HomeMy WebLinkAboutBuilding plans, 1709-0267Gulf Coast Supply and MFG Sv Crimp Metal roofing FL #11651.12
26 ga. 5v crimp metal roofing attached to plywood deck using 49 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4' side laps and 6" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
s aced 6" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL 411651.12
26 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o,c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4' side laps and 6" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
raced 4" o.c_ at all laps and two staggered rows 12" o.c. in field. Attach
12
SLOPE 4
8'-1" T.O.B.
12"
.
12"
5/8" thick light textured
stucco on typical concrete
block construction O
% - -
- - - - - - - - - - - - :;7-
0'-0" = Finished F
Finish Columns with 5/8" thick x 8"w cut
5/8" thick cut coral RIGHT ELEVATION
coral finished stucco bands
finished stucco bands
SCALE: 1/4" = 1'-0"
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL 411451.12
26 ga. 5v crimp metal roofing attached to plywood deck using 49 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4' side laps and 6" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced 6" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
12
4 1 SLOPE
T
loor
Z�/ o Lnlcit, cuL coral stucco on typical concrete
finished stucco bands block construction
ELEVATION NOTES:
Overhangs at 1`0" unless otherwise noted on Roof
Roof pitch at -4:12 unless otherwise noted
Any changes to this plan shall be submitted to the
for approval in writing prior to starting construction.
Return ALL Stucco Bands Into Window or Door.
MU
FEAR ELEVATION
SCALE. 1/4" = 1'-0"
Plan
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #11651.12
26 ga. 5v crimp metal roofing attached to plywood deck using #9 x I.5"
wood screws with self sealing washer at 12" o.c, max spacing over ASTM D
architect (type 2) 30 Ib felt underlayment installed with min. 4' side laps and 6" end
/ laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
aced 6" o.dec. at all laps and two stagggered rows 12" o.c. in field. Attach
sdpeck to trusses using attachment tail on this sheet
12
4 SLOPE
70 a"7
T. LUCTF 17MLITY 911I,Pr1 C rP771ZION
EVTF.WED FOR COIN N%4;W+ ,Gi/-+/'/
1V EWED By 7�
ATE r
LANS AND P"2:•f]T MUST BE KEPT ON JOB
,R NO INSPECTION WILL BE MADE.
/8" thick x 8"w cut
oral finished stucco bands
THESE PLANS AND ALL pROpBSEQ
ARE SUBJECT TO ANY OC)AREC.TIPN8ORK
REQUIRED BY FIELDIN4PEOTQRS THAT
MAY BE NECESSARY IN OIIQCF TQ
coMPLY WITH ALLAMM ISAW CODES -
CONCEALED FASTENERS OR ATTACHMEN'i .
ARE THE RESPONSIBILITY OF THE
CONTRACTOR OF RECORD
Al1MANLABI.EB 8HOWINr3
MAND �PL�E
U WRH FBO ENEMY CODE MUST
REMAIN ON ALL DOORS AND WINDOWS
UNTIL INSPEGnONS ARE APPROVED
TERMITE TREATMENT KE�
1/8" Thick cut coral stucco over paper
backed wire lath nailed to substrate through
one layer of 15 lb felt using 8d nails. Substrate
to be 19/32" CDX Plywood nailed at 6" o.c.
in field and edges with IOd ring shank galvanized
nails into truss webbing.
12
12"
O.H 2,
5/8" thick x 8"w cut ®.: H. 5/8" thick x 8"w cut ® ® ®®
3 coral finished stucco bands 3 coral finished stucco bands 1-1 El
A
5/8" thick light textured
stucco on typical concrete L4
Finished Floor
block construction
= -
ara a d Floor
-
----------------------------------------------------- - - - - -- -0'-4" A.F.F. 5/8" thick light textured
stucco on typical concrete
LEFT ELEVATION block construction
FRONT ELEVATiON
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
Product Approval Submittal Affidavit
Opening
Schedule Swing Doors, Overhead Doors, Sliding Doors,
Windows & Skylights
Opening
Type
NOA/FL
NUMBER
Product
Model #
Manufacturer
Glass
Attachment method
�zspT
Date ation
at
ofeAppro Approved Tests
1,2,3
t4
FLU 11499.2
Single Hun
g g
Series 185
MI Windows
and doors
. x tjpcone WW mirrii p natLet on at =q
ramsac corner end L o.c. ChereaF[er [hrougn PT Buck into edict
min 2.5" ed a distance m strict adherence
Pilled CMII well approval.
o the product apptaIMI"g g
± 60 psf
A
I6-0330.02
Overhead
Garage Door
Model 824/811
T 4' max. width
IL'-O" max height
DAB
rst x uo to concrete en • can wt
y e5 ha ve t. uep 3/e' x L' Hilt, HLC 64eve enehan at 9' o.c.
th 1.25' dia. eaehen e,ti min 4" edge distance. Inetatl tract to buck
ng !D 5/ii' x 1 5/9" full thned lag eorem in each bracket mamtainmg
min ar 1.5' edge distenee - GG to strictly adhere to product approval
ravke l/I ut an idler whart.
10-9-21
+ 50.0/-60.0 sf
p
B
FLU 16614.1
Fiberglass
Design Pro/
Smooth Pro
Jeld-Wen
Elco 1/4" dia. tapcon with min 1.25" embedment at 3" max
from corners and 11.5" o.c. max thereafter in head and jambs.
+ 50.0 PSF
C
FL# 15332.2
SlidingGlass
Door
Series 420
MI Windows
and doors
. x pcona w mi . enetration at max.
FTme°eck intonsolidnfilled CMuawallllammainteningRmin 2L5" tdBegdistance
In strict adherence to the product approval.
+ 48.2 PSF
-
Product
NOA/FL
NUMBER
Model #
Manufacturer
Attachment Method
ExSplration
Date
Design Pressure
of Approved Tests
Mullion
FLU 15353.8
CM-18531
vertical mullion
Mi Windows
and doors
For CMU use (2) 1/4° x 2 3/4" tapcon with min 1 1/4" embedment
penetration into each Mull Clip. Attach mull to clip using (4) #10 x 1.25"
calf tapping screws per clip as shown in product approval.
+ 118.9 PSF
Roof
FL# 11451.12
SV Crimp
Metal Roofing
Gulf Coast Supply
and manufacturing
2L gga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(t a 2) 30 111 felt underla ment installed with min. 4F aide la s and V and
sP g p
laps fastened with corrosion dresistant tin caps and with c. ring shank Walla
at all laps and two etal m r rows 12" o.c. in Field. Attach
spaced L° trusses
deck to truaaes using attachment detail on roof plan
- 108.5 PSF
Siding
Stucco on Block
Soffit
FL# 12198.3
Model T4 12" vented
Vinyl Soffit
Kagcan
Install using 2" x 2" battens at t." o.c. screwed to soffit framing using
48 x 3" wood screws at each truss. Install soffit to battens using
I die. x .5" lono rina shank nails t /6" dia.
