HomeMy WebLinkAboutCreeksideLot 78-Sewer Connect-reinspect®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: 3 - 8 - _�2-/ Permit No.
Project: 0)1&a'L5 iG�e
Address: 3 3 z y
L04- '79
Check one:
)t- Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
- o i 7 1/
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
I
Service/Ground 1
11Storm Piping & Test
I Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code: 4 Z 1�7 sew e ?- OeE --
Inspection Results: �iAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
S.
6.
7.
Inspector's Name: Lic.#: 16)u a-6 8 9
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com