Loading...
HomeMy WebLinkAboutcompaction testHeadquarters 11345 U.S. Highway 1 Tr CP 1 t ENGINEERING PO Box 78-113777 Sebastian, FL. 32958 � CJJ�" AND TESTING Sebastian, FL.32978 Orlando Phones 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL, 32771 ASTM D 1SS7 and ASTM D 6938 KSMengineering.net DATE TESTED: March 3, 2021 KSM JOB #: 211682-id/CF/bm PERMIT#: 20120705 NUC# 234 CONTRACTOR: Wynne Development Nuc Model: MC -DR JOB LOCATION: 19 La Villa Way Nuc Serial #: MD60308234 Ft. Pierce, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. N.W. 0" - 12" 50+ 106.8 109.7 97.4% 2. N.E. 107.4 97.9% 3. Center 108.1 98.5% -4. S.E. 107.1 97.6% 5. S.W. 107.8 98.3% Soil Description: W 111.0 1 I 1 I I 1 Brown Sand E I I I I I I In Place Moisture: G 110.0 I I I I I 9.4% H T I I I I I I Proctor Optimum Moisture: 109.0----I----I —••�• — — 1— — 12.0% P I I I I I Proctor Max. Dry Density: P.C.F. C I I I I I I 109.7 108.0 F I I I I I @ Test Locations the Density & Penetrometer readings indicate the D 107.0 I I I I I Degree of Compaction Meets R I I I 1 I I Minimum Requirement Y - - - - - forUnstakedFoundation 106.0----I----I-----4- —--1----- ----, R``p` 1ttt�+ltytSubmitted: 9 10 11 12 13 14 15 Digitally �yPN E g y Moisture - % of Dry Weight �. �,�GENSF'•,�'� signed by P Disclaimer: Contractor is responsible to maintain Q►;' i No. 81439 Bryan E the tested area in the condition that KSM Dahlke completed the indicated passed compaction test. _ -0 C— m "�= Date: KSM is not responsible if the tested area has been i�0 STATE OF : • !(/�2021.03.04 altered from the approved inspected condition. �� FCORIOp:•' ��� 14:00:35 Br'y5n�jks)`�.E.-05'00' V.P. of Engineering PE # 81439 3/4/2021 Email to: dotty@wynnebc.com Proudly Serving Florida since 1990