+55.0/-35.0 PSF
Hurricane
Panels
FI# 15016.2
24 Gauge
Storm Panels
Global Protection
Products LLC
Install using 1/2" dia, solid set lead anchors with 1/4" dia.-20 x I.5"
long SS screw head combo. with Neoprene washer at 12 1/2" o.c.
along the bottom and 13" o.c. at the top
± 45.0 PSF
I have
reviewed
the above and approved it by my seal below. ( Architect or Engineer of Record )
12"
5/8" thick x 8"w cut
coral finished stucco bands
Finish Columns with
5/8" thick cut coral
finished stucco bands
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
2" x 4" top plate I/2" drywall ceiling on truss bottom cord
1/2" drywall on
2" x 4" studs at 16" o.c.
base -board � I 11 ,, 2" x 4" P.T. bottom plate
\ 4" concrete slab with fibermesh OR
CxV 410/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
nterior Non -Bearing Partition
nts
PERMITTING INFORMATION (FORM 100)
Florida Building Code Residential: 5th Edition and ASCE 1-10 for Wind Loading
Building Design is: Enclosed Risk Category: II Wind Velocity: 145 mph ultimate
Mean Roof Height: �ll':pp" Roof Pitch: 4:12
Internal Pressure Coed dent: ±0_I8
SubJectabilitg to damage from: Weathering: Negligible Termites: Very Heavy
Width of Roof End Zone: " Wind Speed: 165 mph ultimate
Wind Exposure Classification: C 1.21 x O.6 = O.126
Adjustment factor for Exposure Height: ASD desi�ggn
Load Combination: ASCE 1-10 Section 2.4 DL+LL; DL+0.6WL; O.LDL+O.6tDL
Components t Cladding Wind Pressure (NET) Roof Zone: I. +20.6/-32.6 par
Roof Zone: 2. +20.6/-51.0 psf
Roof Zone: 3. +20.6/-84.0 psf
Components t Cladding Wall End Zone Width: 3'-4"
Components t Cladding Wind Pressure (NET) Wall Zone: 4. +35.8/-381 oaf
Wall Zone: S. +35.8/-41.8 par
Components t Cladding Wind Pressure (NET) on Garage Door. +32.0/-40.3per
Shear Walls Considered for Structure? Yes
Continuous Load Path Provided? Yee
Are Components an Cladding Details Provided? Yes
Minimum Soil Bearing Pressure:2,500 psi, Presumptive: X By Test: psi
This Budding Shall Have the Following:
APPROVED SHUTTERS: X IMPACT GLASS: BOTH: NEITHER:
ROOF LIVE LOAD: 31_ psf ROOF DEAD LOAD: 10 psf
FLOOR LIVE LOAD: -Ii- psf FLOOR DEAD LOAD• 10 oaf
JOB ADDRESS:
TGH
E-1 = Roof Zone I
Walla Zone 4
ES = Roof Zone 2
Walls Zone 5
END ZONE
Mae Corner Zones
Roof Zone 3
FLOOR FLAN ,H,
CRASH POST DETAIL
TYPICAL NOTES: SCALE 1/4" = 1'-0" N.T.S.
I. Contractor to verify ALL notes and dimensions prior to 36" high by 4" diameter
steel crash post. Floor
proceeding with work. Flange with 4 - 3/8"
2. Contractor to STRICTLY enforce ALL OSHA Requirements. expansion bolts Into
3. ALL Lumber to be used as Beam, Rafters, etc... to have slab (3/8"t 50 ksi steel plate)
a minimum IAOO P.S.I. fiber stress. `"
4. No dissimilar metals to touch. 2/2"
S. ALL Concrete used for slabs shall be min. 2,500 PSI concrete. o"/,"
ALL Concrete used for vertical filled cells, coat. tie beams etc.. to I IF
shall be 3,000 P.S.I. concrete and/or 4,000 P.S.I. grout mix " To
° 2%"Drywall at ceilings shall be leveled and attached to bottom chord
of trusses with screws per FBC R702.3.5. 2%° 0
1. ALL wood In contact with concrete shall be pressure treated.
8. ALL wall dimensions are nominal and not finished Wall or stud dimensions.
9. ALL plumbing fixtures to be low flow.
10. Contractor to Provide Drain at water heater in accordance
with the current edition of the Florida Plumbing Code.
11. Contractor to Provide a 2'-8" wide door at one bathroom for
handicap accessibility requirements,
Al12.
T-V
Lowest finished floor to be set by Governing Building Department
surveyor to set in field.
13. Separation between residence and garage shall be per FBC R302.6
14. Door between garage and residence shall be 1-3/4"t 20 min. rated door
w.H. = Water Heater
15. Wall and Ceiling shall have a flame -spread classification of not greater than 200 per
FBC R302.9.1
I6. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450
per FBC R302.9.2
17. All exposed attic insulation materials installed on attic floors shall have a critical radiant
flux not less than 0.12 watt per square centimeter. Exposed foam plastic insulation
I" x C P.T. Buck nailed to
block with case hardened nails
materials exposed on the underside of the roof deck or on the attic walls shall comply
prior to door attachment
with F.B.C. R316 - see permit info box of code edition
18. Gypsum board material shall conform to ASTM C36, C79, C415, C514, C130, C931
C9(o0, C1002, C1047,C1177, C1178, C1278, C1395, or C139L and shall be installed
according to the following: (FBC R702.3.5)
Drywall
Thickness
Location
Orientation
Membeg
Max. spacing
of fasteners
Nail sizing options for
installation of drywall into
Spacing
Maximum
wood framing members
Nails
Screws
2" x min. thickness
Ceiling
Perpendicular
24"
1"
12"
13ga 1 3/80Rng with 19/64" head
0.098" diameter x 1 1/4" Ion
/2
annular -ringed or Sid cooler Hall
OR
Walls
Either
16"
8'
1C
0.080" dia. xx 1 5/8" long with
Direction
15/64" head
OR
Gypsum board nail 0.086" dia.
x 15/8" with 9/32" head.
Ceiling
Perpendicular
24"
1"
12"
13ga 1 5/8" long with 19/64" head
OR
0.098" diameter x 1 3/8" long
annular -ringed or bd cooler nail
Walls
Either
I6"
8"
16"
0.092" diaOxR I 1/8" Ion with
9
Direction/4"
head
OR
Ggpsum board nail 0.0915" dia.
x I l/8" with 19/64" head.
Install SGD thru buck into
block with 3/16" tap -con with �_-
1 1/2" penetration at 6" o.c. max.
from each corner and 20." o.c. max
thereafter at head per product approval
Use 3/I6" tap -con with
1 1/2" penetration at 6" o.c. max.
from each corner and 20" ox. max
thereafter at sill per product apprc
19. ALL ceramic the surfaces installed shall conform to ASTM A108.1 thru A108.6,
A108.1, A118.1, A118.3, A136_l and A137.1
20, Cement, fiber -cement or glass mat gypsum backers in accordance with ASTM
C1288, C1325, OR C1178 and installed I.A.W. manufacturers recommendations shall
be used as backer for the wall tile in tub areas and wall panels in shower areas.
21, Insulation including facings such as retarders or vapor permeable members installed
within floor -ceiling assemblies, roof -ceiling assemblies, wall, crawl spaces and attics
shall have a flame spread index not to exceed 25 with an accompanying smoke
developed index not to exceed 450 when tested in accordance with ASTM E 84.
Insulation shall comply with F.B.C. R316.
Grade
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #11461,12
26 ga. Sv crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 Ib felt underlagment installed with min. 4' side laps and 6" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced 6" o.c. at all laps and two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet \
Simpson HETA 20 or equal
hurricane anchor at each truss 12 PRE-ENGINEERED TRUSSES
with (10) IOd x I I/2" nails
( 24" o.c.) supporting Max. 4 �— at 24"o.c. TYPICAL
18101bs. uplift (shop drawings by manufacturer)
Aluminum Drip ------f�
" \R-30 blown fiberglass
Edge t Fascia
V-1/2"
in bottom chord of trusses
drywall with smooth finish
2" x 6" Sub -Fascia
Two rows of beam block filled with concrete
and (1) #5 bar cont. in each row. Substitute
Kaycan full o vent vinbl soffit installed
precast lintel filled with concrete and (I) #5
bar for bottom
using 1/8' die shank x 15" long galv.
cont. row over openings
roofing nails with 3/8" die. head per
product approval -see chart sheet #1
1/2" dryywall over 1" x furringg
PI
strips ai IC o.c. with R4.1 -foil
insulation on tgprcal 8" Block walls
5/8" thick light textured
All drywall to be installed per FBC R102.3.1
stucco on typical concrete
T
and shall meet all pertaining ASTM codes.
block construction
m
Mortar to be Type "M" only proportioned per FBC R601.1
and Mortar Jonts shall comply with FBC R601.2.1.
