Loading...
HomeMy WebLinkAboutCreekside Lot 78-Temp ToiletENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 2- Z`-,_ Z Project: C1[C�Q Address: 3 3 T%uN 1 T( ('!/e /-07` 7Q Check one: 6 Regular Inspection: Permit No. o;Z0/( — 0l7 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural I Service/Ground I Storm Piping & Test I I Insulation Sheet Rock Appliance/Equipment Fixtures all & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: Y12' 7 'gip -7- Inspection Results: krAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: __:rQ_r h 'T , C.e_'t 15 1. ' 2. 3. 4. 5. 6. 7. Inspector's Name: bQN%A— Lic.#: gAJ �'08 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamrfa.com