Loading...
HomeMy WebLinkAboutInspection Docs (2) i RECEIVED FEB 2 0 2010 permitting Department t - ---- Pianning & Development Services St.Lucie Countv Building & Code Regulation Division 2300 Virginia dive p<.b 0n R�4 Q >nl .,_ ®yrfr fierce, FL 349982 �7 }��y°� �{y/p �1���������� Fax �!`�''�Y1'V6.��a9'6$'3 Request for 30-Day Temporary Power Release Date: e2_1 Permit Number: 70 Project S -- Project Address: THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY(30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE ` REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: I. This temporary power release is requested for the above stated purpose only,and there will be no occupancy of any type,other than that permitted by construction during this time period. 2. As witness by our signatures,we hereby agree to abide by all terms and conditions of this agreement, Including Building Division Policy,which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled"Requirements for 30 Day Power for Testing"have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of$100.00 will be required to lift the Stop Work Order. i WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST.LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION,INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. OWNE IGN DATE a� GEN L CbNTRA SIGNATURE DATE CTRICAL CONTRACTOR SIGNATURE DATE I l I FILE 0 Planning & Development Services Building & Code Regulation Division �. 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTLON SOIL TREATMENT PERMIT #: 1767- OB ADDRESS:311 h 6,oSAVy,,e. 0 f,-t 5,-t-A> e3�1�1N5 BUILDER/CONTRACTOR: 2 K 14ortUV\ PEST CONTROL CONTRACTOR: M A-S 5F.� 5 5_7 i2 V-KG S S ,s, W- _ PjEST CONTROL LICENSE #: 7171 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. 9,4bre feet if area treated: S Chemicals used: rr s� f v Percentage of solution: Total gallons used: /1 (D Date of Treatment: 2/ Time of Treatment: 9 . )3 ct m Footing Slab 1st Treatment 1st Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other Perimeter for Final Inspection 1st Treatment G Re-Treat Signature of Exterminator Date Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection fee charged. I FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. I Revised 7/24/2014 APPROVED i • Phone 954-784-2941 800-848-1919 r�� ®� Fax 954-784-7875 V &TESTING INC. 5 www.fed-eng.com 250 SW 13th Ave Pompano Beach,FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 116, Creekside Date: November 24, 2017 Address: 3117 Yellowstone Circle, Fort Pierce, FL 34945 Order#: 17-DR-1156 Area Tested: Building Pad Permit#: Material Type: Brown Sand with Some Rock Tech: SL Client: D.R. Horton, Inc. I o Address: 1430 Culver Drive NE Compaction Req.. 95/e e P Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test Probe Moist Dry Proctor Optimum TEST LOCATION Elev. ° Density Value Moisture Compaction Pass /O # Depth PCF PCF 1 Center of Pad 12" FL 9.2 107.2 112.5 11.0 95.3% Yes 2 SW Corner of Pad 12 FL 10.5 106.9 112.5 11.0 95.0/e Yes 3 NE Corner of Pad 12" FL 9.8 108.4 112:5 11.0 96.4% Yes 4 5 6 7 8I 9 10 I 11 � i 12! i 13 14 Remarks: See Reverse Side(Page 2 of 2)for Additional Information for Disclaimer This is a Compaction Test only on the top 12"of the pad and is not a verificatiohr cif Soil Bearing Capacity. Legend for Elevation: PR Proofroll 1,2,3= 1st,2nd,3rd Lift Submitted by:,, SL Springline FL=Final Lift ��Keith,Ledlanc,'f?�E. 0 SG Subgrade BG=Below Grade - Federal En&,,eering& Testing, Inc. BCi -1'Basecourse BOF=Bottom of Footing -Florida Reg-No.59394 TOP=Top of Pipe FG=Finished Grade -Certifilcate-'o�Authorizatian#^5471 As a imutual protection to clients,the public and ourselves,all reports are submitted as the confidentiar ro�erty of clients,and authorization fob publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.A density,test datermines the degree of Gpalpaction of the tested layer of material only.A density does not replace a soil bearing capacity determination.These density tests do not ce"nig,tFe-u6dei,yMg.soil mat's7s"velow the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur.A soil boring test isii�qquired to cerPif that the,underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, 9—oll'6orings be performed to evaluate the suitability of the underlying soil to support the proposed structure.After laying dormant for a period of 90 days or after tfeavy ral, 4d!ii s,retesting must be performed on this work! l' PAGE 1 of 2 I Compacted Soils Method ®-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTIVI D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering &Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re-compacted