Provide Dur-O-Rock at all wet areas (ex. showers, tubs etc...)
95 bar vert. w/
30" overlap
Fill cell with concrete and
at each filled cell
(D 45 bar vert. (typical).
Max. spacing shall not exceed
Wood
48" unless otherwise noted
see foundation plan notes for
Base
spacing at openings
4" concrete slab with ribermesh OR
6"x6" #10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
III -- 14" x 14" Concrete footing
14" with (2) #5 bars cont. and #5
TY F i C A L SECTION transverse bars at 48" O.C.
Scale : 1/2" = 1'-0"
om
Masonry Beam
Head
fixed door
sliding door
7r1 I/2"
Sllding Door Detall
At Masonry Wall NTS
AREA CALCULATIONS
Living A/C =
1446
sq.
ft.
Front Porch =
141
sq.
ft.
Rear Porch =
200
sq.
ft.
Garage =
321
sq.
ft.
Total Under Roof=
2108
sq.
ft.
Total Cubic Ft =
11,568
2' VTR
JAL
I
I
1
21' VTR
Mastery/I JIL
Bath I
2. ri
I��LIeay.
Lay.I
q I 2" VTR
3' JIL
I 1
2• 3.
Shur.
Kit. Sink I
I
Kitchen 2 I
I
La'.
3'
w.c.
Bath 42 Sher.
a„
C.O. To septic
PLUMBING RiSER
I" x 6" P.T. Buck nailed to
block with case hardened nails
prior to door attachment ,
Masonry Wall
gpical Flooring
Install SGD thru buck into
block with 3/14" tap -con with
1 1/2" penetration at 6 o.c, max.
from each corner and 20." o.c. max
thereafter at Jambs per product approval Jamb
J
Window
Schedule
Mark
Size
Rough Op en.
Window Description
PRESSURE ZONE
I.
4'-5%'x 5'-3%8"
54%a"x 63%q"
Single Hung
ZONE 4
2,
C-2%"x 5'-3 %'
15" x 63 %;'
Single Hung
ZONE 4
3.
2'-2" x 3'-2 1/2"
1 21%;'x 38%"
Single Hung
ZONE 4
4.
4'-5/a'x '4'-2%a'
1 54%a"x 51%"
Single Hung
ZONE 4
ALL
Windows to be aluminum
windows w/ tint
and mullions per
elevations.
ALL
windows to withstand
pressures in permit info box on
sheet I
ALL
windows in bathrooms to
be tempered
All
rough opening
dimensions
to be verified by contractor
With
manufacturer s specs prior to construction
Door Schedule
Mark
Size
Rough Opening
Door Description
PRESSURE ZONE
A
9'-0" X 1'-O"
108" x 84"
Overhead Garage Door
ZONE 4
B
3'-0" X L'-B"
41 %4"x 83%"
Fiberglass Panel - Inswing
ZONE 4
C
6'-0" X L'-8"
14" x 81 '/2" or ace"
Sliding Glass Door
ZONE 4
D
2'-0" X L'-8"
Solid Core - Wood
- 6-Panel -Bi-Fold
Finished 24" x 81 %2"
E
2'-6" X L'-8"
Solid Core - Wood
- 6-Panel
F
5'-0" X v-8"
Solid Core - Wood
- 6-Panel - Bi-Fold
G
2'-8" x V-8" x 1 %q"
Solid Core Wood, Steel, or Masonite Door
H
2'-8" X V-8"
Solid Core - Wood
- 6-Panel
J
2'-6" X V-8"
Solid Core - Wood
- 6-Panel - Bi-Fold
K
2'-B" X 6'-8"
Solid Core - Wood
- 6-Panel - Bi-Fold
ALL Exterior doors to withstand pressures stated in permit info
box on sheet 41
GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM AND SHALL
WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX ON SHEET 41
All rough opening dimensions to be verified by contractor
With manufacturer s specs prior to construction
I
34'-O"
14'-o"
T-6"
12;_ 8'-6" .12"
00
OO 109 1 1°0
IL
EGRESS
0
12" x 12" concrete column block filled
with concrete and (2) #1 bars vert. tied
Into lintels above
p
Covered Porch
°
o
O
O
N El
00 O FUll 1 11711O 1 1 IME
°
MASTER I
u U c
BEDROOM
OD n-o u
8'-O" tol 9'-8" A.F.F.
'IV Vautteld Ceding
LEW
Flat Ceiling
GREAT
o
o
ROM
a—
O
N
I
I
O
0
Rod t'ithelf
°
H B
I I
Vanity to a is 1 t I
N
34'/,„hlg D I to c�v
I
L
C O E I
O
9 2" x 6" knee -wall L-AB'1-O" to 9'-8" A.F.F.
O below 'AV
rr r I counter top I Vaulted Ceiling
DINiNG
LINENROOM
8" Rod t Shelf ijs F\
O
OCABINE
w
�F I
DW I I
A T H
w
Vanity to be
A O
34 /2 „ high
High Wall
m KITCHEN
Van
Dryer
thro
h wall
O t— 1-1/2" iy
I --
— Mer—hang
iv .
A.F.FCeding6'-
u FlFlatat
{7a�
10'-5"
B.
pper ca meta to ID
extend over Ref.
n
2" filler
I iv
er. I E
41_01,
R
•- —BATH
O
amng i4cri=aa
— Rod t Shelf O
R—II Bates
w.H. w ® O
# I
Steel Ballard I 6
See detail op
l" I
22" x S4" j 1 cn O
F
Provide auto Attic Access O
w
closer L with light
1
0
0
_ _
o a
a 22" � 8'-O" A.F.F.
Flat Ceding
150 Amp
v
i
Meter
4„
Ir-6"
P nel 0
ri
SECOND
IL
GARAGE E BEDROOM
O
iv
'0111
m
O -4" A.F.F. MT D0
ry
Flat Ceding Q
O
F\0,
O
Ory
O
O
r-----------------� EGRESS
1 Block wall in °
garage to be i = E 2
I struck block T
0
1 I O o I.
I i - C VER D
o
I I 12" x 12" concrete column block filled
O
ORC with concrete and (2) 1 bars vert. tie
Q
into lintels bove
to
i 6, 2" II'-6" 6„
�
a
0
2,_8„
2, 8,
4,-2„
34'-0"
Install windows thru buck into
block with 3/16" tap -con with
1 1/2" penetration at 6" o.c. max.
from each corner and 20." o.c. max
thereafter at ,Iambs and 20" o.c. max.
Exterior face at head and sill per product approval
of wall --\ / \ Buck to be I" x 4" PT
P.T. Buck nailed to
block with case hardened nails
Detail a t W i n d o w s prior to window attachment
Braden lt
Braden ,Ai,A, FA
Architects
- Planners
411
S.E. Coconut Avenue
Tel
: (112) 281-8258
Fax
: (112) 287-8283
E-mail:
bradenaias'comcast.not
Stuart, FL
3499G UAAC000032
NTS
Wynne Building Corp.
The Grand Carlton
Spanish Lakes
St. Lucie County Florida
INSTALL VULKEM BLOCK SEALANT
ON ALL JAMB, HEADER, AND
SILL BLOCK PRIOR TO BUCK
INSTALLATION
Exterior face
of wall — \
Attach buck to block wall with
1/4" dia. Elco cone screws with min.
1 1/4" penetration at 12" o.c. max
and 4" max from each corner thru
2" x 6" PT Buck
Uetall at Uoor
0.
a
crews thru jamb into buck
nge and IS" o.c. max and
prior to door attachment
NTS
Date Drawn Revisions Sheet Comm #
GARAGE Drawn raven
LEFT by: 2. 12 - 2 �
c.c.u.
Checked by:
D_R.B. OF 5
'A4,_n„
STRL
TES:
I.
ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL
9.
BEARING CAPACITY. IF ANY SUB -SOIL, MUCK OR NON -UNIFORM
CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN
PROPER ENGINEERING DATA FOR DESIGN.
2.
