE---- ---- - ---- -. _.---------- --- --------
AT EAST END OF BUILDING, AT 2 LOCATIONS, TO 5EAL OFF DRAIN LINES A5
REQUIRED VYCODE.
L- - - - - _
- -
i� i�l
L'- -y - -> _ - > ❑❑�- - ' �- -�L L- _�L L/- - - -- -- -- -- --- - --- - - - -
�❑ 5
7
11 11
FP
FD
-- — - - - ---- — ------
+ 4'-0°
' i 4" VTR O 4" VIR O�
8 V 10 10 -- -
- o
o - -- FCC FC
ro "; 5
5 - - - - -- --------------- - ------ _.-._ - --
II C)
o ,
- - - - ------------ -.----.
m l
9
6
PROCCE5ING GROOM5G ........ ----- - ------.._ -- - - - - -
AREA
--- - -- 810 -- -...........- L3. �______ --- ---- --- ---. -
�a 'V
--�
Fp
J 2 1 FCO FCo
e ®
--------- . --'_.
I
FD 5 ill FP
_-..-._._ _........ -. ,.
MEZZANINE ® 9
. MEZZANINE TO
DE DEMOLISHED
_I -_—_ —�
I r
5 DONADIO
l 8
I � & Associates, Architects P.A.
V h FL 32960
ero Beat
'I'e1.772:7941929
Fax.772.562.8600
i FD `7 'FD www.donaaio-erch.[xnn
t x
--- ass
q Licenre No. AA0002
i I I 11 11 ,
Consultant:
2 II 3
5
RTITT Tj
7TI T-a r`FII ... .._
IT
T r T T FF T _i� u-i LL,
,.
r-.
EXISTING MAIN DRAIN LINE
s` .Drawing Title:
-�
DEMOLITION
FLOOR PLAN
' - - Reference North
290'-0" 77 FILE d/®■ ■
Drn: MIT
Drawing Filei--
��.•' Chd: XREF File:
• AJD
60?� Project No.: Plot File:
01 DEMOLITION - FLOOF, FLAN , 202Q33
• 5heet No.:
5CALE:1/10" =1'-0, 24� ' Z
/rD12.10
,. co"ht © 2020, Ponadio & Aeeodatee, Architects, P.A.. All Right Reserved
2
SECTION 01732 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Seon Includes:
1 Demolition and removal of selected portions of building or structure.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off -site unless
indicated to be removed and salvaged or removed and reinstalled.
B. Existing to Remain: Existing items of construction that are not to be permanently removed and
that are not otherwise indicated to be removed, removed and salvaged, or removed and
reinstalled.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1.4 INFORMATIONAL SUBMITTALS
A. Predemolition Photographs or Video: _Submit before Work begins.
1.5 CLOSEOUT SUBMITTALS
A. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility
licensed to accept hazardous wastes.
1.6 FIELD CONDITIONS
A. Notify Architect of discrepancies between existing conditions and Drawings before proceeding
with selective demolition.
B. Hazardous Materials: It is not expected that hazardous materials will be encountered in the
Work.
1. Hazardous materials will be removed by Owner before start of the Work,
2. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate
contract.
01732-1
C. Hazardous Materials: Hazardous materials are present in buildings and structures to be
selectively demolished. A report on the presence of hazardous materials is on file for review
and use. Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials
except under procedures specified elsewhere in the Contract Documents.
D. Storage or sale of removed items or materials on -site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them
against damage during selective demolition operations.
1. Maintain fire -protection facilities in service during selective demolition operations.
PART 2-PRODUCTS
2.1 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before
beginning selective demolition. Comply with hauling and disposal regulations of authorities
having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition
operations.
B. Survey existing conditions and correlate with requirements indicated to determine extent of
selective demolition required.
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended
function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
D. Engage a professional engineer to perform an engineering survey of condition of building to
determine whether removing any element might result in structural deficiency or unplanned
collapse of any portion of structure or adjacent structures during selective building demolition
operations.
