Loading...
HomeMy WebLinkAboutCreekside Lot 82 Temp Toilet®UNIVERSAL" ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: Permit No. Project: eQn� /Gs iae Address: 334<_ -791P TY 0_ /A_ g2 Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): ,,20/,r-0/7/ BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground I Storm Piping & Test I I Insulation Sheet Rock I I Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area inspected/Code: VY Z % Inspection Results: h�AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: %,. 'T i Cc-7 SZ 1. 2. 3. 4. 5. 6. 7. Inspector's Name:Il`�,.bs.1.�_, - Lic.#: B/J 4f688' OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com