ALL SLABS AND FOOTINGS TO BE A MINIMUM 2,500 PSI AT 28 DAYS
10
ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI
BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS
3.
POISON SOIL AND COVER W/ 6 MIL. VISQUEEN WITHIN 24 HOURS. NO
SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION,
II.
4
GROUND FLOOR SLAB TO BE A MINIMUM 4" THICK W/ 6X6 10/10
WELDED WIRE MESH REINFORCING ON 6 MIL. POLYETHYLENE VAPOR
12.
BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL
(MINIMUM 95% DENSITY). LAP POLYETHYLENE 12" MINIMUM. FIBERMESH
MIX MAY BE SUBSTITUTED FOR WELDED WIRE MESH.
5.
LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS
BEFORE FILL IS BROUGHT IN. FILL TO BE SPREAD IN 12" LAYERS AND
13.
MACHINE COMPACTED TO A MINIMUM OF 2500 PSi IN AREA OF
BUILDING CONSTRUCTION
6.
TEST FOR FILL COMPACTION MINIMUMS PRIOR TO FORMING SLAB.
14.
1
GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE
is.
ATTENTION OF THE ARCHITECT.
I6.
8.
GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER
FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR
17.
FCLAD�470N FLAN
SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY
FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS
DESIGN LOADS ARE AS FOLLOWS:
ROOF (DL+LL) = 41 PSF
WIND VELOCITY = PER PERMIT INFO BOX ON SHEET #I
EXPOSURE ="C"
ALL REINFORCING STEEL SHALL BE GRADE 60, MEETING ASTM A-16, it
A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 301 STEEL.
ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR
BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE.
FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS,
SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE.
MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS:
FOOTING: 3"
BEAMS: 1-1/2"
LAP ALL REINFORCING STEEL A MINIMUM OF 48 BAR DIAMETERS.
USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1600 PSI
ALL STANDARD LUMBER SHALL BE SYP WITH A MINIMUM Fb OF 1000
PSI OF NO.2 SOUTHERN PINE, UNLESS NOTED OTHERWISE.
ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE
PRESSURE TREATED. FASTENERS TO HAVE MIN. G185 RATING.
I. Any changes to plans must be submitted to the architect
for approval before proceeding With construction.
2. Contractor shall be responsible for verification of all
notatlon and dimensions before Starting COnStrUCtlOn,
3. Soil conditions assumed to be 2S00 psf. Should any other conditions be
encountered, the architect shall be notified in Writing for revision
-4. Verify all recess thickness at showers, tile, etc....
S. Contractor to provide filled cell with concrete and 1 48 bar vert. at 48"
O.C. max. Provide (1) filled cell On each side of openings upp to S'—Il" wide.
Provide (2) filled cells on each side of Openings from ('—O" to 9'—II"
and Provide (3) filled cells on each side of openings from 10'-0" and up
Contractor to see plans for any other condition used. Foundation walls
shall have filled cells at 24" o.c. unless otherwise noted (see section)
�. Contractor to provide for Form Board Survey — Form Board Survey
to be provided to Truss Company prior to truss construction
1. Contractor to provide for soil test prior to construction and provide
a copy Of soil test to architect for review prior to construction
8. ALL Reinforcing Steel Shall be grade 60, meeting ASTM A—l( and
A-35 specifications. ALL Anchors to be A-30-1 steel.
9. Provide a minimum of 3" concrete protection at footings and
1-1/2" concrete protection at beams for ALL reinforcing bars.
SCALE: 1/4" = 1'-0"
Termite Protection for New
Construction.
Soil treatment used for subterranean termite prevention
inside the foundation perimeter shall be done after all
excavation, backfilling and compaction is complete.
If soil area is disturbed after initial chemical soil treatment
area shall be re -treated with a chemical soil treatment
including spaces boxed or framed.
Treatment must be in accordance with the rules and laws
established by the Florida Department of Agriculture and
consumer services.
Protective sleeves around metallic piping penetrating
concrete slab on grade floors shall not be of cellulose
containing materials and shall receive application of
termicide In annular space between sleeve and pipe.
#5 bar vert. w/
Thicken edge to 8"x8"
30" overlap
SEE TYPICAL
with concrete and
4" concrete slab with fibermesh OR
at each Filled cell
ECTIONS
one 45 bar continuous 6"x6"
3*10/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
4" concrete slab
with ribermesh OR
GRADE
6"x6" #10/10 WWM
on to mil Visqueen over
clean compacted
termite treated fill
CIO
Grade
—IIII—
Ili 11
III
t+
�^ —
III;
PORCH SL AB
EDGE DETAIL
III
III IIII— 14"w x
14"d concrete monolithic
=IIII
-„ footing
with (2) #5 bars cont.
SCALE 1/2" = I'-O"
14"
TYPICAL FOOTING DETAIL
SCALE 1/2"
4" concrete slab with fibermesh OR
6"x6" 410/10 WWM on 10 mil Vlsqueen over
clean compacted termite treated fill
45 bar cont.
Ste per
o. Foundation plan
E1O„ (2) #5 bars cont. bottom steel
12"
DETAIL AT GARAGE STEPDOWN
SCALE 1/2"
12" x 12" concrete column
block filled with concrete
and (2) #1 bars vert. tied
into lintels above Verifg house slab
height in field
Top of footer
14" below finished floor
.71
I - _ I111 �IIIII�
II-IIII
-IIII 30"x30"xl6" concrete
column footing with (4)
= 45 bars each way
IIII-III -
3'
30"
COLUMN FOOTING DETAIL
SCALE 1/2" = 1'-0"
v-
#5 bar vert, w/
30" overlap
at each filled cell
Adjust curb height
based on gar. floor
slope.
#5 bar in curb \
ICAL
5
4" concrete slab with ribermesh OR
6"xV #10/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
O'-O" a F.F.
—IIII IIII
14"w x 14"d concrete monolithic
Footing with (2) #5 bars cont.
3'
14"
GARAGE CURB DETAIL
SCALE 1/2" = I'-O"
2" x 6" PT wood secured with \
3/8"dia. x 6" anchor bolt at 18" o.c.
overhead door track secured to wood
jamb per manufacturer's product approval
Garage Door Jamb Detail
GARAGE DOOR TO WITHSTAND PRESSURES STATED NTS
PERMIT INFO BOX ON SHEET #I. SEE PRODUCE
APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL.
Filled Cell Masonry Column With One
#5 From Footing To Tie Beam
Conc. Fill To Be 3000 PSi
See Floor Plan For Location
Single Fllled Cell Column
NTS
Filled Cell Masonry Column With One
#5 From Footing To Beam Each.
Conc. Fill To Be 3000 PSI
See Floor Plan For Location
Double Filled Cell Column
NTS
°
°
Or--=—=---
----,0 F
�� I
J
FI I Filled der
der above girder
-
24„ N
O
Rear Patio/Slab r-
f _ to be poured separate �I
from the house slab.
m
ofc,
Thicken footing to
24"w x 14"d x 24"L I
I FI under filled cell a
I 1
under girder bearing. E1 ]— E ° 1 11711❑ ❑❑
-----F— — — — — —-
m
I Rear Patio/Slab to
u o e
be flush with bottom of I °
OD
a.a ue
F v n
I sliding door recess. I t-
Slope 1/2" i
LL N
�-
I �
t-
I
I �_
IO
I
I FI I
o
I
10
°
4" concrete slab with fiber esh OR O
6"x6" 410/10 WWM on 6 mil V squeen over I
clean compacted termite tr ated fill
G
I
FI I
of
i
IE
i
V i
°
O
I I-
m 11
FI
I
® ° to
EIS
H.B.
I� a K-1oO
--� —— °
to
TERMITE TREATMENT I O
--------w.H.