and re-tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 • Phone 954-784-2941 L i o. ederlbi 800-848-1919 Fax 954-784-7875 8 TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach,FL 33069 j Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 116;Creekside Date: November 24, 2017 Address: 3117 Yellowstone Circle, Fort Pierce, FL 34945 Order#: 17-DR-1156 Area;Tested: Building.Pad Permit#: Material Type:. Brown Sand with Some Rock Tech: SL i Client: D.R. Horton, Inc. Add less: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 I Test Probe Moist Dry Proctor Optimum # TEST LOCATION Depth Elev. % Density Value Moisture Compaction Pass PCF PCF % 1 Center of Pad 12" FL 9.2 107.2 112.5 11.0 95.3% Yes 2 1 SW Corner of Pad 12" 1 FL 10.51 106.9 112.5 11.0 95.0% Yes 3 NE Corner of Pad 12" FL 9.8 108.4 112.5 11.0 96.46/o Yes 4 51' 6 � 7 8 , I 9 � I 101 11 � 12 13' 14� Remarks, See Reverse Side(Page 2 of 2)for Additional Information for Disclaimer This is a Compaction Test only on the top 12"of the pad and is not a verification.of Soil Bearing Capacity. Legend for Elevation: PR-Proofroll 1,2,3= 1st,2nd,3rd Lift Submitted by.`- SL=Springline FL=Final Lift -Keith-LeBlanc,P.E. SG Subgrade BG=Below Grade -`,Federal Engineering Testing, Inc. BC Basecourse BOF=Bottom of Footing .Florida Reg-No.59394 TOPS=Top of Pipe FG=Finished Grade 1 -Certificat2 of Authorization5471 As a mutual protection to clients,the public and ourselves,all reports are submitted as the confidential;nroperty of clients,and authorizatioc for'publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.A densit'VA61 determines the degree cf ccmpaction of the tested layer of material only.A density floes not replace a soil bearing capacity determination.These density tests do noYcertify;the-undeii'yingsoil mkerl&�s-below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur.A soil boring testis required to certi6,tha`,Aae nderlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils,we-rec6mrneenc7 that E=oil;,borings be performed to evaluate the suitability of the underlying soil to support the proposed structure.After laying dormant for a period of 90 days or after heavy rainl:,UAs,retesting must be performed on this work. I PAGE 1 of 2 • . s Compacted Soils Method D-6936 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering &Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re-compacted and re-tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. _. - Page ,, DEC 0 Phone 964-784-2941 ederal PEt;^aill' unty 800-848-1919 St. Lucie County,1 L Fax 954-784 7875 &TESTING INC. www.fed-eng.com 269 sW 13th Ave Pompano Beach,FL 33M Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 116, Creekside Date: November 24, 2017 Address: 3117 Yellowstone Circle, Fort Pierce, FL 34945 Order#: 17-DR-1156 Are Tested: Building Pad Permit#:1$7y2 — pG /kS'— Material Type: Brown Sand with Some Rock Tech: SL Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test Probe Moist Dry Proctor Optimum TEST LOCATION Elev. ° Density Value Moisture Compaction Pass # Depth �0 PCF PCF % 1 Center of Pad 12" FL 9.2 107.2 112.5 11.0 95.3% Yes 2 SW Comer of Pad 12" 1 FL 1 10.5 106.9 112.5 11.0 95.0% Yes 311 NE Corner of Pad 12" FL 9.8 108.4 112.5 11.0 96.4% Yes 4 5 6 7 8 9 10 ' 11 12 I 13 Remarks: See Reverse Side(Page 2 of 2 for Additional Information for Disclaimer %C, s This is a Compaction Test only on the top 12"of the pad and is not a verification of S jng Ca aci i Legend for Elevation: / = 0. PR Proofroll 1,2,3=1st,2nd,3rd Lift Submitted by: / SL Springtime FL=Final Lift Keith LeBlanc,Pity-0 ; StPTWf,7 r,5� SG=Subgrade BG=Below Grade Federal Engineer �sting�lnc. P� BC I Basecourse BOF=Bottom of Footing Florida Reg.No.594 LOR1Q•• co, /.� --- TOP=Top of Pipe FG=Finished Grade Certificate of Authorizdn ���L As a,mutual protection to clients,the public and ourselves,all reports are submitted as the confidential property of clients,and authorizatio py� flgn,�f �rhents, conclusions or extracts from or regarding our reports is reserved pending our written approval.A density test determines the degree of compactio Ihhkk s ad layer of i material only.A density does not replace a soil bearing capacity determination.These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur.A soil boring test Is required to certify that the underlying soils will support the i proposed structure without settlement.If no soil borings have been performed to verify the underlying soils,we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure.After laying dormant for a period of 90 days or after heavy rain/storms,retesting must be performed on this work'. PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering&Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re-compacted and re-tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 Phone 954-784-2941 L i ederit- 800-848-1919 Fax 954-784-7875. 