E. Survey of Existing Conditions: Record existing conditions by use of measured drawings,
preconstruction photographs and/or preconstruction videotapes.
01732-2
Project:
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain. ,, Maintain services/systems indicated to remain and KENo VAT 1 o N
protect them against damage.FOK
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify,
disconnect, and seal or cap off indicated utility services and mechanical/electrical systems 0 �� ^ i D EK O `�-i
serving areas to be selectively demolished. I �i
. er will arrange to shut off indicated services/systems when requested by Contractor,
2. Arrange to shut off indicated utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide 5701 ENVIRONMENTAL DRIVE
temporary services/systems that bypass area of selective demolition and that maintain 5T. LUCIE COUNTY, FLORIPA
continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire -suppression systems, plumbing, and HVAC
systems, equipment, and components indicated to be removed. Key Flail
a. Piping to Be Removed: Remove portion of piping indicated to be removed and
cap or plug remaining piping with same or compatible piping material
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same
or compatible piping material
C. Equipment to Be Removed; Disconnect and cap services and remove equipment.
t
3.3 PREPARATION
A. Site Access and Temporary Control Conduct selective demolition and debris -removal
operations to ensure minimum interference with roads, streets, walks, walkways, and other 55ue5:
adjacent occupied and used facilities. No.: Date: DeScrlptioni
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent -� � -t ---
injury to people and damage to adjacent buildings and facilities to remain, -
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required
to preserve stability and prevent movement, settlement, or collapse of construction and finishes _ ------------
to remain, and to prevent unexpected ir uncontrolled movement or collapse of construction
being demolished.
3.4 SELECTIVE DEMOLITION, GENERAL --------------
A. General: Demolish and remove existing construction only to the extent required by new------------------- _- _____ _.__- -- ----------------
construction and as indicated. Use methods required to complete the Work within limitations of
governing regulations and as follows;
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use
cutting methods least likely to damage construction to remain or adjoining construction. - ------_.- --.-..-.- ---- - Use hand tools or small power tools designed for sawing or grinding, not hammering and
chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to - ----- ----- ______ -
remain.
01732 - 3
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring
existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At
concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden
space before starting flame -cutting operations. Maintain fire watch and portable fire -
suppression devices during flame -cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to
impose excessive loads on supporting walls, floors, or framing.
5. Dispose of demolished items and materials promptly.
B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling
during selective demolition. When permitted by Architect, items may be removed to a suitable,
protected storage location during selective demolition and cleaned and reinstalled in their
original locations after selective demolition operations are complete.
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or
otherwise indicated to remain Owner's property, remove demolished materials from Project
site and legally dispose ofthem in an EPA -approved landfill
1. Do not allow demolished materials to accumulate on -site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces
and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that
will convey debris to grade level (in a controlled descent.
4. Comply with requirements specified in Section 01524 "Construction Waste
Management."
B. Burning: Do not bum demolished materials.
C. Disposal: Transport demolished ma ' 'als off Owner's property and legally dispose of them.
3.6 CLEANING
A. Clean adjacent structures and im vements of dust, dirt, and debris caused by selective
demolition operations. Return adjagnt areas to condition existing before selective demolition
operations began.
END OF SECTION 01732
01732-4
DONADIO
& Associates, Architects P.A.
200/. 91h Avenue, suite 308
Tet.772.7942929
Fax.772.562.8600
www.donaiio-archcrom
Li=n No. AA0002238
Goneultant:
Drawing Title:
5PEC5
Reference North
FILE COPY
Drn. Drawing File.
_MT
��r. '`�,'•. • d- - XPEF File: ....- -
AJO
�• O�'- o.: Plot File:
1 ' 0 2020-55
fleet No.: ;
e • 424`a6
Date Sian i" ��D!/!f/L(`�'•10
Copyright O 2020, Dona ilo & Associates, Architects, P.A., All Rights Deserved