Or—
o
A/C
I -- _ . , aul m
d-
#I
I 410 Steel Ballard 7
Filled w/ Concrete O I I 1 \- W
F5 > I �p
p� I I`F21a1 It
OI
v I L 4
I
I I I
-4
on Q-17 I
E d) Qb
3 n
Et! I I t o
��E I FI
�--a
a�4J I m\ \ I
10
O
Q3 LL
ry UO o
I �o CA F5 I � —— O
- - --
____-
F5 - it g W I ° O° O I I ❑° O❑°
°
I " IL Io
x F4I
ow
Recess for F�—1 N rl
l
O�—
----J0
00 Garage Door 00 00 ° °
o
.o
O❑
J9'-O" 3'-5" 6'-2"
I �1ll I/111 L LI I D.II_J
� with concrete Vand�y (2) #1 barswulllll Vveri Uejei
into lintels above
A
b
FOOTING
SCHEDULE
Mark
Size
Description
FI
14"W
x 14'D
MONOLITHIC FOOTING
WITH 2 #5 BARS CONTINUOUS
F
12"W
X 12"D
MONOLITHIC FOOTING
WITH (2) #5 BARS CONTINUOUS
F
3o"
x 30" x I6"D
COLUMN FOOTING WITH (4) #5 BARS EACH WAY
8"W
x 8"D
THICKEN SLAB EDGE
WITH 1 45 BAR CONTINUOUS
FS
14"111
With
x 14"D
Curb at Garage
MONOLITHIC FOOTING
WITH 2 #5 BARS CONTINUOUS - CURB 9 0'-0"
c._-_ I—— _ .en C------ Mr.-r .urtL
ROOF SHEETING
ATTACHMENT DETAIL
I.
Minimum Nall 51ze =
oa ring
snarii, knurl.
iVr !.i,
2.
Minimum Screw Size
= 48 x
2"
3.
Minimum Sheathing Thickness
19/32" CDX
Plgwood
4.
Use nails or screws
based on
pressure for
for
roof
3
stated
in permit info box
on these
plans zone
KeLl
Area
Edge
Field
Fastener
Max.
Pressure
Zone I
6"
6'r
Sidring shank
45 psf
Zone 2
"
6"
8d ring shank
7L psf
Zone 3
4"
4"
8d ring shank
84 psf
** Zone 3a
6"
C
#8 wood screw
112.5 psf
** Use nails or screws based on pressure for roof stated
in permit info box on these plans for zone 3
Provide #5 bars with min. 48 bar
diameters overlap Into beam. Tie
filled cell steel into continuous
beam block steel.
Provide Cast -Crete = '
BUS-OB/OT precast
lintel set in mortar
Min. 8" Bearing -- - - --
Provide #5 bar set in pre -cast
lintel Into beam where length of
the opening calls for it.
T r �
a PT Buck
ed per jamb
into filled cu
4" Pre -cast
Sill k
Verifq with Plan
Concrete 12"x 12"
/Lintel (--1 Column Block
u7
7 Rebar
Rebar 48 Bar Dia.
Min. Overlap
Column to Lintel Attachment
NTS
Filled Cell
Provide #5 bars with min. 48 bar
diameters overlap in filled cell. Tie
'filled cell steel into continuous
footer steel.
SINGLE PLY REAR GIRDER TRUSS
Nail 2" x 4" blocking to vert. leg of
truss with IOd x 1.5' nails at 4" o.c.
Install Simpson MGT into wall using
5/8" dia. threaded rod set min. 12"
into wet beam and (22) IOd nails into truss
3LOCKING DETAIL
)ER STRAPPING
TER BEARING POINT
-1/8" thick light textured stucco installed per
ASTM C 924 over ASTM D type 2 paper backed
wire lath nailed to substrate through one layer of
ASTM D Tpe 2 felt paper using Sidnails. Substrate
to be 19/32CDX Plywood nailed at L" o.c. in field
and edges with IOd ring shank nails into studs.
Gulf Coast Supply and MFG 5v Crimp Metal roofing FL #IIL51.12
26 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 Ib felt underlayment installed with min. 4' aide over
and 6" end
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
s aced 6 o.c. at all laps and two staggered rows 12" o.c. in field. Attach
dpeck to trusses using attachment detail on this sheet
Additional Precast Lintel _
Lintel
Bar
Clear
'Tl
/ ✓'/
#5 bars
;' '
r;-,•ir;,:';! 9 P'" •,'%".", 9 9 CLEAR
Length
Length
Span
Bars
Bars
i
i i
2'-8"
'-6"
2,93
none
2'-0"
'`---'----y `----'
3'-6"
3'-4"
2'-2"
2,43
none
8F8-OBAT 8F8-IB/IT BPS-IB/2T
4'-O"
3'-10"
2'-8"
2 #3
none
Additional
/#5 bars
•.'.
4,-4"
3 -2"
2 #3
none
CLEAR -
-yOne Row of "H",;;+�:::7
Block Above
-4"
5'-2"
4'-0"
2,93
none
_
2 #4
none
r.%'•'� Precast Lintel •;i;-
r ';
'..•:.':
6'-6"
2,#4
none
i i Additional .... f
2 #5
none
i #5 bars
�'----'' s'----�6'-2"
8FIL-IB/IT 8196-8/2T
8'-4"
1'-10"
7'-0"
2,45
1 none
NOTES:
1. min. coverage of steell.5"
2. min. bearing required ea. end=8"
ALL reinforcin steel is rode LO.
g g
3. standard for rai steel=ASTM A615
TYPICAL LINTEL SECTION
( PRECAST CONCRETE )
1
LINTEL SCHEDULE
Mark
Window
or D
unit
Width
Lintel
Size
Cast -Crete
Specification
owe of
'i Block
Above
Bottom
Steel
Sizes
Top
Steel
size
Max.
Gravity
Load
(PLF)
Max
Uplift
Load
(PLP)
Max
Lateral
Load
(Pli
L22
2'-2"
3'-L"
sr8-OBAT
I
#5
3069
1569
1024
L31
2'-L"
2'-8"
V-1"
4'-0"
8F8-OB/IT
1
#5
2561
13L3
149
L45
4'-5"
5-io-I
8F8-OB/IT
I
95
1105
909
339
L50
5'-O"
L'-L"
I 8F8-OBAT
I
#5
12se
835
121
LLO
L'-8"
i'-L"
BF8-OB/IT
I
#5
1011
121
534
L80
8'-0"
9-4"
8F8-IB/2T
I
#5
2
#5
152
591
512
L90
T-O'
10'-v
era-I13/2T
I
#5
2
#5
1.43
530
401
L9013
9'-O"
1o'-6"
8FIL-IB/2T
ONE
I
#5
2
#5
1533
1183
401
LI00
10'-0"
11"1"
BFB-IB/2T
1
#5
2
#5
582
494
452
LIOOB
10'-0"
1 11'-4"
BFIL-IB/2T
ONE
I
#5
2
#5
13LL
1028
452
1I20
1 12'-O"
13'-4"
SFe-IB/2T
I
#5
2
#5
411
428
324
L120B
12'-0"
13'-4"
8FI1.-iB/2T
ONE
I
#5
2
#5
1015
1-TO
324
L140
14'-o"
15'-4"
8FIL-IB/2T
ONE
I
#5
2
#5
1250
609
259
LILO
IL'-O"
m-4"
BFB-IB/2T
1
#5
2
#5
300
192
194
LILOB
IL'-O"
11'-4"
1 aril;,-IB/2T
ONE
I
#5
2
#5
950
Soo
194
- ALL LINTELS SHALL BE MADE BY CAST-CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIREMENTS
LINTELS OVER 14'-0" LONG ARE TO BE PRESTRESSED.
