Loading...
HomeMy WebLinkAboutTermite treatment, finalPlanning & Development Services Building &Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772.462m@2172 Fax 772m462=6 3 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT BUILDER PEST CO PEST CONTROL LICENSE # JB175775 i IN e FRA We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: > > c Percentage of solutions. �> �� Date of Treatment: Footing Chemicals used. )1c rn► N ko N � iT Total gallons used. lPV ?_( 241 1 j Time of Treatment 1st Treatment Re -Treat Driveway lst Treatment Re -Treat Other EEMEEP� EEEPW-E� 151 Treatment -WOMEN ------------- Re -Treat Slab 1" Treatment WEEEF-N-Eha� Re -Treat Pools 1st Treatment REEEEEWEEEV� Re -Treat rimeter for Final I of Signature o Note: There must be a completed form for each required treatment or re -treatment and this site to be picked up by the inspector at time of each inspection or the scheduled inspection w, fee charged. nspection gate rrp form must be on the job ill fail and a re -inspection FEBC104.2.6 Certificate of Protective Treatment for prevention of termitesA weather resistantjobsite posting board sh all b e provided to receive duplicate Treatment Certificates as each required protective treatment is comple te d, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity o f the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallon5 used ,, to e5tablish a verirlable record of protective treatment. If the soil ch em ica / b a rrler method for termite prevention is used, final exterior treatment shah be completed prior to final bur/ding approval. ' St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014