Loading...
HomeMy WebLinkAboutDEP Approval RECEI0b JUN 2 61017 Florida Department of Rick Scott Governor Environmental Protection Carlos Lopez-Cantera Bob Martinez Center Lt. Governor 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Noah Valenstein Secretary Receipt for Submission SELF CERTIFICATION FOR A PROJECT AT A PRIVATE SINGLE-FAMILY RESIDENCE THESE PLANS ANO ALL PR0?0SE0�WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO 1 1�1 ����� 06/13/2017 COMPLY WITH ALL APPLICABLE CODES. T. LL CIE L. T j:Z. LUNG DIVISION REVIEWED FOR CO PLIANCE REVIEWED BY XAJ Self Certification File No.: 0354925001 EE DATE l , File Name: 10 Nettles Blvd Jensen Beach, FL 34957 PLANS AN-D PtkNM MUST BE KEPT ON JOB - Self-Certification Modify With Boat Lift(Aquatic PreserveOR s)\0 INSPECTION WILL BE`MADE. Dear Bruce Jerner: On, 06/13/2017, you used the Florida Department of Environmental Protection's electronic Self Certification Process to certify complianMW0 gfMtypaig14AT TIAC"H.1,1 E,t conditions of the Federal State Programmatic General Permit(SPGP) SAP 5 WbILITV OF THE Process for a project at private, single-family residence located at: CONTRACTOR OF RECORD LAT - Degrees: 27 Minutes: 17 Seconds: 14.6012 LONG - Degrees: -80 Minutes: 13 Seconds: 37.0096 SITE ADDRES S: 10 Nettles Blvd Jensen Beach, FL 34957 COUNTY: St. Lucie For: r�, JAMES RISCIGNO 10 NETTLES BLVD Jensen Beach, FL 34957 You have certified that the project you propose to construct at the above location meets all the conditions of the Self-Certification Process. A project that is built in conformance to those conditions(attached for reference)will: 1. Qualify for a regulatory exemption under Section 403.813(1)(b)of the Florida Statutes (F.S.)and Chapter 62-330,Florida Administrative Code(F.A.C.).As such, it is exempt from the need to obtain a DEP Environmental Resource Permit.; 2. Qualify for Consent by Rule or Letter of Consent(as applicable)under Chapter 253, F.S. and Chapter 18-21, F.A.C. (and Chapter 258, F.S. and Chapter 18-20, F.A.C., if applicable), when the project is located on submerged lands owned by the State of Florida.; Your Self-Certification is based solely on the information you provided under this process, and applies only to the statutes and rules in effect when your certification was completed. The certification is effective only for the specific project proposed, and only if the project is constructed,operated, and maintained in conformance with all the terms, conditions, and limitations stated in the Self-Certification Process. In addition, any substantial modifications in your plans should be submitted to the Department for review, as changes may result in a permit being required. You have acknowledged that this Self Certification will automatically expire if: 1. Construction of the project is not completed within one year from the self-certification date; 2. site conditions materially change; 3. the terms, conditions, and limitations of the Self Certification are not followed; or 4. the governing statutes or rules are amended before construction of the project. Completion of the Self Certification constitutes your authorization for Department or Corps personnel to enter the property for purposes of inspecting for compliance. Receipt of this Self-Certification constitutes authorization to use sovereignty/state-owned submerged lands, as required by rule 18-21.005, F.A.C. The authorization must be visibly posted during all construction activities. In waters that are accessible to manatees,obtain information on your mandatory Manatee Protection sign by clicking here. PWP FlIt 0 FEDERAL STATE PROGRAMMATIC GENERAL PERMIT(SPGP) You have certified that the project you propose to construct at the above location meets all the conditions of the SPGP Self-Certification Process and will be built in conformance to those conditions(attached for reference). Your proposed activity as certified is in compliance with the SPGP program. U.S. Army Corps of Engineers(Corps) Specific conditions apply to your project,attached.No further permitting for this activity is required by the Corps. In the event of the transfer of ownership of the property by sale or by any other means, when the structures or work authorized by this SPGP Self-Certification are still in existence at the time the property is transferred,the terms and conditions of this SPGP Self-Certification will continue to be binding on the new owner(s)of the property. Although the construction period for works authorized by Department of the Army permits is finite,the permit itself,with its limitations, does not expire. To validate the transfer of this SPGP Self-Certification and the associated responsibilities associated with compliance with its terms and conditions,the attached transfer of SPGP Self-Certification request must be completed and submitted to the Department at the time of transfer of ownership. The address is given below on the attached transfer form. This SPGP Self-Certification is based solely on the information you provided under this process, and applies only to the statutes and rules in effect when your certification was completed. You have recognized that your certification is effective only for the specific project proposed,and provided the project is constructed, operated, and maintained in conformance with all the terms,conditions,and limitations stated in the SPGP Self-Certification Process. This Self- Certification will not apply if any substantial modifications are made to the project. You agree to contact the Department for review of any plans to construct additional structures or to modify the project,as changes may result in a permit being required. You have acknowledged that this Self-Certification will automatically expire if. 1. construction of the project is not completed by midnight,July 25,2021,unless construction commenced or a contract to construct was executed before July 25, 2021, in which case the time limit for completing the work authorized by the SPGP ends at midnight,July 25,2022. However, in no case can construction continue for more than one year beyond the Self-Certification date; 2. site conditions materially change; 3. the terms, conditions, and limitations of the Self-Certification are not followed; or 4. the governing statutes or rules are amended before construction of the project. Completion of the Self-Certification constitutes your authorization for Department or Corps personnel to enter the property for purposes of inspecting for compliance. If you have any questions,please contact your local Department District Office. Contact information can be found at: http://www.dep.state.fl.us/water/wetlands/docs/sler_contacts.pdf. For further information,contact the Corps directly at: http://www.saj.usace.army.mil/Missions/Regulatory.aspx. When referring to your project, please use the SPGP Self-Certification file number listed above.Authority for review-an agreement with the U.S. Army Corps of Engineers entitled Coordination Agreement between the U. S. Army Corps of Engineers (Jacksonville District)and the Florida Department of Environmental Protection State Programmatic General Permit, Section 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act. OP? ADDITIONAL INFORMATION This Self-Certification Process does not relieve you from the responsibility of obtaining other permits or authorizations from other agencies(federal, state, Water Management District, or local)that may be required for the project. Failure to obtain all applicable authorizations prior to construction of the project may result in enforcement. If you have any problems with the attached documents,please call the ERP Coordinator at (850)245-8495 or by e-mailing us at ERP eApps(i0ep.state.fl.us. Sincerely, Florida Department of Environmental Protection