I -
12
Simpson HETA 20 or equal .41
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
( 24" o.c.) supporting Max.l
18101bs. uplift
Aluminum Drip -
Edge t Fascia
Flash and Counter
flash
Nail ledger o
gable end truss
with (2) IOd ils
at each web
Aluminum Drip
Edge t Fascia 1/2" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood
12° framing with nails or staples to provide
no less than 1-3/4" penetration into
2" X 6" Sub—Fa6Cl horizontal wood framing and 3/4" penetration
into vertical wood framing members
Kagcan full o vent vmgl soffit installed
using 1/8" die shank x LV long galv.
roofing nails with 3/8" dia. head per
product approval -sae chart sheet #I
12" x 12" concrete column
block filled with concrete and (2) 47 bars vert. tied-_
into lintels above
thicken edge to 8"x8"
with concrete and
one 45 bar continuous
BEYOND
Top of footer
IL" below finished floor
5/8" thick light textured
stucco on typical concrete
block construction
Varies - see plan
#5 bar vert. w/
30" overlap
at each filled cell
Rear Patio/Slab to
be flush with bottom of
sliding door recess.
Step
per
foundation
plan —
Slope
per
foundation
plan
I I I I—IIIIIIIII I
=IIII=IIII=IIII .
IIII„I�II,��I� II11IIleI-IIII
IIII=IIII=IIII=
.IIII=1 I I 1=1
T 11blCa�
Poured Con
concrete bl
Poured Concret
concrete block
Concrete ,
Manufacture
kluminum Parini
Imes per manufacturer
See Tubfcal Stud Detad
1/8" , 3/32" Wing Nut w/
appropriate washer and spacing
per manufacturer's Details \
4S
Stud Detail
Stud m/ Die Cast Zinc nrs
Nickel Plated Ling Nut
Flush Mounted Shutter Detail
nts
I
S ectlon
Brace Gable end
with 2" x 4" SYP 42
Oft back nailed to bottom
of top chords using (2) IOd
nails at each truss
FIR E- ENGINE ER4---D WOOD TRUSSES
® 24"o.c. TYPICAL
( shop drawings by manufacturer )
Brace Gable end
with 2" x 4" SYf
Oft back nailed to
of top chords usin
nails at each trust
R-30 blown fiberglass
in bottom chord of trusses
I
-1/2" drywall with smooth finish
Two rows of beam block filled with concrete
.and (U #5 bar cont. in each row. Substitute
precast lintel filled with concrete and (U #5
bar cont. for bottom row over openings
1/2" drywall over I" x furringg
strips at 16" o.c. with R4.1 fall
-insulation on typical 8" Block walls
d1a. threaded rod with min IT' embedment
into beam either wet set or in epoxy with
(22) IOd nails into truss. Add blocking to
truss leg per detail on this sheet
Simpson HETA 20
hurricane anchor at each truss
( 24" o.c.) supporting Max.
HETA 20 1810 lbs. uplift
N
L90
L90
LLO
BI
SI
'
$1
o
I
03
'r'r
(V
B I L90
;.
BI
".y
O
O
W
12
zr7
~
BI L45
i U
12°
L
I
BIZY
I
Z/ Y�y
v 7-
— .4
l (y c
In
LO Q3 I
4�
lY I
I w N
E
� n
L31 BI I
B
111 U�
L45
N
1]
_
O
e-
Q
I
--- -�—
F
I ulf Coast SL40DILI
ond MFG 5v Crim Metal roofing FL #IIL51.12
Lll
H
HJ
O woo screws with self
W N (type 2) 30 lb fel
sealing washer at 12" o.c. max spacing over ASTM D
underlayment installed with min. 4' side laps and L" end
=
laps fastened with
corrosion resistant tin caps and with 1,25" ring shank nail
eck to trusses u61
g attachment detail on this sheet
C
N
d
E41cl
---,
r— w�
1
tLlc cc@"
I with light
4 SLOPE L- - - - -�
I
a
C
C
L
E
'
n.I
I
8'-0" MAX.
T
po ed I I BI
1
PRU
tf
b ttoim
(2) IOd
OIN
(2) SE I I
g
1
z
i/ I
£
i
-
Br--r� I
12"
O
L31 BI I m
1
I BI 1
I
I
I I I BI
L45 BI
O
= O
o
- Q
BI
m F-
OW_
Imps
H
TA LSO
W
=
glirricall
e arkhor
at e truss
=
LO
( 2
o.c
sup
orti X.
I8Q$1
lbs.
upllf77
m
BI
BI
U)
L90B
LBLO
L9
w
w
� X
L �
r
U rn
n3 �
L �
a ° a
aZ
a.
L
U
� v
s3
O
OD
L N
L �
r
All drywall to be installed per FBC R'102.3.1
and shall meet all pertaining ASTM codes.
HETA 20
Mortar to be Type "M" onyy proportioned per FBC
and Mortar joints shall comp-ly with FBC RbOl.2.l.
(ex
R6O-Ll
Provide Dur-O-Rock at all wet areas showers,
tubs etc...)
Fill cell with concrete and
#5 ftypicaU.
ROOF F L A I �l
�(D
Max. sppbar vert.
shnot exceed
48" unlessnotherwise noted
see foundation plan notes for
— OVERHANGS AT 1 - O UNLESS OTHERWISE NOTED ON THIS SHEET
spacing at openings
— ROOF PITCH AT 4:12 UNLESS OTHERWISE NOTED ON THIS SHEET
4" concrete slab with esh
L"xL" #10/10 WWM on Land mil Visqueen over en
— TRUSS SHOP DRAWINGS TO BE PROVIDED BY MANUFACTURER
clean compacted termite treated fill
- ANY CHANGES TO THIS PLAN SHALL BE SUBMITTED TO THE
ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING CONSTRUCTIO
IIII=IIII
— ALL TRUSS TO TRUSS CONNECTIONS BY
=11
- ;,,IIII—
TRUSS MANUFACTURER
— ARCHITECT TO REVIEW TRUSS SHOP DRAWINGS PRIOR
FI
TO CONSTRUCTION FOR LAYOUT AND UPLIFT VERIFICATION
at Front Porch
- CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO PROVIDE
._ "
FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO TRUSS CONSTRUCTIC
Scale : „ __
Revisions
et
Comm I
Braden t Braden AIA, PA
Wgnne Building Corp.
Da5e
She
-1,wn
Architects — Planners
411 S.E. Coconut Avenue
The Grand Carlton
GARAGE
LEFT
Drawn by:
12
Tel : (112) 281-8258
C.C.U.
Spanish Lakes
Fax : (112) 281-8283
Checked by:
E-mail: bradenaias'comcast.net
St. Lucie Count(g Florida
D.R.B.
OF 5
4t.inet FI '%4ggL itAAr-'000032
�;1
_ J;
PANEL "A"
Pales
13
Land
Wire
Description
circ#
circ#
Description
Wire
Load
BR
Poles
2
90
'I.O kw
#8
A/C carp
1
2
AHU
#Io
3.5 kw
30
2
3
4
2
30
4.5 kw
#10
40 gal. we HTR
5
L
Ran a
#L
12.0 kw
50
2
�
e
I
20
1.8 kw
#12
Pump
9
10
Dr er
tt10
5.0 kw
30
2
II
12
2O
1.5 kw
#12
13
14
Dishwasher
#12
1.2 kw
20
1
I
20
1.5 kw
#12
Microwave
Is
16
Refrigerator
412
1.2 kw
20
1
I
20
1.5 kw
#12
Kitchen S.A.C.
m
18
Recepts
#12
20
1
IJ22�01!2
tt12
Kitchen S.A.C.
19
20
Recepts
#12
20
1
I
#12
Clothes Washer
21
22
Recepts
#12
20
1
20
0.81 kw
#12
Garage Door Opener
23
24
Recepts
312
20
1
1
20
1.4 kw
#12
25
26
Recepts
#12
20
1
1
20
1.92 kw
#12
21
28
Recepts
#12
20
1
1
20
#12
General Lighting
29
30
Recepts
#12
20
1
1
20
#12
General Lighting
31
32
Recepta
#12
20
1
1
20
#12
General Lighting
33
34
Exterior GFCI
912
20
1
1
20
212
General Lighting
35
34
Bathroom GFI
#12
20
I
I
20
#12
Smoke Detectors
31
38
General Lighting
#12
20
1
I
20
#12
1 Bathroom Gist
39
4o
General Lighting
412
20
1
spare
1 41
42
spare
PANEL "A" LOAD CALCULATION SHEET
Load Description Qt .
