HomeMy WebLinkAboutCreekside Lot 79-UG Plumbing®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: -Z — Z 6 — L / Permit No.
Project:
Address: 3 2
�T 7q
Check one:
Y) Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
o2-611 - 0 / -73
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping &Tes t
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code: S�ZD GIG �Lu , �!, 6,�
Inspection Results:%AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: CC#Weou7 PiN2 Sue d 412,95:6 Q — Y'/oeS Af Ida-? W.47e e
1.
2.
3.
4.
S.
6.
7.
Inspector's Name: eyeµ Lic.#: Z a) 4 U
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com