HomeMy WebLinkAboutTANK SPECS - 3-10-21Quality Steel Corporation AG/UG Propane Tanks
LEG Yr{flTN
1450 w9. AND ua
.w.w-.w A, ik.•% rule,-1C1/�A roe%atC
APPROXIMATE
ABOVEGROUND/UNDEGROUND
(AG/uvj v
CLutivir.1majurwa•+��
«�•• •�^• •--•--
WATER
DIAMETER
HEAD
OVERALL
OVERALL LEG*
LEG**
WEIGHT
"QUANTITY
FULL LOAD
PEft STACK
CAPACITY
(OD)
TYPE
LENGTH
HEIGHT WIDTH
128-101/2"
SPACING
(lbs.)
*120 wg.
24'
Ellip.
5'-8"
3' i'-11/2"
or 3'-11"
260
109 , 96
161 12
*250 wg.A
Hemi.
7 -10"
3'-8"
1'-5"
4'-11"
480
54
9
*320 wg.Hemi.
9'-7"
3'-8"
1'-5"
5'
620
45
9
500 wg.
Hemi.
10'
4'-2"
1'-8"
5'
950
37130
8 ( 6
1000 wHemi.
16'
4'-5"
i'$"
10'-1"
i,i300
17 15
6 j 5
1450 wg.
Ellip.
I
17'-4"
4'-11"
1'-9"
11'-7"
2,650
12
4
Ellip.
23'-li"
4'41"
1'-9"
16'
3,520
8
4
[---1990 wg.
1 461/2"
Mmenslons and specifications shown are appraodmate. Individual vessels may vary.
' Leg spacing +I- r. Leg widths and spacing may vary based on mfg. location. Check with Your salesperson for details. 12o, 2so, 320 wg. standard tanks
- no holes In legs (one center hole on request). SW and 1= wg. standard tanks- 2 holes 16' on center. 14M wg. and up as shown above.
'• FW load and stack guant ties vary by shipping location- Check with your salesperson for detail.
General S eciflcations
- Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels, Section Vill, Division 1.
Complies with NFPA 58.
- Rated at 250 psig from -20° F to 125' F. All vessels registered with National Board.
- Two service options available:
Option 1: Ready -to -bury underground option, coated with either powder coated phenolic epoxy finish
or liquid applied epoxy primer coat followed by urethane top coat, supplied with composite
AG/UG dome.
Option 2: Aboveground option, coated with either powder coated TGIC polyester finish or liquid
applied epoxy primer coat followed by urethane top coat, supplied with steel AG/UG dome.
- All vessels are shipped vacuum pre -purged to enable simplified first fill of the vessel.
Updated June 30, 2015
r ,
r
....
• • Owaorw.vrre,�t �-
'' I f•fi �. tit
, frh : r Atrciw„� J�!
.�. -W1*fT4pTt
LIT
1 M
IL
• C�tiii0 , . .
• r
C Tr
n a �od— «" , • ;/•'• fJI
1
• _ PROPANE CONSTRUCTION NOTES
1. All pipe and fittings above ground and inside building shall be
SCH..40 Galvanized ASTM A120 or AGA approved.corrugated
stainless steel •(C.S.S.T.) pipe.
2. All polypipe and fittings shall be ASTM D251.3 or ASTM D2517
and sham bye b ctrjei-oufside underground at a depth of 18" with
warning tape and tracer wire. -
3. All pipe and meter locaflons are approximate and subject to
change..
.4. All polypipe shaff be joined by heat fusion or approved mechanical .
couplings.
5. All'galvanized p1pe shall be threaded.
6. AI pipe shag be pressure tested to 20 PSI fog a period of 24
hours. _ .
f
' UNDERGR0 VD TANK INSTALLATION
'
2" to 6"
• DOWNGRADED AWAY
.•
..
-
FROM DOME
"' "• •— '
i
. •
Mt . sr
• 10 IL IL :
op
f
•
i ANODECABLE
i
• -!
' , ••
.
SACRJ Ff CIAL ANODE •
:.,.•�• • . _
•• • •
;, •,•,
•
(MAGNESIUM eA,G)
• • .� _
�:
M
- 1 REGULATOR .
f
• SHUT OA3 OFF AT
• • CWTSMD H VALVE
rusD E
RQ . -
. NARK OG TAPE Y
•� • RISE
• CR"E/COHCRETE SLEEVE _
o• 00. 0• • •�• • • • • .� p • • + • r• • • • �• p O o•
•
• •••,a'�
O • • • • �,•'I•• • • • •I •I obi• • • I •� I •r.•O • • ••�'r•-
f •
r + • i Q • • •T Of•-• 1
• � • • • •NIts • . • � ..,,
0 Q • •O
•° ' MUCROaOVflo V-OAS CONUtiM SERVICE LIH7E m
' TRACE NIXg LO