Watts
Total(Watts)
General Lighting (3. watts
Small. Appliance, C,lrcutt(s).........
.Range....... ........................................
Fqf rigerator...................................................
Microwave
Dish W_asher...........................................
Clothes..Washer...............................................
Clothes..Dryer................................................
Water Heater
Water, Pump ..................................................
Garage Door. Opener
sq.. ft.)
.. ........... .....
..,,,.,,
.....71-
1135
3
5,205
2
1.500
3,000
1
12,000
12,000
1
1,200
1,200
1
1,500
1.500
1,200
1,200
1,200
1,200
1
5,000
5,000
1
4,500
4.500
1
1,800
1,800
1
810
810
First 10000 Watts
Remainder
Electric Heat or A/C
e100%
21,415 940%
10,000 s65%
Total
1
1
1
Watts
10,000
0
10,000
31,415
10,000
10,944
10,000
Calculated Load
Watts
30,9LG
Voltage
240
Calculated Wattage Divided bg Voltage = Total Amps
Panel Size
Required =
129.03
15o Amps
Electrical SL,Mbol Legend
S
Single Pole Switch
®
Recessed Can Light
S3
Double Pole Switch
®
Egeball Recessed
PB
Push Button Switch
_�5
Exhaust Fan
Duplex Outlet
Ceiling Mounted Light
Special Receptacle
0-
Wall Mounted Light
Waterproof ground fault circuit
Light with Pull Chain (attic)
®
Floor Duplex Outlet
@
I Computer Connection Jack
Fc-m-1
Carbon Monoxide Detector
Flood Light
TQ
Thermostat
m
Electrical Panel
®
Central Vac
g
Electrical Meter
Smoke Detector
Ceiling fan
Q
Television Jack
Telephone Jack
AC c
A/C Disconnect
®
I x 4 Florescent Light
®
2 x 4 Florescent Light
SPKR
Speaker Hook -Up
Intercom
®= JUNCTION BOX TO SUPPORT A FAN
O = THERMOSTAT LOCATION
B/A = BALANCED AIR
Electric Notes:
I. Use copper wire only, no aluminum.
2. Provide and wire all required smoke detectors.
3. Contractor to verify location of electrical
service and provider.
4. ALL paddle fans shall be on a rheostat.
S. ALL bath and kitchen receptacles to be GFI protected.
L. ALL exterior outlets to be WP/GFI protected.
1 Recessed cans to be installed per NFPA requirements.
8. AFCI receptacles are required in all rooms except
Kitchen, Bathrooms, and Garage.
9. A/C Return Air Balance Must comply w/ FBC RMIX2
10. A/C Refrigerant lines that are run thru slabs must be
sleeved in PVC
11. ALL A/C Equipment shall comply with energy calculation
12. All work shall be performed by a licensed electrical
contractor, the completed system shall be fullg operative.
13. Contractor shall pay for all fees, permits, testing, and
inspections including blower testing where required.
14. All work shall be coordinated with other trades to avoid
interference with the progress of construction.
15. All required insurance shall be provided for protection
against the public liability and property damage for the
duration of the work.
16. Contractor shall guarantee all materials and workmanship
free of defects for a period of not less than two years from
the date of acceptance or certificate of occupancy, or one
year from closing sale of house.
Correction of defects shall be completed without additional
charge and shall include replacements or repair of any
other phase of installation that may have been damaged.
IG3 CFM
IOxIOX4
MASTER
BEDROOM
143 CFM
IOxIOX4
12xl2x9
B/A
CLOSE
8xx4
Vent_thru ____
Soffit VIP ATH
CFM
120
ry
I
PATIO/SLAB
I
I
CAR IAT
ROM
I
I
I2xl2x9
B/A Center Registers
a� IG9 CFM on eetiling fan 169 CFM
`y IOxIOx I \ IOxlOx1
r
A/C TH,,J w22" x 54"t >
Attic Access
with lightL-----L150 AmpMeter Panel��
GARAGE
Ir----------------- i
I I
I i
I I
I I
I I
I I
I I
I I
I
I I
I I
MECtiANICA_
ouT
SCALE: 1/-I" = I'-0"
11. It is not the intent of these plans to show every minor detail
of construction. The contractor shall furnish and install
all items for a complete electrical system and provide all
the requirements necessary for the equipment to be placed in
proper working order.
18. All work shall be done in accordance with the N.E.C. and
shall comply with all local codes and ordinances, and shall
meet all standard requirements of the local electric utility
and telephone company.
19. The electrical system shall be completely and effectively
grounded as required bg the latest edition of the N.E.C.
20. All material shall be new and shall bear underwriters'
labels where applicable.
21. All equipment and panel sizes shall be verified before
ordering. The contractor shall provide circuit routings to
suit the Job conditions.
22. Furnish and install all fixtures as called for on the plans
or as selected by others.
23. All raceways and pipes placed in or through any concrete
slab shall be spaced a minimum of three diameters of the
largest conduit or pipe from any other service.
24. All exposed wire below 9'-I" shall be installed in metal EMT
conduit.
25. Dryer Vents to be installed per FBC RM1502
DINING
ROOM
61
R�A1
I �ce7i�
k 20k2O
LE
232 CFM
12xbx1
SECOND
BEDROOM
I
j 12x12x8
�-y B/A
COVERED
PORCH
#2/0 Aluminum feed
I '/s' Conduit -�
2"PVC (
A/C disc.
ISO
MCB
PANEL
2" rigid service FPL I to #e5#cant rroppebariin slab
ELECTRICAL RISER
- Contractor shall use AL-CU Landing lugs. NTS
Contractor shall torque lugs I.A.W.
manufacturers recommendations which
shall be verified prior to construction
H.B.
Vent_ thru
SoFri t
Braden t
Braden AI A, FA
Architects
- Planners
411
S.E. Coconut Avenue
Tel :
(112) 281-8258
Fax :
(112) 281-8283
E-mail:
bradenaia8comcast.net
Stuart. FL
34996 #AAC000032
Exhaust Duct
Thru Soffit
4" Exhaust
Duct Thru
Wall
WP GF
Install oulet
under disc.
not shown I
clarity
ELECTRIC�4L PL,4N
PATIO/SLAB
WM
Exhaust Duct
Thru Soffit
E Wire For
Front Post
Light
SCALE: 1/4" = I'-0"
Attic Venting Calculations FBC 2309.1
Total Attic Space = 212�4 sq. ft.
Venting Ratio I/ISO = I4.1� sq. ft. required
fi rovide A Continuous Vented Soffit
Wynne Building Corp.
The Grand Carlton
Spanish Lakes
St. Lucie County Florida
Post Light with ,--�o
Photo cell I y
Date Drawn : Revisions Sheet Comm It
5-9-I1
GARAGE Drawn by: �
LEFT C.C.U. - I 12 - 2 �
Checked by: _
D.R.B_ OF 5
t
AkIFE SAFETY WARNING
This �mbol identifies Life Safety Warnings that should be read
given pecial attention by all persons installing trusses.
5PAGING NOTE
ALL TRUSSES ARE TO BE SET
AT 2.-0ON CENTER
EXCEPT AS NOTED
1 MULTIPLE PLY TRUSSES MUST BE
A TENED TOGETHER PER ENGINEERING
BEFORE SETTING. REFER TO
PNIGINEERING DRAWING TO DETERMINE
IF MULTIPLE PLY.
M
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
rYlAl CI II T RrtCl
3
' Spanlor less
30' to 60' Span
Spreader Bar
6o degrees
or less
rig �_ ApProz 2/3 to �
�— ' 2
Tdg Li
e Span approx.
Line /z of Span
REFER TO BCSI
REFER TO BCD
Truss m
sl be set th's way If crane used.
