Loading...
HomeMy WebLinkAboutInsepction report-Columns.pdf[BUNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: JJ Z Z/ Permit No. Project: Address: 33 0 6 �Gi u�T� G'r2 Check one: T Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): 02©//— 0/8/ BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry 9( Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground I I Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: //S 5- Inspection Results: IX -AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: dke,�,A:2J 4WGC CQ&-5 arc Iced 5_7-ae4 a_,- / da,.� 1. 2. 3. 4. 5. 6. 7. i Inspector's Name: k—"- ( .D Lic.7i: i OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com