HomeMy WebLinkAboutFBC Energy effeciency code Planning&Development Services
Building&Code Regulation Division
2300 Virginia Ave, Rm 201
_ Fort Pierce,FL 34982
772462-2165 Fax 772-462-6443
� 0
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: /�'`/�' #: !'7 D r{ 0 2 2 Lot#:
Contractor: L'1 7 Address: 170r
Construction: Post Construction Test ❑Rough-in Test
Test Conditions:
Date: Floor Area(ft2):
Time: f s 3 Primary Location of Supply Ductwork
Indoor Temperature(F): 7 5' Primary Location of Return Ductwork
Outdoor Temperature(F): o
Total Leakage Test(Outside)
Duct Leakage: XDefault ❑Prop.Leak Free ❑Proposed On=
Test Pressure: (Pa)
Baseline Duct Pressure(optional) , y (Pa)
Duct Press.(Pa) Flow Ring Fan Press Flow(cfm) Results: ass ❑Fait
Installed Pa
a,S" Total Leakage(cfm):
Total Leakage per 100 sgft: /� 6
CFM25 x 100 divided by the CFA=Duct Leakage CFM/100 sgft.
Testing Company
Company Name: Pro Duct Services Address: 1915 Rio Vista Dr.,Fort Pierce,Ff.
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 51h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: Michael Faurot License/Certificate#: 5059122
APPROVELP"'
-