8 TESTING INC. WWW.fed-eng.com 250 SW 13th Ave Pompano Beach,FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 116, Creekside Date: November 24,2017 Address: 3117 Yellowstone Circle, Fort-Pierce, FL 34945 Order#: 17-DR-1156 Area Tested:' Building Pad Permit#: 1767— / Material Type: Brown Sand with Some Rock Tech: SL Client: D.R. Horton, Inc. Address; 1430 Culver Drive NE Compaction Req.: 95%, Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test I Probe Moist Dry Proctor Optimum TEST LOCATION Elev. Density Value Moisture Compaction Pass # Depth % p PCF PCF % 1 ICenter of Pad 12". FL. 9.2 107.2 112.5 11.0 95.3% Yes 2 :SW Corner of Pad 12" FL 10.5 106.9 112.5 1 11.0 95.0% Yes 3 kE Corner of Pad 12" FL 9.8 108.4 112.5 11.0 96.4% Yes 4 5 6 7 8 9 10 12 i 13i 14 Remarks: see Reverse Side(Page 2 of 2)for Additional Information for Disclaimer j This is a Compaction Test only on the top 12"of the pad and is not a verifidatityri of^aril Bearing Capacity. Legend for Elevation: iov PR=1 Proofroll 1,2,3=1st,2nd,3rd Lift Submitted by: SL=lSpringline FL=Final Lift ` Keith\LeBlanc,Pd: . - ` r 7f/t7 SG;Subgrade BG=Below Grade - Federal,Erygifle�;ring&T_ f g, In BC=Basecourse BOF=Bottom of Footing Florida Reg.-No.59394 TOP-Top of Pipe FG=Finished Grade Certifri;atei cif_Agt orizatiori e;z 471 I` Copy As a mutual protection to clients,the public and ourselves,all reports are submitted as the confidential'proriPrty of clients,and authorization,faC publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.A density,te� atemiines the degree Jf,c?mpaction of the tested layer of material only.A density does not replace a soil bearing capacity determination.These density tests do not,ce.rfify the undErlyfnd sblfTate als-below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur.A soil boring test'is'r¢4u'.rs .to cerri5j-fhat'the'underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils,we recommend.that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure.After laying dormant for a period of 90 days or after heavy73la"16torms,retesting must be performed on this work.i PAGE 1"of 2 I Compacted Soils Method D-6936 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only,In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering &Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re-compacted and re-tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 ..... ..... 9 f Ail 18 41" LC iL ST LUCIE COUNTY UTILITIES-P.O.BOX 728,FT.PIERCE.FL 34982 � NAME 5t, Lucie County - PCIS s :59:00 -- f 08-18-201 08 7 ACCT•#�• • .." � [.�'' ;it � �" (.�' i� 6787/6188 Ep SERVICE ADDRESS D.R. HORTON 3117 YELLOWSTONE CIR LOT 116 FORT PIERCE E Ow"'VS, J fFL 34945 SUBDIVISION, LOT ( f BLOCK �E ( f 3 •' Amount Tendered: 174.00 L . BILLING-ADI7RESS '4- � 174.00 �. � r . ��• �,� f� Amount Paid: � �1 _��,- r - -�4 0.00 'i Change Due" i PHONE# MOVE IN/CLOSING DATE Thank You This application hereby request and authorizes the Utility to render water and/or sewage disposal services to the premises described above in accordance with the Utilities present or future rates, rules and regulations,which by reference are made a part of this contract.Applicant agrees to pay User ID: RODRIGUEZM the Utility promptly for such services in accordance with the established rules and regulations. CUSTOMERS DEPOSITS ARE NON NEGOTIABLE OR TRANSFERABLE. SOCIAL SEC/ FED ID SPOUSE SOCIAL SEC. OFFICE USE ONLY DATE RECEIVED � �I CASH �' IfVI RECEIVED BY UV 1. ,,� tam ,�,,k •.... „,.: _ ST.LUCIE COUNTY UTILITIES-P.O.BOX 728 FT.PIERCE FL 34982 NAME St� Lucie County - PCIS 1 08 18-2017 08:59:22 { ACCT.# 6767/6190 p SERVICE ADDRESS D.R. HORTON f 31d9 YELLOWSTONE CIR LOT 118 FORT PIERCE •.... FL 34945 j Sl BDIVISION LOT / BLOCK ` BILLING A�DRESS Amount Tendered: 174.00 J �: Amount Paid: 174.00 i PHONE# MOVE IN/CLOSING DATE Change Due: 0.00 i Thank You This application hereby request and authorizes the Utility to render water and/or sewage disposal services to the premises described above in accordance with the Utilities present or future rates, rules and regulations,which by reference are made a part of this contract.Applicant agrees to pay i the Utility promptly for such services in accordance with the established rules and regulations. User ID: RODRIGUEZM CUSTOMERS DEPOSITS ARE NON NEGOTIABLE OR TRANSFERABLE. SOCIAL SEC/ FED ID i SPOUSE SOCIAL SEC. OFFICE USE ONLY DATE RECEIVED— �� CASH QRW; �� RECEIVED BY E��` �