Loading...
HomeMy WebLinkAboutCreekside Lot 79-Temp Toilet®UNIVERSAL ENGINEERING SCIENCES Inspection Date: INSPECTION RESULTS 2 - Z&' <J-/ Permit No. .10// -0 / % 3 Project: C CeA�—,e s Ide Address: 33 3 3 % C/ eJ , %y 3 t*e 0-r I q Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING j( MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder. Gas Piping & Test Cond. Piping & Test Structural I I Service/Ground I Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment I Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: i Area Inspected/Code: Inspection Results: 0 AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: % un 7o r L¢f oN sl�re 1. 2. 3. 4. 5. 6. 7. Inspector's Name: kl ' d» Lic.#: v OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com