Truss must be set this way if crone used.
Imss s
insist cra
inmate, your tmss may not match.
e operator sets truss this way.
This is an example, truss may not match.
Insist crane operator sets truss this way
All load bearing walls, headers,
beams & lintels must be in place
at indicated height before trusses
A are installed. AL
1 Fl "A" F::> I E FR N OT IE—=
NLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUS. JHS
ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR
ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLIC I
WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS.
ONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR.
U REPRESENTS A HANGER
For Truss to Truss
Connections see
hanger/connector
iedule in engineering
package.
Carrying Girder
Nails must be as
shown. Guide fans
Dome angle nails.
T PLATES BY CHAMBERS
INDICATES LOAD BEARING WALL
REQUIRED BY TRUSSES
SUPPLIED BY BUILDER
AT A HEIGHT OF 8'-1"
ABOVE FINISHED FLOOR
12
4.00
upset=1/4" heel=315/16"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT 8'-1"
TYPICAL END DETAIL
12
4.00 F---
2.00—
upset=l/4" heel=315/16"
PLUMB CUT END
1 2 x 4 Top Chord
WALL HEIGHT F-1"
END DETAIL: A
A
ARRANGE WITH CRANE OPERATOR IN ADVANCE
FOR A SPREADER
BAR OF 17' - 23' IN LENGTH
1k
Do not stand
on
trusses until
they are braced per BCSI
& properly nailed
to
straps &
hangers
GARAGE LEFT
GARAGE RIGHT
13 TRUSS DRAWINGS ARE ATTACHED TO LAYOUT
FABRICATION AGREEMENT*
..•icAwnoreearArtrenwrn.rwsAoa'�raaorrcoau
.• Ttis Npd dssalptlm dfo plapsmp.eliws tlo bmeae vIA bs hMaled Iq
The ePl
t:Tllilpr Q a Iml. h Itch =w%nr a nah f Y bona pLcwmt diagram
Ylllt Utwafbwltlall 1W''allihtpalmoowdlbbftcdmaawtmmew
zMaht wbra.hasrrautnN.e..nwmeabyet.,.11f�l,to„a
a thlaig wrawm mft 15 pmovbed by c w no and b t7ma6ars These Idw ten p1j
dM' d ddmy 1w utldelelrlad grass fet m bwJmliwpes M be dowed..h aw .vs01
Bah 1a11an a01m b gaddied Ch"m Thwa Yid live aw. W days h w1Ydl
b be* mepmi Ill!"i4 or a ID bdil 1p afbiw wgsea, d Giribaa oplMh•
4.7110aalgmdmill d"8
0
0
14 aTPl a W0
'a MMy le to Joaodbll e sdb f10deMry.ChwnWmTr whn1wsobatithoitybdslwmtiisfoaltgObdlrJobeboFa
po}Oondfwjob ails ddh Own" ThmMlbenmww farAmpdNwYply
ttia bi9wr A napatu6la fdr.d�oM dNil 0yr= am iCl2nbaa 7lW lw b lWyt�.r
• e.i.w. job d. b riot R�prW for ddllwy «buys[ ill
not papwad for 6Nay dbuww.
t7M feepaw6le1 Chaibaa Thaw fro bwW mob dui 10 ON aabtlYw•'
a Plb a etimiwn h peraraph 7 b*w Y Kged b elWia If sly dirlaw aw.nwds hi
lei.l'ryaiLAiWPwhourfasfortsrMkiw: bidtapdb/dmlbYaTYuii.
T ghla' L a PURCitASE C b Chrtlbaa, orates d to no growl Ill, « i ,
• ilpewnwt a w..albb pmba. liiidlw wa be made m admy grow pdd wlah temms a
bn ddrwy htvolm mpay,a nods d adoAded dab-br ddmy 9 buyer emu ioI
ddm% a tebdtafad boos,. Ths t.atw.gwa area. b pay aiwnbems.Tluw wwmrrlt
dwWA14 be fa wa calm in ovsd ofpwmmmt mint Ihiwly ardo. l-Vt %per Inonei tetym
. dwige will be added fad swim not pelda4lii brow.
. aSlriYmge«haleb erlywtwaan/fe ehedaarmitw apaanwtbYtwmm twsht.
to b mneldw dlon d lNWPbew Tnwa eotglidl g aadt tier thb fladedgl the utidwYpod
• uisaialaidy gusratibw prryrtomt when dw d wy mid d hid"tilms owed b
17imhW Thi l by.my edb w ImiebaW and 1w umdaapmisd'gp�ea b andt
thidebted'iew ttdud4ig demtwya bee, a dada h peynwd for adwl W nade� gn
9a Into emt of any bP1Wn oomMtbV Ws ereamd, fo tam im6fwd haamder
or wymtiaib mvfwred b ketch fig pwtlm pings tlwt tM epb veiue br a y midi acfon we
be 8aM GbaN Cainy. Flomld� _
11. DDesMe�pti1 mapomw1014w we per wNdaW 81wdod And F�mnwgectOddeamm Cn
Rsipmgw6atlsa For CaYtrudbn Udp Metal Phds Cogocled_Wood Tmm
ANSVTP&NrCA4-20Dr`
1 ATIEP
SIBNED .
TRLE �"
-A bwrmVb."pW'8csI WbPWMtk#N&'1.yr0
= MultlPle ply trusses must be fatrbned myethar Per aMbtesrbtg
before they are sell faRm a to do so can ra4ultln roof sogapRie.
T®mporary and permanent bracing are nqullil and can am Oft
and property and b the plisponslbMW of the trans erect im
Study the contents of the b0oenation packet bxftcled on dellmry
before "Uft Vuel "
7Ytt mmattbontoWb acodp!�dod41bPitkWa 9
7iwses punt be ad plumb and sgwre
Do.fatter bimb or of ok of plywood6 rootbtg materlal or any -.
'ottmeP cclitCaritrabd toads on frmseer t11b can came
DfiNOT SET TRUSSES USING "11S LAYOUT
-' -USE LAYOUT DE NMW VYrfM 7TW3= 70 SET TRUSSES
CHAMBERS TRUSS INC
Fort Flsrce
V "a..r-h
Fort Plel Florida 34982.8423
800.551 %5932
7T2-466 2012 Faz 771466-8T11
'n249s9,2012 Stuart 7 2,2864=
The Architect's or Architect's repre:
Shop drawing approval
is No
"double check•• of thie`contrac
The coot..,, , .. !,_ 1i remain respi
for checking lield
measurement
Other construction criteria. Arch
aporuval covers general roof sh
review of truss sba13101119,
and trial
structure from uplif to,
their recal'
ps.
Approved By:8
F
92.0/93.2 MITEK 4.2
Dale:_
DESIGN CRITERIA
a.den .I.A. P.A.
County
SAINT LUCIE
Building Department
SAINT LUCIE COUNTY
Wind Design Criteria
ASCE 7-2014
Wind Design Method
Main Wind Force Resisting
Roofing Material
Shingle or Shake
Loading in PSF
Roof R.D.L.
Top Chord Live
20
Top Chord Dead
7 4.2
Bottom Chord Live
10 Non -Concurrent
Bottom Chord Dead
10 3
TOTAL Load
37 7.2
Duration Factor
1.25
Wind Speed
165mph
Top Chord C.B.
Sheeting by builder.
Bottom Chord C.B.
Sheeting by builder.
Highest Mean Height
14'-0"
Building Type
ENCLOSED
Building Category
II:Non Restrictive
Exposure Category
C
Barrier Island
No
Conforms to FBC 2014
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Chambers Truss Inc. Drawing Name: M71323
Scale: 1/4 = 1'
72 total trusses, 13 different trusses.
MI 4: SAE ACAD: SAE Reviewed By:_.,e1C
Date:04/24/12 Revised:10/07/15
FOR
WYNNE BUILDING CORP.
DESCRIPTION:
62' GRAND CARLTON III
PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE .7 &0 /
M11323