HomeMy WebLinkAboutAPPROVED wynne roof O . .
Section A(General Information)
Master Permit No. Process No.
Contractors Name:T1 ona NI JI �(1 License# G!x EL -1 F�%
Job Address I �nCr` �
J ROOF CATEGORY
❑Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles
0 Asphaltic Shingles Metal Panel/Shingles OWood Shingles/Shakes
Prescriptive BUR-RAS 150
ROOF ROOF TYPE
New roof Repair ❑ Maintenance Reroofing C3 Recovering
ROOF SYSTEM INFORMATIO 0Low Slope Roof Area(SF) Steep Sloped Roof Area(SF) Total (SF)
Section B(Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include
dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets.
Vi9 �
XIq all
I
e*"r LUCK WORKS
Section D (Steep Slope Roof System) � EXtreme
Roof System Manufacturer: ,.-
Notice of Acceptance Number: - ------ 25621
Minimum Design Wind Pressures, If Applicable(From RAS 127 or Calculations):
Zone 1: Zone 2e: Zone 2n: Zone 2r: Zone 3e: Zone 3r:
Deck Type: C)c
Type Underlayment:
Roof Slope:
:` 12 Insulation:
Fire Barrier:
Ridge Ventilation? Fastener Type&Spacing:
Adhesive Type:
Type Cap Sheet:
Mean Roof Height: Roof Covering: I ---�
Type&Size Drip
Edge: ---