HomeMy WebLinkAboutCreekside Lot 75-digi02��'CPL • Gf pr�pY
", --
02 — —
9<S �3TNG •�N`'Q�ci • • •
•
UES Project No: 3360.1800067.0000
Workorder No: 226292-1
Report Date: 03/03/2021
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In -Place Densitv Test Resort
Client: D.R. HORTON, INC. EAST FLORIDA DIVISION UES Technician: Johnnie Smith
1430 Culver Drive, NE Date Tested: 03/02/2021
Palm Bay, FL 32907
Project: CMT CREEKSIDE
Yorktown Drive & Okeechobee Road,Fort Pierce, County, FL
Type of Test:
Area Tested: 3317 Trinity Circle, Ft. Pierce Field: ASTM D-6938 Nuclear Gauge Method
Material: Fill Laboratory: ASTM D1557 Modified Proctor
Reference Datum: 0 = Top of Final Grade
The tests below meet the 95% minimum compaction requirement.
Maximum
Optimum
Field Dry
Field
Soil
Pass
Test
Density
Moisture
Density
Moisture
Compaction
or
No.
Location of Test
Range
(pcf)
(%)
(pcf)
(%)
(%)
Fail
1
E Section
0-1 ft
118.6
10.8
117.4
10.0
99
Pass
2
W Section
0-1 ft
118.6
10.8
116.9
10.3
99
Pass
3
Circle
0-1 ft
118.6
10.8
113.9
10.8
96
Pass
Remarks: Permit:2011-0162
This item has been digitally signed
and sealed by Thomas Dominic
Montano, P.E. on the date adjacent
to the seal. Printed copies of this
document are not considered
signed and sealed and the
signature must be verified on any
electronic copies.
Reviewed By
GFA International, Inc
Certificate of Authorization No. 4930
��� '�•�•'• ♦��� Thomas Dominic Montano PE#84146
*Mlr = Mar 3 2021 3:29 PM
ntano
•� F ��ian:�;
�. F I
�` 1r `ineer No. 84146
�r�11 . 11%,`
Dacu>u,
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1