Loading...
HomeMy WebLinkAboutContract.,.A.IAYLOR ROOFING CONTRACTOR Project Address: 2719S 29-Street Phooe: Fort Pierce, FIL pat; and humance. This proposal includes labor, materials, and all moo, Please .he that "Oil Canning' is a chmmcterime of all metal antl is not arouse for rejection. Our `Professional"tahnicims will hereby complete the followine_ Completely remove existing roofing materials down to shealhing/deck and prepare as needed to ensure a clean, solid surface in which to apply a new roof. Inspect all sheathing and replace any rotten wood. (Estimate includes up e 3 sheets plywood sheathing replacement at an charge, for additional lumber replacement costs, see attached sheet). Install 8-1)'ting-slum M' fasmrters to existing sheathing/deck to meet current Building Code Requirements. Install peel and stick underlaymerd directly over sheathing, and mechanically fasten using approved fasteners per code requirements. Install new roofing accessories including: drip edge, fleshings, coveter -fleshings, plumbing seek fleshings, vent fleshings, and valley metal. (Accessories will be fabricated from 26 Gauge Galvanized materials/standard colors, or will be made to match maul roofing panels). Seal all penetrations using approved roofing cement and/or sealants Install new roofing materialslaccessmies using approved fasteners per code requirements. Thoroughly clean project of all "roofing related debris" and haul away. (Landfill fees are included). 5-V Crimp Metal Roof System (Mill Finish 26 Gauge) — - 5 9,600.00 1'• Standing Seam Metal Roof System (Mill Finish 24 Gauge) — 11,400.00 dwyc speumeaoons mvowmg aamnmsi costs wen be executed only upon vermen orders, and will toe me an extra charge ever and above the estimate. Replacement ofm etaklemsed lumber is rat included in estim ee Mess specified. Customer must provide access to building unless mrangemaas are made prior m estmae, therefore J A. Taylor Reading is tat responsible for damage to drivewayhudewaks and/or any other access areas needed to approach projects. Any client Met is in defeat m the yroe tt of money due under terns ofMis account will be clement at Me rate of I K % axeconda on Me unpaid bleat¢, (Mmimmn allaxable by law). If any client is refeawl to an ammey for cullsebm, client agrees m pay ll fees incurred in the collection of the amowt due, plus al court costs col atemey fees. Work will be se aduled upon written acc,Herve ofelis propose. This proposal may be withdrawn from us Host ecee,,W within W days. *AII major credit cards accepted, however an additionl processing fee Glue to 5%will be assessed to contmet toml depending on current marbly rote and cud used. ACCEPSANCE OF PROPOSAL Owner.�� Itete• Contractor: pate; For fin0ter assistance please coned 1.A. Taylor Roofing 772466-0040 or fax to 772-4683397 Thank you for the opportunity to bid yore project! ****"***** Serving the Treasure Coast for over 50 Veers *********** Reaoectfu llv Submitted by, Jack Nil], vId 302 Melton Drive Fort Pierce, FL 34992 Tel. 772.466.4040 Fax 772.468.8397 REPAIRS, RE -ROOFS, NEW COMMERCIAL & RESIDENTIAL ROOFING CONTRACTORS SERVING FLORIDA SINCE 1965